S. Gourlay 7/19/01 T2 Working Group Summary T2 Working Group Summary Magnet Technology: Permanent Magnets, Superconducting Magnets, Power Supplies Conveners:

Slides:



Advertisements
Similar presentations
Superconducting Magnet Program S. Gourlay CERN March 11-12, Lawrence Berkeley National Laboratory IR Quad R&D Program LHC IR Upgrade Stephen A.
Advertisements

Ramesh Gupta, BNL D1 Dipole Design / IR Magnet Study LARP Collaboration Meeting, Oct 5-6, D1 Dipole Design Task (terminated in 2005) IR Magnet Study.
SC Magnets at Fermilab New Collaring and Coil Pre-stress Limit for a Nb3Sn Magnet Alexander Zlobin Technical Division Fermilab.
September 2007 FP7-IA HFM JRA proposal G. de Rijk (CERN)1 FP7-IA HFM JRA proposal   The proposal is under discussion: we welcome input from potential.
Block-coil NbTi dipoles for 6 Tesla Rapid-cycling SuperSPS
11 September 2007 FP7-IA HFM JRA proposal G. de Rijk (CERN)1 FP7-IA HFM JRA proposal   Outline Motivation General description Proposed Work Packages.
HTS Coils for High Field Hybrid FCC Dipoles Ramesh Gupta March 23-27, Superconducting Magnet Division HTS Coils for High Field Hybrid FCC Dipoles.
Overview of Possible LHC IR Upgrade Layouts CARE HHH-2004 Workshop CERN 8-11 November 2004 J. Strait, N.V. Mokhov, T. Sen Fermilab bnl - fnal - lbnl -
Applied superconductivity group L. García-Tabarés, F. Toral, I. RodriguezCIEMAT, I/2008.
Development of Superconducting Magnets for Particle Accelerators and Detectors in High Energy Physics Takakazu Shintomi and Akira Yamamoto On behalf of.
Superconducting Large Bore Sextupole for ILC
Neutrino Factory Workshop UK Magnet Manufacturing Capability Elwyn Baynham CCLRC Rutherford Appleton Laboratory, UK Elwyn Baynham UKNF Oct 2003.
Superconducting Magnet Division Ramesh Gupta High Field Magnet R&D with YBCO July 26, 2011Slide No. 1 EUCARD2 VIDEO CONFERENCE.
MCTF Michael Lamm MUTAC 5-Year Plan Review 22 August Magnet R&D for Muon Accelerator R&D Program Goals Proposed Studies Preliminary Effort and Cost.
1 A Joint Proposal for US-Japan Cooperation Program Proposal to JSPS US-Japan collaboration fund R&D of superconducting magnet technology for high intensity.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Fermilab July 19, 2006 J. Tompkins -1- RDR Magnet Systems Group Vancouver GDE Meeting Overview J. Tompkins, FNAL.
Concept of a hybrid (normal and superconducting) bending magnet based on iron magnetization for km lepton / hadron colliders Attilio Milanese, Lucio.
E. Todesco PROPOSAL OF APERTURE FOR THE INNER TRIPLET E. Todesco CERN, Geneva Switzerland With relevant inputs from colleagues F. Cerutti, S. Fartoukh,
Magnets for muon collider ring and interaction regions V.V. Kashikhin, FNAL December 03, 2009.
AARD Sub-panel at Fermilab Feb , 2006 LARP Magnet R&D Program - S. Gourlay1 BNL -FNAL - LBNL - SLAC LARP Magnet R&D Program Steve Gourlay AARD Sub-Panel.
The FCC Magnet Program: Challenges and Opportunities for HTS
Towards Nb 3 Sn accelerator magnets, challenges & solutions, history & forecast Shlomo Caspi Superconducting Magnet Group Lawrence Berkeley National Laboratory.
11 T Nb3Sn Demonstrator Dipole R&D Strategy and Status
Bnl - fnal- lbnl - slac US LHC Accelerator Research Program A Quadrupole Design for Crab Cavity Optics Ramesh Gupta Brookhaven National Laboratory Upton,
F James T Volk June Permanent Magnets for Linear Colliders James T Volk Fermilab.
F March 31, 2001David Finley / Fermilab Saturday Morning Physics Slide 2.1 Saturday Morning Physics - Accelerators Accelerators What’s Up Now? What’s Up.
Review of Quench Limits FermilabAccelerator Physics Center Nikolai Mokhov Fermilab 1 st HiLumi LHC / LARP Collaboration Meeting CERN November 16-18, 2011.
Superferric CEA. CEA is involved in the FAIR/GSI project: Responsible for the conceptual design preparation and technical follow-up of 24 superferric.
Fermilab 02/01/07NFMCC on MCTF Magnets1 Magnet R&D… through the MCTF Michael Lamm.
General Considerations for the Upgrade of the LHC Insertion Magnets
LARP Magnets FNAL contribution to LARP (LHC Accelerator Research Program) FNAL core-program support to LARP DOE Annual Program Review - May 16-18, 2006.
Activities for LHC Upgrade at Texas A&M University Peter McIntyre Texas A&M University
Open Midplane Dipole (OMD) Design for Dipole First Layout R. Gupta (BNL), N. Mokhov (FANL) bnl - fnal- lbnl - slac US LHC Accelerator Research Program.
J. Strait Fermilab 16 October 2006 Consideration on LHC upgrade from A US perspective.
LARP Magnet Progress Michael Lamm For the LARP Collaboration bnl - fnal - lbnl - slac US LHC Accelerator Research Program All Experimenters’ Meeting Monday,
LARP Collaboration Meeting, April 26-28, 2006Gian Luca Sabbi HQ Design Study (WBS ) LARP Collaboration Meeting April 26-28, 2006 N. Andreev, E.
Dipole design at the 16 T frontier - Magnet R&D for a Future Circular Collider (FCC) at Fermilab Alexander Zlobin Fermilab.
US LHC Accelerator Research Program (LARP) Background  Proposed in 2003 to coordinate efforts at US labs related to the LHC accelerator (as opposed to.
BNL High Field and HTS Magnet Program Ramesh Gupta BNL, NY USA H T.
1 V. Kashikhin for ILC ALCPG 2007, FNAL Meeting October 23, 2007 Ring to Main Linac Magnets.
Joint IR Studies: Operating Margins Nikolai Mokhov Fermilab bnl - fnal- lbnl - slac US LHC Accelerator Research Program LARP Collaboration Meeting SLAC.
Muon Cooling Channel Superconducting Magnet Systems Muon Collider Task Force Meeting on July 31, 2006 V.S. Kashikhin.
HE-LHC, 10/14/2010GianLuca SabbiUS LARP Magnet Development LHC Accelerator Research Program Magnet Development GianLuca Sabbi for the US LARP collaboration.
U.S. Activities on the High-Luminosity LHC: LARP Sustainability & Evolution as a Construction Project HiLumi-LARP Collaboration Meeting October 26, 2015.
Helical Solenoid Development
Magnet Test Facilities at Fermilab Peter Limon April 12, 2006.
Prepare specifications/requirements magnetic and mechanical characteristics operation mode Development of Test facility - dedicated test facility to study.
Next Steps in Magnet R&D Steve Gourlay LBNL EuCARD Workshop on a High Energy LHC Malta October 14, 2010.
FCC EuroCirCol kick-off,CERN, 3 rd June 2015.
1 BNL -FNAL - LBNL - SLAC P. Wanderer IR’07 - Frascati 7 November 2007 U.S. LARP Magnet Programme.
DESIGN STUDIES IR Magnet Design P. Wanderer LARP Collaboration Meeting April 27, 2006.
Report from Session 2 Main Dipoles. P. McIntyre 2005 – 24T ss Tripler, a lot of Bi-2212, Je = 800 A/mm2 E. Todesco T, 80% ss 30% NbTi 55 %NbSn.
Emittance reduction by a SC wiggler in the ATF-DR September 16 th, 2009 Yannis PAPAPHILIPPOU and Rogelio TOMAS ATF2 weekly meeting.
F James T Volk Arpil Permanent Magnets for Linear Colliders James T Volk Fermilab.
Long Quad (LQ) & High Gradient (HQ) Series Alexander Zlobin bnl - fnal- lbnl - slac US LHC Accelerator Research Program DOE LARP review Fermilab, June.
LARP Joint IR Studies A. Zlobin, Fermilab bnl - fnal- lbnl - slac US LHC Accelerator Research Program CARE-HHH-APD Mini-Workshop IR’07 Frascati (Italy),
IR Magnets for Muon Collider Alexander Zlobin and Vadim Kashikhin Muon Collider Physics Workshop, Fermilab November 12, 2009.
Magnet Strategy Michael Lamm Technical Division/Magnet Systems Department Fermilab Muon Accelerator Program Review Fermilab, August 25, 2010.
The FCC Magnet Program seen from CERN Meeting at ASC-2014, Charlotte, August 13t, 2014.
Yingshun Zhu Accelerator Center, Magnet Group
Yingshun Zhu Design progress of QD0 in CEPC Interaction Region
SLHC –PP WP6 LHC IR Upgrade - Phase I.
At ICFA Mini-Workshop on High Field Magnets for pp Colliders,
Ramesh Gupta Brookhaven National Laboratory
Muon Collider Magnet Technologies/Challenges
Muon Collider SR and IR Magnets
Review of Quench Limits
JLEIC Magnet R&D Tim Michalski NP Community Panel Review of the EIC
Crab Crossing Named #1 common technical risk (p. 6 of the report)
Presentation transcript:

S. Gourlay 7/19/01 T2 Working Group Summary T2 Working Group Summary Magnet Technology: Permanent Magnets, Superconducting Magnets, Power Supplies Conveners: Stephen Gourlay and Vladimir Kashikhin Organizing Committee Contacts: J. Strait and G. Dugan

S. Gourlay 7/19/01 T2 Working Group Summary Outline T2 Working Group A glance at recent progress Highlights –Permanent Magnets –Superconducting Collider Magnets Review of US Magnet Programs Summary

S. Gourlay 7/19/01 T2 Working Group Summary Organization Superferric Magnets Very High Field Magnets Collider Magnets Permanent Magnets and Applications Magnets for the Muon Collider Detector Magnets Magnetic Measurements High Gradient Quads Magnet R&D Issues for the Future Quench Protection Bill Foster Shlomo Caspi Sasha Zlobin Bill Fowler Mike Green Katherine Pacha Hank Glass Mike Lamm Ramesh Gupta A. McInturff Topics Coordinators

S. Gourlay 7/19/01 T2 Working Group Summary Participants S. Caspi, S. Gourlay, M. Green, G. Sabbi Berkeley National Laboratory R. Gupta, R. Palmer, B. Parker, S. Peggs, P. Wanderer, R. Weggel Brookhaven National Laboratory Rob Van Weelderen CERN G. Dugan, A. Mikhailichenko, M. Tigner Cornell R. Diebold Diebold Consulting B. Strauss Department of Energy P. Bauer, G.W. Foster, W. Fowler, H. Glass, H. Jostlein, V. Kashikhin, M. Lamm, P. Limon, E. Malamud, J.-F. Ostiguy, I. Terechkine, R. Yamada, V. Yarba, A. Zlobin Fermi National Laboratory K. Pacha U. Iowa M. Wake KEK M. Kumada NIRS D. Walz SLAC P. McIntyre, A. McInturff, A. Sattarov Texas A&M University

S. Gourlay 7/19/01 T2 Working Group Summary Recent Progress Significant progress in magnet development since Snowmass ’96. –Conductor Nb 3 Sn and HTS –Magnets FNAL Transmission line Permanent magnets for beam transfer and storage rings Increased Nb 3 Sn magnet development (~15 T) –Fermilab vertical magnet test facility for model magnets RHIC industrial procurement – provides cost basis LHC IR Quadrupole R&D and Pre-production

S. Gourlay 7/19/01 T2 Working Group Summary Superconducting Magnets

S. Gourlay 7/19/01 T2 Working Group Summary Permanent Magnets New materials –Sm 2 Co 17 –Nd 2 Fe 14 B Applications –LC Adjustable permanent magnet quadrupoles –VLHC Injection line, correctors, Lambertsons 300 T/m PM quadrupoles for IR’s 4 Tesla PM or hybrid accelerator dipole –TESLA Damping ring magnets –Wigglers Higher Fields

S. Gourlay 7/19/01 T2 Working Group Summary Permanent Magnets R&D Trends –Accelerator Magnets – long term thermal and radiation stability –Active and passive correction systems Hybrids (PM + SC) –Adjustable quadrupoles - high magnetic center stability Mechanical systems to provide adjustability –Cost optimization - accelerator magnets Competition for conventional magnets –High fields - multipole fields comparable with SC –Reduced capital and operational costs

S. Gourlay 7/19/01 T2 Working Group Summary Superconducting Magnets Conductor Performance Performance/Cost/Industrial Capacity NbTi –Hc 2 is too low to benefit much from further increases in J c –Cost is probably at a minimum Nb 3 Sn –Factor of 3 improvement in J c in past 5 years –DOE sponsored conductor development program is showing good progress after first year. Funding for next year looks promising. HTS –Very expensive and still needs vast improvement in performance

S. Gourlay 7/19/01 T2 Working Group Summary Collider Magnets Majority of discussion was on magnets for large colliders –Significant cost component –Options Low field (superferric) Medium field - RHIC scale-down plus others Orphan Option? High field

S. Gourlay 7/19/01 T2 Working Group Summary Collider Magnets Superferric (2 – 3 Tesla) Fermilab Transmission Line Magnet Used for VLHC Design Report (Bmax ~ 2T) Texas Accelerator Center Magnet Cold iron, 3T, Multiple current supplies Simple and low power cryogenics Standard cryogenics (more complex) But higher dynamic range

S. Gourlay 7/19/01 T2 Working Group Summary Collider Magnets Dipoles (4 – 15 Tesla) Many Options Conductor –NbTi and Nb 3 Sn Issues –Cost (aperture, length, complexity) –Synchrotron radiation load Beam screens vs photon stops –Magnetization effects –Dynamic range, multiple power supplies –Quench Protection –Magnetic measurements Stretch-wire alignment and strength IR Quads Technically challenging Large aperture –Field quality, heat load High gradient –> 300 T/m High heat loads –600 W/side VLHC-1 Mechanical alignment and stability Valuable experience with LHC quads HTS Candidate?

S. Gourlay 7/19/01 T2 Working Group Summary US Magnet Programs BNL, LBNL, FNAL, Texas A&M –Basic geometries Cos-theta Block Common coil (Block)

S. Gourlay 7/19/01 T2 Working Group Summary US Magnet Programs Brookhaven National Laboratory Development of HTS-based magnets –Neutrino factory magnets –IR quads

S. Gourlay 7/19/01 T2 Working Group Summary US Magnet Programs Berkeley National Laboratory High field, Nb 3 Sn –Common Coil –Conductor and cable development Medium field VLHC design Bi-2212 Cable 14.7 T Common Coil

S. Gourlay 7/19/01 T2 Working Group Summary US Magnet Programs Fermi National Laboratory High Gradient Quads for LHC Permanent Magnets –Quads for a LC Superferric –Transmission Line Magnet High field, Nb 3 Sn –VLHC magnets 11 T common coil and cos-theta

S. Gourlay 7/19/01 T2 Working Group Summary US Magnet Programs Texas A&M University High field (12 T) –Small bore –Stress-management for high fields –6.7 T NbTi prototype of 12T block magnet –“TeV Tripler” design studies

S. Gourlay 7/19/01 T2 Working Group Summary Summary More magnet options are now available –These options should be evaluated in terms of achieving the lowest cost machine –They offer flexibility in determining other important parameters Real cost effective applications can only be realized using an integrated approach and a more aggressive R&D program –Requires enhanced communication between magnet designers and accelerator physicists –A cost model that can be used to focus and evaluate technology options Expand in-depth Design Report work to other magnet options –Resources and effort required to bring the existing magnet technology options to a point where they can be reliably evaluated and considered for use in a collider design do not currently exist