Operating Margins UNC Sub Group Tuesday 2nd December 2008.

Slides:



Advertisements
Similar presentations
UK Gas Entry Regime – Review of existing Interruptible Arrangements & Potential Reforms for this Winter.
Advertisements

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Hybrid Option(s) Ritchard Hewitt – August Fundamentals  Parameters – Cost Reflective, Incentive, Value  Cost – What does it cost the service provider.
Funding UKLink Process changes (User Pays). 2 Purpose of Presentation  Review of User Pays  Principles  Application to date  National Grid NTS observations.
NTS Exit (Flat) Capacity Charges – Credit Arrangements (UNC TPD V3.3.4) Simon Trivella – 14 th January 2009 Distribution Workstream.
Operating Margins UNC Sub Group Tuesday 4 th November 2008.
Commercial Arrangements For Gas Quality Service – Process UNC Transmission Workstream 23 rd April 2007.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Exit Reform Review Transmission Workstream 07 January 2010.
UNC Modification Proposal 0116 Reform of the NTS Offtake Arrangements Transmission Workstream 5 th October 2006.
Operating Margins. 2 Competitive Provision of Operating Margins Change to National Grid Gas’s Transporter Licence which:  Introduced Special Condition.
Capacity trade and transfer mechanism and the next AMSEC auction Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 9 May 2007.
Energy Balancing Credit Proposals Transmission Work Stream 6th November 2008 Mark Cockayne.
SO Incentives from April 2010 John Perkins. 2 Gas System Operator (SO) Incentives National Grid operates the high pressure Gas Transmission System in.
“Introduction of a New Shipper Obligation in Relation to the Procurement of Gas Below the Gas Safety Monitors” Transmission Workstream 4 th Jan 2007 Chris.
Further consultation on NTS entry baselines Nienke Hendriks Head of Gas Transmission Policy, Compliance and Enforcement 14 August 2007.
Review of the UNC Post-emergency Arrangements Workshop 1 March 2009.
Code Governance Review UNC Modification Proposals Chris Shanley - National Grid NTS.
Review Group 291 – Balancing Arrangements Default Cashout Workshop 3 – 21 st June 2010.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Mod 214 – Reservation of firm NTS Exit Capacity at new NTS Exit Points in the transitional period Steve Rose.
Ofgem’s Gas SCR – Background on the DSR mechanism Stephen Jarvis 02/07/14.
Flow Margin Assumptions for NTS Planning and Development Transmission Planning Code Workshop 3 5 th June 2008.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Revision of the UNC Post-Emergency Arrangements draft proposal July 2009.
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
Modification Proposal 0246: Quarterly NTS Entry Capacity User Commitment Chris Shanley.
UNC (Urgent) Modification Proposal 0044: “Revised Emergency Cash-out & Curtailment Arrangements” UNC Transmission Workstream 11 th August 2005.
Review Group Modification Proposal Introduction of Enduring NTS Exit Capacity Arrangements.
Gas Emergency Arrangements Proposal Transmission Workstream 5 th April 2007.
Proposer: Hayley Burden Panel Date: 17th April : Mod Title: Imbalance Charge amendments required to align the UNC with the Network Code on Gas.
LTSEC summer auction Transmission Workstream 6 th April 2006 Dave Adlam, National Grid NTS.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
1 Operating Margins – Request for Proposals Transmission Workstream 6 th April 2006 Dave Smith, National Grid NTS.
Force Majeure - Capacity Transmission Workstream 2 July 2009.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Modification proposal 0073 ‘Revision to the Notice Period regarding the implementation of changes to Transportation charges’ Transmission Workstream, 2.
Mod 166 Review Group Incremental Exit Capacity at New and Existing Exit Points.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Review of Entry Capacity and the Appropriate Allocation of Financial Risk Review Group th Sept 2008.
Optimisation of Entry Capacity Strawman Transmission Workstream 4 th May 2006.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Emergency Cashout Prices and Emergency Curtailment Quantity (ECQ) Adjustment Ritchard Hewitt Gas Code Development Manager.
Fundamental review of entry charging principles UNC Transmission Workstream - 6 th August 2009.
Code Governance Review UNC Modification Proposals Beverley Viney - National Grid NTS.
Facilitating Release of Non-obligated Entry Capacity Draft – for discussion purposes only 22 November 2007.
UNC Modification 0050 – Storage Monitor Adjustment.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th Feb 2009.
Transitional Exit Capacity Proposals -Update Offtake Agreement Workstream, 30 Nov 05 Dave Adlam.
Modification Proposal 0435: Arrangements to better secure firm gas supplies for GB customers Initial Workgroup discussion 1 November 2012.
Development Modification Proposal: Introduction of an Inter-day Linepack Product Review Group August 2010 Transmission Workstream 07/10/2010.
Review of the UNC Post-emergency Claims Arrangements Strawman February 2009.
Transmission Workstream 6 January 2011
Entry Capacity Overrun price calculation
Review of UNC Section Q “Emergencies”
Introduction of Code Contingency Guidelines Document
SO Incentives from April 2010
CAP190: Workgroup Report CUSC Modifications Panel, 26th August 2011
Enhanced information provision and revision of the Gas Balancing Alert for Winter 2009 July 2009.
Joint Office Presentation for Modification 0678
MOD National Grid NTS Initiated Flow Swaps
UNC Section H Clarification
Credit Modification Proposals Update
Introduction of Code Contingency Guidelines Document
Entry Overrun Calculation
Transmission Workstream – 6th July 2005
Ofgem presentation to Gas Transmission Workstream
Presentation transcript:

Operating Margins UNC Sub Group Tuesday 2nd December 2008

2 Principles of Section K Re-write Already Agreed Summary of Changes 1.Introduce flexibility to meet new Licence obligations (a) To facilitate procurement from non-storage providers, certain references to ‘Storage Year’ will need to be amended to ‘Operating Margins Requirement Period’  Note: Legal text has been amended to “Operating Margins Year’ (b) Operating Margins Facilities will need to include Supply Side Facilities and Demand Side Facilities (c) Operating Margins Gas Delivery Arrangements will need to be extended so that OM Services can be provided by NTS-connected supply and demand sources

3 Principles of Section K Re-write Already Agreed Summary of Changes continued. (d) Clarify role of ‘Relevant System Managers’ (e)Procurement Flexibility: National Grid Gas requires flexibility in the way it manages its OM holdings, whether that be by switching between different capacity arrangements, different delivery arrangements or between capacity and delivery arrangements. Following a switch from capacity arrangements, National Grid Gas may wish to terminate those capacity arrangements (hence relinquishing capacity) or sell on the capacity to a third party. 2. Add clarity to existing arrangements – make K easier to read

4 Further Potential Section K Changes Identified to be considered today 1. Sale of gas associated with Operating Margins Capacity Arrangements  Where National Grid NTS has entered into an Operating Margins Capacity Arrangement they can be terminated (as already in code), or Operating Margins Capacity sold or transferred (as proposed and agreed in an earlier workshop). 2. Buy gas associated with Operating Margins Capacity Arrangements  Where National Grid has switched to an Operating Margins Capacity Arrangement. Changes Proposed: Provides National Grid NTS with clearer guidelines regarding the disposal of any excess gas and purchase of gas to be held in storage. Changes reflected in Section 3.

5 Further Potential Section K Changes Identified to be considered today 3. Closing Margins Adjustment Charge (CMAC) Applies only to gas sold that had previously been held in storage under Operating Margins Capacity Arrangements Closing Margins Adjustment Charge is the sum of weighted average cost of gas in storage (which includes the original cost of gas & putting it into store) and any cost of sale minus the revenues received on the sale of the gas Recovered /paid by Users in proportion to their UDQIs and UDQOs Changes Proposed: It is proposed that the cost & revenues associated with pre-Storage Year transfers & or sale are also included in the CMAC Changes reflected in Sections 3 & 4 of Section K

6 Further Potential Section K Changes Identified to be considered today 4. Utilisation of Operating Margins  The utilisation of Operating Margins is currently restricted to the “Gas Day” on which damage to or failure of any part of the NTS (other than Programmed Maintenance) occurs. Note: This change is not required to facilitate Operating Margins Contestability and would not alter the level of bookings required for Operating Margins. Changes Proposed: Operating Margins can be used in these circumstances for up to 24 hours following the event. Change reflected within Section 2.

7 Further Potential Section K Changes Identified to be considered today Example: Current: 06:00 Gas Flow Day 1 05:00 Pipeline Incident 06:00 Gas Flow Day 2 06:00 Gas Flow Day 3 OM Utilisation 06:00 Gas Flow Day 1 05:00 Pipeline Incident 06:00 Gas Flow Day 2 06:00 Gas Flow Day 3 OM Utilisation up to 24 hours 05:00 Proposed:

8 Summary of Potential Additional Changes 1. Sale of gas associated with Operating Margins Capacity Arrangements 2. Buy gas associated with Operating Margins Capacity Arrangements 3. Costs & revenues associated with pre-Storage Year transfers and or sale of gas are included in the Closing Margins Adjustment Charge 4. Utilisation of Operating Margins for damage to or failure of any part of the NTS can be used for up to 24 hours following the event Does the group believe it to be beneficial to take these changes forward as part of this Review?

Proposed Consent to Modify

10 Consent to Modify – Revision to TPD Section K4.2 – Margins WACOG – paragraph  Incorrect cross references identified: Error introduced by MP 311 and compounded by 710 UNC: K Consent to Modify UNC K4.2.4 costs are (a) Carry over margins gas (b) Accrued OM gas purchased at entry or acquired as trade (c) Accrued from Storage Gas Transfer (d) OM transportation charges (e) OM balancing charges (f) Injection charges (g) User agent fees (h) Withdrawal charges associated with Carry Across Gas

11 Prevailing 2008 Summary of Code Text – post MP0311  (d) the amount payable by National Grid NTS (Margins) by way of Transportation Charges  (f) The amount paid or payable by National Grid NTS (Margins) by way of injection charges  (b) the amounts which have accrued due from National Grid NTS (Margins) pursuant to the Margins Gas Procurement Arrangements.  (c) the amounts which have accrued due from National Grid NTS (Margins) in respect of any Storage Gas Transfers e) the amounts payable by Transco (Margins) by way of Transportation Charges. (g) the amounts paid or payable by Transco (Margins) by way of injection charges.  (c) the amounts which have accrued due from Transco (Margins) pursuant to the Margins Gas Procurement Arrangements.  (d) the amounts which have accrued due from Transco (Margins) in respect of any Storage Gas Transfers Code Comparison cross referenced the following provisions: 1996 Summary of Code Text – pre MP0311

12 Proposed Consent to Modify Section K4.2.4 a Consent to Modify Section K4.2.4 a “ (a) the quantity of relevant Carry-over Margins Gas multiplied by the Operating Margins WACOG and the amount of relevant Carry- Across Gas (in respect of which the relevant Storage Facility is the deficit facility) multiplied by the Operating Margins WACOG in respect of the surplus Storage Facility, in each case as at the last Day of such Storage Year.”

13 Proposed Second Consent to Modify Summary of proposed Section K CTM changes: refers to paragraph 4 should be (a) refers to paragraph should be (f)(i) & (f)(ii) refers to paragraph should be (a) delete “(i)” and “; and (ii)”

Walk Through the Draft Legal Text

15 Section K Draft Legal Text Legal Text Key:  In general, when reading the legal text use the following key: InsertionMoved to Deletion Style Change Moved deletionFormat change Moved from  Current Section K used to develop the draft legal text for contestability. To allow direct comparison.  Consent to modify changes have not been included at this stage, this is again to facilitate a direct comparison between current and proposed texts.

16 Next Steps  CTM1 – Sent to Ofgem  CTM2 – Under development/will sent to Ofgem shortly  Next Version of draft legal text to include CTM related changes  04 December: Report to Transmission Workstream  12 December: OM sub group meeting  18 December: UNC Modification Panel