Map Mod Indiana Status Next counties up Fountain Parke Randolph Martin Ripley.

Slides:



Advertisements
Similar presentations
In coordination with FEMA Kickoff Meeting Riverside County, CA May 27, 2010.
Advertisements

Portfolio Management, according to Office of Management and Budget (OMB) Circular A-16 Supplemental Guidance, is the coordination of Federal geospatial.
Many Agencies, One Solution Welcome to Washington Silver Jackets Preliminary Meeting Bellevue, Washington 5 August 2010.
Raising the Standard for Improved Flood Risk Management in the Midwest Raising the Standard for Improved Flood Risk Management in the Midwest Interagency.
Jon Keeling, PE, CFM Carey Johnson, CFM ASFPM 2012 Conference May 22, 2012 The Mission of Dam Safety Hazard Mitigation – Kentucky’s Experience.
Risk MAP Discovery Matanuska-Susitna Borough Information Exchange Sessions March 2013.
FEMA’s Flood Risk Review Meeting: Building Confidence in Risk MAP Products 2012 ASFPM National Conference San Antonio, Texas May 24, :00 pm.
Using Mitigation Planning to Reduce Disaster Losses Karen Helbrecht and Kathleen W. Smith United States: Federal Emergency Management Agency (FEMA) May.
Alabama’s Floodplain Management Program Tom Littlepage Alabama Office of Water Resources.
Overview of FEMA Actions and Accomplishments Doug Bellomo July 13, 2009 National Flood Risk Management Summit.
FEMA Update: Flood Map Modernization and Risk MAP Presented on behalf of FEMA by David I. Maurstad, PBS&J.
Update on Use of Hazus for FEMA Risk MAP Flood Risk Products Shane Parson – RAMPP PTS (URS)
Residential Structural Retrofit Program – A Collaborative Opportunity – California Earthquake Authority July 2010.
Risk MAP and Discovery FEMA Region [#], [WATERSHED NAME] Watershed Discovery Meetings [DATE]
Resilience Meeting: [Watershed Name] [LOCATION] [DATE]
Northwest Florida Water Management District Monday, August 22, 2011.
Update Training Meeting
Flood Risk Mapping Project Identifying the Risk Editorial Board Meeting [COMMUNITY NAME] Flood Risk Mapping Project.
In coordination with FEMA Scoping Meeting Lake County, California February 19, 2010.
FEMA’s Role in National Water Policy Supporting National Water Resource Policy Introduction Sandra K. Knight National Waterways Conference September 22-24,
Integrating Community Planning and Hazard Mitigation Planning Amanda Engstfeld FEMA Region X
Risk Map Early Demonstration Project Lackawanna County, PA CCO Meeting September 13, 2011.
Flood Risk Mapping Project Editorial Board Meeting [COMMUNITY NAME]
US Army Corps of Engineers BUILDING STRONG ® Flood Risk Management Update Stephanie Bray 12/10/2013.
Flood Risk Review Meeting: [Watershed Name] [LOCATION] [DATE]
Flood Risk Management Program Rolf Olsen Institute for Water Resources U.S. Army Corps of Engineers.
Using Digital Flood Hazard Data in the National Flood Insurance Program FGDC Coordination Working Group Scott McAfee Paul Rooney April 5 th, 2005.
Unit 1 Community Capabilities
Region III Activities to Implement National Vision to Improve Water Quality Monitoring National Water Quality Monitoring Council August 20, 2003.
Risk MAP National Outreach Strategy and Community Engagement 2010 National Flood Conference April 14, 2010 Presented by: Vince Brown, Courtney Partlow.
Risk Map Update FGCS Meeting Paul Rooney FEMA January 13 th, 2014.
Doug Bellomo April 6, NFDA Retreat & Conference “Risk MAP--Foundation, Transition, Integration” Risk MAP: An Update to NFDA.
Flood Map Modernization Multi-Hazard Flood Map Modernization NOAA Height Mod Conference 12/1/06 Dave Jula, Michael Baker Jr., Inc.
North Carolina White Oak River Basin Plan December 19, 2000.
Relevant, Ready, Responsive, Reliable 1 Addressing the Flood Risk Challenge.
Georgia Flood Risk Management - Beyond the Why and Getting to How 1 August 28, 2014 Flood Planning and Policy: Education / Outreach Workshop The Armstrong.
US Army Engineer Research and Development Center COASTAL OUTREACH ADVISORY TEAM Kick-off Meeting November 19, 2010 FEMA Region III Coastal Mapping Project.
Resilience Meeting: [Watershed Name] [LOCATION] [DATE]
Flood Map Modernization June 11,  Obtain Best Available Data  Develop Partnerships for Production that Enhance Capability (local, state, fed)
Mitigation Plan for Four New Jersey Counties Municipal Mitigation Measures prepared for: Camden, Cumberland, Gloucester, and Salem Counties prepared by:
Risk MAP Early Demonstration Projects in Region II 2011 Association of State Floodplain Managers May 17, 2011 Louisville, KY.
Risk MAP and Discovery FEMA Region [#], [WATERSHED NAME] Watershed Information Exchange Sessions [DATES]
U.S. Department of the Interior U.S. Geological Survey Silver Jackets Innovative Collaboration to Maximize Solutions.
North Carolina Tar-Pamlico River Basin Plan Final Scoping Meetings January 30 and 31, 2001.
Risk MAP and Resilience Mari Radford, CFM, Mitigation Planner Alison Kearns, CFM, Community Planner FEMA Region III.
FEMA’s Risk MAP Coastal Updates – An Overview Jonathan E. Westcott, P.E. ASFPM 2012 National Conference San Antonio, TX Session D.8.
Passaic County, NJ Initial Coordination Meeting FEMA Region II Mitigation Division October 6th, :00-11:00.
In coordination with FEMA Kickoff Meeting Ventura County, CA April 29, 2010.
Insert Date 1 Hurricanes-Inundation Overview Objectives: Improve forecasts of tropical cyclones and related inundation hazards to enhance mitigation decisions.
Discovery Meeting FEMA Region [#]. 2 Introductions.
Mitigation Directorate FEMA’s Mitigation Directorate and Hurricane Emergency Management The Mitigation Directorate supports Hurricane risk assessment and.
Flood Map Modernization Mitigation Division, FEMA.
Monmouth County Multi-Jurisdictional Hazard Mitigation Plan Update.
FLOOD STUDY Burlington County, NJ FEMA REGION II November 29, 2010.
Life-Cycle Flood Risk Management
Sally McConkey, P.E., D.WRE., CFM Illinois State Water Survey ASFPM Chair USACE Silver Jackets Workshop – August 2012.
Northwest Florida Water Management District Monday, August 22, 2011.
Rebuilding the System Reducing the Risk California Water Plan Plenary Session October 22-23, 2007.
Examples in Quantifying Flood Risk Doug Bellomo July 13, 2009 National Flood Risk Management Summit.
ASFPM National Conference 2009 Doug Bellomo June 11, 2009 Levees in a Risk MAP World.
Community Engagement to Advance Mitigation Action.
Risk MAP Discovery Malheur & Payette Counties Information Exchange Sessions July 2015.
David Knipe Engineering Section Manager 8. Future Applications of NHD.
BUILDING STRONG ® 1 Risk Management Center Silver Jackets Program Overview Jennifer Dunn USACE, Institute for Water Resources Silver Jackets Program Manager.
FEMA Risk MAP City of Yakima – Lower Yakima Discovery Information Exchange Session May 9, 2016.
Dr. John T. Wells, Dean and Director, VIMS Dr. Mark W. Luckenbach, Associate Dean, VIMS Dr. Morris Foster, Vice President for Research, ODU February 24,
FEMA’s Risk Management Directorate and Flood Mapping Program 2016 National Flood Determination Association Conference Sarah Ice, Risk Management Directorate.
North Carolina Lumber River Basin Plan
Risk MAP & the Little River Basin
Continuity Guidance Circular Webinar
Presentation transcript:

Map Mod Indiana Status Next counties up Fountain Parke Randolph Martin Ripley

The Paradigm Shift: Map Mod to Risk MAP

What is Risk MAP? 3 Through collaboration with State, Local, and Tribal entities, Risk MAP will deliver quality data that increases public awareness and leads to action that reduces risk to life and property.

Risk MAP is Science Based Risk MAP is here because new science is available that enables FEMA to: Develop reliable and accurate maps to identify communities’ risks More fully assess the level of flood risk that communities face Provide guidance to help communities develop better plans for mitigating risk Arm communities with the tools and information needed to communicate about risk and mitigation more clearly and confidently to their constituents 4

Engineering and Mapping Engineering and Mapping (E&M) includes: Updated data for 100% of Nation’s populated coast Current data for 80% of the NFIP stream inventory Three types of E&M Levee Coastal Riverine Why E&M? More precise and accurate maps More effective risk assessments Better mitigation plans Helps communities better understand their risk. Uses science to more accurately show risk on a map. It is the data that supports FEMA and its maps. 5

Prioritize Projects Prioritization includes: 2010: Based on risk, need, data availability 2011: Based on algorithm of risk, need, community contribution Enables FEMA to: Acquire data for future projects Develop products for high risk, need areas Leverage previous efforts Consider stakeholder input Provide technical assistance Provides a more scientific, transparent approach to identify communities to study and map. 6

What is the Watershed Approach? Uses the watershed as a study framework Evaluation of need to include unstudied stream reaches connecting multiple studied stream reaches within a watershed Areas for data processing may be identified on a watershed basis Aligns FEMA with agencies and the scientific community who already use a watershed approach. Watershed Approach 7

Elevation data includes: Inventory of existing elevation data Acquisition of elevation data on a watershed basis based on risk, need, and contribution Partnering to cost-share data acquisition and processing Increases the reliability of FEMA’s science to provide a more accurate picture of risk. Elevation Data Acquisition 8

Mitigation Planning Mitigation planning activities includes: Local mitigation planning support Revised guidance Community incentives Participation by nontraditional stakeholders in project lifecycle Products: National repository for Mitigation Plans Method to monitor risk reduction activities National Community Toolkit for Hazard Mitigation Planning Backed by better science, mitigation plans are more informed and actionable. 9

Risk Communications The science behind Risk MAP provides the foundation for communicating about risk reduction. Risk communications includes: Tools to strengthen community capability to communicate about risk A foundation for local risk communications Improves communications: Between FEMA and communities Between communities in a watershed Within communities Risk MAP Products: Project communication assessment tool Project communication planning tool Customizable fact sheets 10

11 Program Goals and Measures Ensure 80 percent of the Nation’s flood hazards are current by 2014 – the flood hazard data are new, have been updated, or deemed still valid through Risk MAP review and update process Goal 1: Data Gaps Address gaps in flood hazard data Increase State, local, and Tribal officials’ level of understanding of flood risk Goal 2: Awareness & Understanding Measurable increase of public awareness & understanding Ensure 80 percent of the U.S. population (excluding territories) is covered by a Local or Tribal hazard mitigation plan that is approved or approvable pending adoption Goal 3: Mitigation Planning Lead effective engagement in Mitigation Planning Percent of Local hazard mitigation plans approved using quality Risk MAP data or better Goal 4: Digital Platform Provide an enhanced digital platform Establish a culture of continuous improvement and executing projects aimed at reducing process cycle time and improving the quality of Risk MAP products and services Goal 5: Synergize Programs Align Risk Analysis programs and develop synergies Risk MAP GoalsRisk MAP Measures

Risk MAP Process

Risk MAP Products Flood Risk Assessment Data Flood Depth & Analysis Grids Changes Since Last FIRM Data Areas of Mitigation Interest Flood Risk Report Flood Risk Map Ad-Hoc Flood Risk Analyses Flood Risk Database

Risk MAP Datasets Changes since last FIRM Depth grids (10-, 25-, 50-, 100-, and 500-year) Percent Annual Chance Percent Chance over 30-years Depth grids (2-, 5-, and 200-year) (enhanced product) Depth grids (1%+) (enhanced product) Velocity grids (enhanced product) Annualized Depth (enhanced product)

Changes Since Last FIRM Identify areas and types of SFHA change between current effective/previous SFHAs and proposed/new SFHAs A visual comparison of old and new SFHAs Offers stakeholders transparency

Changes Since Last FIRM Structures added

Flood Depth Grid Increase flood risk awareness by communicating that risk varies within the mapped floodplain Final product can include 2-, 5-, 10-, 25-, 50-, 100-, 200-, and 500-year events Provides the necessary input for damage analysis

500-year Flood Depth Grid SR19 (2’) Neighborhoods (1-4’) School (<1’) Hospital (<1’) Above 500-yr but no access Fields (10-15’)

Percent Annual Chance > 10% < 1% 2% to 5% < 0.2%

Percent Chance Over 30 Years 100% chance (1 in 1 odds) 11-25% chance (1 in 10 to 1 in 4 odds) 76-99% chance (3 in 4 to almost 1 in 1 odds) More than 1 in 4 odds

Relationship: Return Interval -to- % Chance During 30 Years Risk of Flood at Least Once During 30 Year Time Period Equivalent Average Risk of Flood in Any Given Year Tolerable % Chance Approximate Odds % Chance Every Year Average Recurrence Interval Odds 3 %1 in %1,000 yr≠1 in 1, %1 in %500 yr≠1 in %1 in 70.5 %200 yr≠1 in %1 in 41.0 %100 yr≠1 in 100

Outreach Discovery Meetings (scoping, time & cost meeting expanded) Mapping & Engineering meeting – discuss the results of the engineering analysis before the maps are issued to the public. Flood Risk Open House – similar to what is done now Post Preliminary mitigation meeting – discuss the actions the community could take to reduce risk, based on the new analyses.

Risk MAP Wabash River Discovery Meetings Joint venture between Indiana DNR & Illinois State Water Survey Includes Lower Wabash and Middle Wabash / Busseron Watersheds (HUC8) Two “high level meetings” with federal / state stakeholders (Silver Jackets in Indiana Fall 2010) Six local meetings with local stakeholders

Risk MAP Discovery: Lower White River Watershed

Discovery meeting highlights 6 separate meetings with local stakeholders(2 sets of 3, Washington, Bloomfield & Spencer) 2 meetings with Indiana Silver Jacket team 4 meetings were videotaped Discovery report and Flood Risk Map

27 What is CNMS? Goal: – Produce a National inventory database of flooding sources corresponding to our mapping inventory that: Tracks program status on NVUE. Informs map planning production decisions - References mapped flooding sources as valid or as having an unmet need. Serve as FEMA’s mapping needs management system - MNUSS will be sunset. Document accomplishments - Resolution date of existing mapping needs will be captured.

Coordinated Needs Management Strategy Geospatial database of mapping needs Includes all streams draining greater than 1 sq mi DOW now working on final QA of initial data Validation of selected counties to be complete by March 2011 Used for planning for future mapping efforts

29 CNMS in FY11 and Beyond FEMA Regional Funding Allocations will be influenced by CNMS data in FY11 – Completion of stream-level validation is critical Continuous Lifecycle Validation – Annual maintenance cycle of validation information to monitor inventory decay rate based on 5-year assessment cycle For example, starting in FY11 effective studies from FY06 should undergo validation process Web-Based Application – Front-end application that allows easier interaction with CNMS data for non-GIS savvy users – Still being proposed at program level

LOMR Delegation DOW staff would review FEMA LOMR applications for FEMA Staff has attended training Target implementation in FY 2011 Advantages: Reduce overall processing time Local review Access to agent/reviewer

Indiana Floodplain Information Portal infip.dnr.in.gov New interface and base map complete 6 counties of flood elevation points complete eFARA and floodplain ordinance support now operational