14 Jan 2004Market Operations Standing Committee1 Special Protection Systems: Operational and Compensation Issues.

Slides:



Advertisements
Similar presentations
Incorporating New Transmission Projects in the New York ICAP Market New York ICAP Working Group September 24, 2001 Frank A. Felder on behalf of TransÉnergie.
Advertisements

FPLs Request for Recovery of the Costs Associated with the Seabrook Transmission Substations Pool Transmission Facilities NEPOOL Participants Committee.
Intra Hour Tagging/Oasis During System Contingencies The transmission tagging process was initially developed to solve an after the fact accounting issue.
Market Operations Standing Committee Change Management – Market Rule Amendment Update John MacKenzie, Supervisor Market Rules 19 Oct 2005.
Jerry Rust Chair - Underfrequency Load Shedding Criterion Team
ISDA ® The New CDS Landscape Auction Settlement International Swaps and Derivatives Association, Inc. ISDA ® Copyright © 2009 International Swaps and Derivatives.
Goshen Area Bus Reconfiguration
DOD Microgrids The Missing Link: Microgrid Applications Michael Dempsey P.E. Burns & McDonnell June 12, 2013 © 2013 Burns & McDonnell. All Rights Reserved.
IMO Perspective on Reliability A presentation to the IEEE Toronto Section Forum on Reliable Power Grids in Canada by Dan Rochester, Section Head - Assessments.
Brussels, 29 October 2007 Bart Janse DG Research IPR in FP7.
System Operator Conference NERC Standards Review for: Simulator Drill Orientation 2014 System Operator Conferences Charlotte NC & Franklin TN SERC/SOS.
G 200 L 200 ISO NEW ENGLAND T H E P E O P L E B E H I N D N E W E N G L A N D ’ S P O W E R. COLD SNAP Overview of Proposed Options for Winter 2004/2005.
Ontario Overview Dave Short Senior Regulatory Analyst, Regulatory Affairs IESO’s ERO Workshop – June 28, 2006.
3 Dec 2003Market Operations Standing Committee1 Market Rule and Change Management Consultation Process John MacKenzie / Darren Finkbeiner / Ella Kokotsis,
Special Protection Systems - Market Rule Amendment Submission Presentation to: Market Operations Standing Committee Barbara Reuber, Regulatory Affairs.
College of Engineering and Architecture Using Information to Increase Power Reliability and Reduce Vulnerability Anjan Bose Washington State University.
2006 Reliability Study Scope Name Date. DRAFT 2 Purpose of Study Assess the PEC and Duke transmission systems’ reliability Develop a single reliability.
American Electric Power Service Corporation Jan 26, Coordinating Controls across CREZ  What dials are available to the operators?  What are the.
1 Adjusting the “Dispatch Instructions” to the Defined Metering Point (DMP). “Functional Deferral 6 (FD-06)” Market Operations Standing Committee (MOSC)
CMSC Rules Changes under Consideration Market Operations Standing Committee December 3, 2003 PUBLIC.
1 TRANSMISSION SYSTEM OVERVIEW NETWORK OPERATING COMMITTEE April 17, 2007 New Mexico Transmission System Overview.
Public Market Surveillance Panel Consultation on CMSC Issues Related to Constrained off Payments to Generators and Imports Market Operations Standing Committee.
Proposed CMSC Amendments - Imports & Exports Intertie Trading Sub-committee November 24, 2003 PUBLIC.
Ontario Electricity Supply Forum PEO Mississauga Chapter - September 6, 2007 Rhonda Wright-Hilbig, P.Eng Market Analysis - IESO.
SPS policy – Information Presentation Presentation to ROS June 16, 2004.
Discussion of Market Participant Choice for Transmission Connections Stakeholder Session October 14, 2011.
CRR Auction Scope John Moseley. To outline aspects of the CRR market process to assure that these proposed CRR market protocols (as interpreted by ERCOT.
NERC Reliability Standards - Development Process: Involvement & Needs Presentation to MOSC January 14, 2004 Khaqan Khan Independent Electricity Market.
© Property of ERCOT /06/20041 Overview of SPS in ERCOT February 5, 2004.
Regulatory Planning for Supply to GTA & Toronto Areas Presentation to Regulatory Affairs Standing Committee May 14, 2003.
Addressing Constrained-Off Payments for Intertie Transactions Darren Matsugu, Supervisor - Markets, IESO Presentation to Technical Panel: June 2, 2015.
Transmission Outage Process April Purpose In compliance with the Protocols and the Electric Reliability Council of Texas (ERCOT) Operating Guides,
Sep 22, 2003Market Operations Standing Committee of the IMO1 Change Management: Market Rules Update John MacKenzie, IMO.
Jun 18, 2003Market Operations Standing Committee of the IMO1 Market Pricing Integrated Proposal: Consequences, Trade-Offs & Implementation.
Outage Planning Subcommittee Mark Wilson. Outage Planning Subcommittee Created to address Market Participant concerns with existing rules and procedures.
Operating Guide and Planning Guide Revision Requests Blake Williams, ROS Chair September 13, 2012.
TRANSMISSION CONSTRAINTS KENNETH A. DONOHOO, P.E. Manager of System Planning, Technical Operations
Revisions to the Information Confidentiality Catalogue Presentation to the Market Operations Standing Committee April 23, 2003.
ESI Alternate Economic Study Process E-RSC Meeting October 21, 2010.
2004/06/0 2 Market Operations Standing Committee of the IMO1 Small Facilities - Technical Requirements Rhonda Wright.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee October 1, 2009.
September 1, 2011 TAC Lower Rio Grande Valley Regional Planning Group Project Jeff Billo Manager, Mid-Term Planning.
NPRR 649 Addressing Issues Surrounding High Dispatch Limit (HDL) Overrides Katie Coleman for Air Liquide (Industrial Consumer) ERCOT Board February 9,
ERCOT Transmission Planning Process Overview and Recommendations November 6, 2002.
Market Operations Standing Committee MOSC October 19, 2005 Pat Doran.
Transition Plan Network Operations Model Change Requests 5/26/2010.
Current Nodal OS Design 1.The NMMS database will have an OWNER and an OPERATOR designation for each piece of equipment in the model. The OWNER and OPERATOR.
2006 Reliability Study James Manning Bryan Guy May 12, 2006.
15 Jul 2003Market Operations Standing Committee of the IMO1 Treatment of Combined Cycle Generation and Related Aggregation Issues (MR-00121) John MacKenzie.
Proposed Revisions to Connection Assessment and Approval Process Market Manual 2.10 Bob Gibbons Manager - Long Term Forecasts and Assessments.
Voltage Control Brad Calhoun Consultant, Sr. Trainer Spring 2016.
Jul 23, 2003Market Operations Standing Committee of the IMO1 Market Pricing Issues Update John MacKenzie.
Power Quality By Using FACTS. CONTENTS INTRODUCTION WHAT IS FACTS? FOR WHAT PURPOSE FACTS ARE USED? BASIC TYPES OF FACTS CONTROLLERS BENEFITS OF UTILISING.
©2003 PJM 1 Presentation to: Maryland Public Service Commission May 16, 2003.
3 Dec 2003Market Operations Standing Committee1 Change Management: Market Rules Update John MacKenzie.
Remedial Action Scheme Workshop RAS Workshop May 9, 2016.
1 NPCC – A-2 Dr. Mayer Sasson Transmission Planning Consolidated Edison of New York June 1, 2006 Presented to the NYSRC-RRS.
Nodal Planning Go Live Austin, TX February 3, 2011
Project WECC-0100 Standards Briefing WECC-0100 SDT April 7, 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
UFLS Survey Explanation
GC0104 – Demand Connection Code (DCC)
Calvert City Power I, L.L.C. (“Calvert”) Purpose of Meeting
Phase Angle Limitations
ERCOT – Southern Cross Transmission ROS/WMS Working Group Assignments
Pseudo-tie business procedure
Project WECC-0100 Update Load Modeling Task Force
Special Protection Systems: Operational and Compensation Issues
Project WECC-0100 Update Load Modeling Task Force
Supplemental Project Planning Process Under Order 890 Within PJM
Pseudo-tie business procedure
Presentation transcript:

14 Jan 2004Market Operations Standing Committee1 Special Protection Systems: Operational and Compensation Issues

14 Jan 2004Market Operations Standing Committee2 Purpose of Presentation and Discussion Background information on Special Protection Systems Operational and compensation issues and considerations regarding Special Protection Systems raised in MR-00247: Amendments to Ensure Proper Operation and Compensation for Special Protection Systems Seeking MOSC input on resolution of issues; feedback will be given to Technical Panel for consideration in development of MR rule amendments

14 Jan 2004Market Operations Standing Committee3 What are Special Protection Systems (SPSs)? Special Protection Systems have been installed historically on the IMO-controlled grid to automatically initiate one or more of the following control actions  Generation rejection  Generation runback  Load rejection  Shunt capacitor switching  Shunt reactor switching  Cross-tripping

14 Jan 2004Market Operations Standing Committee4 Purpose of SPSs Used to increase the pre-contingency power transfer capability of the IMO-controlled grid by improving post- contingency IMO-controlled grid performance The arming of an SPS achieves this by deliberately and automatically initiating action so as to respect post-contingency security requirements upon the occurrence of recognized contingencies or upon detection of changes to IMO-controlled grid parameters. Historically installed as lower cost alternative to transmission connection/network upgrade

14 Jan 2004Market Operations Standing Committee5 SPS Terminology SPS Arming: the SPS has been “turned on” and facilities connected to the SPS could be subject to the automated action associated with the SPS SPS Activation: applicable contingency or applicable change in grid conditions has occurred, and automated action has been activated (e.g. generator or load tripped off)

14 Jan 2004Market Operations Standing Committee6 SPS Statistics (still being compiled) Number of SPSs in Ontario –Generation Rejection: 12 –Load Rejection: 16 –Generation Runback: 3 –Shunt capacitor switching: 1 –Shunt reactor switching: 10 –Cross-tripping: 4 Frequency of arming Frequency of activation

14 Jan 2004Market Operations Standing Committee7 MR Submitted by OPG; determined by Technical Panel to warrant consideration using the following criteria: –the amendment could potentially reduce market participant’s costs by allowing a market participant with facilities connected to an SPS to better anticipate and manage the risks associated with the use of SPSs

14 Jan 2004Market Operations Standing Committee8 Additional Considerations Operational Should means of notification be mutually agreeable to SPS owner (typically transmitter) and MP/owner of facility connected to SPS, as these are the entities that would incur cost(s) of implementing means of notification?

14 Jan 2004Market Operations Standing Committee9 Additional Considerations Compensation MP/owner of facility connected to SPS derives benefit from SPS arming: allowed to operate in manner of their choosing rather than being constrained by IMO Analogous situation of forced outage of transmission connection does not result in compensation Compensation costs would be recovered through uplift