Storm Water Permitting. Oil And Gas Operator Concerns  Impacts of Storm Water Permitting on Operators who do business primarily – On Privately Owned.

Slides:



Advertisements
Similar presentations
Project Certification & Encroachments The SR 305 Experience Project Certification & Encroachments The SR 305 Experience.
Advertisements

Why is Big Cypress a National Preserve and Not a National Park?
Presents DIRECT INVESTMENT IN OIL AND GAS RESERVES.
APARTMENT OWNERS NETWORK NOVEMBER o Outline the new District Court Procedure o o Service of Proceedings – Problems o Statute of Limitations – 6.
The Economics of Development by the Alliance for Building a Better Ottawa 1 By Cal Kirkpatrick | President | Colonnade Development Jack Stirling | Vice.
Mineral Management NARO-Arkansas Convention March 8, 2008 Conway, Arkansas.
Flexible Solicitation Formats in Public Competitive Procurement.
Celia Flowers and Eric Schmalbach March 20, 2014 FLOWERS DAVIS, P.L.L.C. NOW THAT THERE IS NO STANDARD LEASE FORM – WHAT PROVISONS CAN WE EXPECT TO SEE.
INDIAN LAND WORKING GROUP 17TH ANNUAL INDIAN LAND CONSOLIDATION SYMPOSIUM October 30- November 1, 2007 Oneida Reservation, Wisconsin Radisson.
1 Public Lands Advocacy HOW TO REVIEW A FEDERAL PLANNING DOCUMENT.
©2011 Cengage Learning. California Real Estate Principles Chapter 2 Part II: Estates and Methods of Holding Title ©2011 Cengage Learning.
© 2013 Barnes & Thornburg LLP. All Rights Reserved. This page, and all information on it, is the property of Barnes & Thornburg LLP which may not be reproduced,
FORM 1000 – APPLICATION TO DRILL, RECOMPLETE OR REENTER.
Patty Bartlett Logan County Treasurer / Public Trustee.
Who Owns Vermont’s Rocks: A case for collecting economic rent to offset the depletion of nonrenewable mineral deposits Current Management Structure Act.
©OnCourse Learning. All Rights Reserved.. Rights and Interests in Land ©OnCourse Learning. All Rights Reserved. Chapter 3.
Texas Real Estate Contracts 4 th Edition © 2015 OnCourse Learning.
Mining Lease Application Assessment: Processes within the Minerals and Energy Division PIRSA.
Mineral Sales. Overview Current state of Oil and Gas Industry Primary areas of operation inside the U.S. Common terms used in the industry Gaining experience.
Set up domestic sites. Remove the ban applied for offshore drilling sites. Production increment from Bakkan Shale and ANWR. Explore alternative fuel resources.
Bringing it all Together: Oil & Gas Operations after Acquisition and Diligence Gina M. Banai.
Small Farm Profitability: Is Wind Energy the Answer? 1
Mitigating the Social Impact of Oil Operations 18th World Energy Conference Eleodoro Mayorga Alba World Bank October 22, 2001.
© 2012 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license.
Part 1.3 Mineral Rights & Leasing. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Understand.
1 Competitive long-term financing of Norwegian exports Norwegian Finance Breakfast – Dallas Federal Reserve, April 18, 2012.
Demystifying the Process: Influencing Social and Economic Decision Making In Oil and Gas Development Pandora Snethkamp, Ph.D Houston, TX 77006
VIRGINIA PUBLIC-PRIVATE EDUCATION FACILITIES AND INFRASTRUCURE ACT OF 2002 (PPEA) Augusta County Board of Supervisors Wednesday, January 6, 2009.
Presented to: By: Date: Federal Aviation Administration Environmental Requirements For Extraction of Gas & Oil on Airport Property 35 th Annual Airports.
E&P STORM WATER OVERVIEW Domestic Onshore Energy E&P STORM WATER OVERVIEW Domestic Onshore Energy May 10, 2005.
68 4. Taxation and Contracts In this module, we will discuss: 1031 exchanges IRS 1033—threat of condemnation Estate planning Contracts in land sales.
November, 2000 Slide 1 Project Services Division RISK MANAGEMENT Project Services Division Presentation By: Adam Malkhassian November, 2000.
PETROLEUM LAND ADMINISTRATION OVERVIEW PRESENTATION BY CAPLA Regulatory Committee.
Business Plan Presentation. Mission “To deliver a revolutionary new energy system by producing a unique pump that makes the most efficient use possible.
Technical Manager; Bechtel Oil, Gas & Chemicals.
How Credits Become Capital: When and How to Syndication Incentives for Historic Preservation in Seattle Conference Thursday, July 12 Seattle, WA.
Sale of Land for Overdue Rates and Charges A presentation to the 2012 Local Authorities Revenue Management Association Conference By Tim Fynes-Clinton.
SURFACE AND MINERAL CONFLICTS: THE LANDOWNER AND DEVELOPER PERSPECTIVE Randall J. Feuerstein, Esq. DUFFORD & BROWN, P.C Broadway, Suite 2100 Denver,
 The Probate Process.  Probate – the legal process through which a decedent’s assets, that are not automatically transferred at death to their “rightful”
© Oklahoma State Department of Education. All rights reserved.1 Housing Alternatives Standard Renting vs. Buying.
Renewable Energy at Closed Landfills Workshop: Landfill Post Closure Use Permitting Guidelines January 19, 2010 Daniel Hall, Solid Waste Section Chief.
© 2003 Haynes and Boone, LLP An Introduction to Going Private Transactions by Jennifer Wisinski June 18, 2003.
Background Claremont residents and officials have voiced concerns over the water rate increases imposed by the Golden State Water Company (GSWC). On average,
Legal Framework for Upstream Activities in Ukraine Dr. Irina Paliashvili Unconventional Oil & Gas Conference Kyiv 30 October 2013.
Strategic Alliances How to Structure, Negotiate, and Implement Successful Alliances February 11, 2003 Debra J. Dorfman Copyright © 2003 by Hale and Dorr.
Energy Exploration & Development On National Forest System Lands Barry Burkhardt
NATURAL GAS LEASES Understanding Your Rights Protecting Your Interests Agricultural Law Resource and Reference Center Ross H. Pifer, J.D., LL.M., Director.
Federal Acquisition Service U.S. General Services Administration Best Practices in Leasing Schedule 36 Gary Haag, Ryan Mathews, Shannon Stanford Integrated.
 The Free Enterprise System.  Traits of Private Enterprise.
Power Purchase Agreement from a Utility Perspective Marilynn Semro Seattle City Light May 11, 2005 Are Geothermal Projects Different than Other Resources?
Surface Rights in Nunavut
Lease Renewal for Tenants: a Snapshot Lease Renewal Procedure under the Landlord and Tenant Act 1954 (the “Act”) Nadia Milligan, Counsel Development Hilton.
Scattered-Site Rental Housing: Challenges and Solutions Christine Moran Director of Multifamily Finance September 28, 2015.
Source: Energy Information Administration
Policymaking for Health Care and the Environment Chapter 19.
Like Kind Exchange History
PART 600 § – 612 Development Requirements PART 600 § – 612 Development Requirements 1 Capital Fund Rule – § (Subpart F)
Chapter 3 Facility Design and Construction. Chapter Objectives 1.Describe the process of facility design and construction 2.Demonstrate proficiency in.
Topic 3: Finance and Accounts
HOW TO PREPARE A BUSINESS FOR SALE M&A Counsel Substantial and recent experience representing both buyers and sellers Bench strength at the firm good,
The Business Sales Process. 2 Our Business Sale Process - Overview Review Company’s operations and business plan Prepare and refine list of purchasers.
Bearcreek coal field, Montana, USA. This undervalued asset comprises over 389MM tons of high btu coal US COAL RESERVES AVAILABLE FOR JOINT VENTURE.
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
Small Business Management, 18e
Financing Land Development Projects
Springbrook Estates Sewer Improvement Area Informational Meeting
Federal Unit Agreements
Leasehold Transactions
How Small Developers and EPC Contractors Can Add PPA Financing to their Arsenals John Langhus, VP Business Development Midwest Solar Expo 2019 New Energy.
Treatment of Geophysical Data as a result of M&A,
Presentation transcript:

Storm Water Permitting

Oil And Gas Operator Concerns  Impacts of Storm Water Permitting on Operators who do business primarily – On Privately Owned Lands Lost Leases Lost Access to Rigs Compliance Issues Lost Production and Reserves

Oil And Gas Operator Concerns:  Leasing – The following illustrates leasing complexities along with a current and live example of a typical exploration project:

Complex Leasing Issues – Split Estate Mrs. Barksdale has  20 Grandchildren  30 Great-grandchildren  55 G-G-grandchildren  19 G-G-G- grandchildren Numerous individually negotiated leases on tracts of land with numerous undivided interest owners Numerous individually negotiated leases on tracts of land with numerous undivided interest owners

Small Operator Leasing for an Exploration Prospect 3 Year Prospect (320 Acres)  Leased  Partial Leased  Held by Production

Tract 1 Lease Program Leases expire by Unless prior commencement of drilling

Tract 1 Continued Researching title & locating heirs. Leasing for Tract 1 has taken years. (Bottom 8 owners are heirs of the estate of James S. who were located from cousin Irene living in Chicago. Heirs live in N & S Carolina. Now attempting to lease.)

Tract 2 Lease Program  No Will (Intestate)  Heirs Determined by Probate Court (3-5 Mos) James T. died intestate (James T. had no will). Attempting to find all known heirs. Will then offer leases. May need to go through court for receivership (3-5 Mos) (If permitting delays cause receivership leases to expire, additional court proceedings required)

Tracts 3-a & 3-b Lease Program Leases on Tracts 3a&b held by production from outside operator. To obtain this kind of lease, a farmout is required. Typical farmouts have 6 month (or less) drilling requirements. Company approval process may take 2-5 months or longer. Storm Water Permitting delays may cause loss of farmout.

All Tracts  Drill site, if known, is kept confidential until leasing is finalized due to – Outside competition for leases – Compromising mineral owner negotiations  Estimated completion of leasing close to expiration date.  NO TIME FOR PERMITTING DELAYS. – Drilling and permitting must commence after leasing/farmouts acquired and prior to their expiration.

Oil And Gas Operator Concerns:  Risk Of Losing Leases – Exploration projects have numerous individually negotiated leases with short timelines that may easily be derailed by delays – If leases are lost, then reserves and production are lost due to abandoned exploration project Costs Lost Forever - geological, seismic, exploration, engineering, project financing, lease acquisition, title work, legal work, permitting, and environmental workCosts Lost Forever - geological, seismic, exploration, engineering, project financing, lease acquisition, title work, legal work, permitting, and environmental work

Oil And Gas Operator Concerns: (con’t)  Risk Of Losing Rig – Rig will commit to other jobs if Operator cannot keep on schedule – once the rig is lost, the risk of losing leases and abandoning the exploration project is compounded – 4 to 6 months to acquire or re-acquire a rig – Rig mobilization costs $70,000 to $100,000 (depending upon rig size) – Drilling is required after final lease acquisition and prior to lease terminations – Lease clauses require continuous drilling to hold additional acreage (60 – 90 day)

Oil And Gas Operator Concerns: (con’t)  PROPOSED STORM WATER PERMITTING COMPLIANCE ISSUES – COMPLIANCE ISSUES FOR ALL OPERATORS Timing - On the ground compliance cannot begin until lease acquisition is finalized due to confidentiality concernsTiming - On the ground compliance cannot begin until lease acquisition is finalized due to confidentiality concerns Substantial delays associated with proposed permitting processSubstantial delays associated with proposed permitting process Leases on privately owned land do not allow for permitting delayLeases on privately owned land do not allow for permitting delay Need for user friendly guidelines such as RAPPSNeed for user friendly guidelines such as RAPPS – COMPLIANCE ISSUES FOR ALL OPERATORS, BUT ESPECIALLY SMALLER OPERATORS Storm Water Permitting CostsStorm Water Permitting Costs 3 rd party consultants3 rd party consultants – COMPLIANCE ISSUES MAINLY FOR SMALLER OPERATORS Due to financial constraints, unable to compete on Federal landDue to financial constraints, unable to compete on Federal land Unlike Federal leases, leases on privately held land do not allow for permitting delayUnlike Federal leases, leases on privately held land do not allow for permitting delay

Conclusion  Proposed Storm Water permitting requirements will cause delays, lost opportunities, and lost production Delays cause lost leases and rigsDelays cause lost leases and rigs Lost leases and rigs cause abandoned exploration projectsLost leases and rigs cause abandoned exploration projects Abandoned exploration projects cause lost reserves and production for the USAbandoned exploration projects cause lost reserves and production for the US  Lost US reserves and production will result in: – Lost Jobs – More Imports – Larger US Trade Imbalance – More Energy Dependency on Foreign Countries – Higher Consumer Prices – Less Federal, State, and Local Tax Revenue – Less Clean Burning Natural Gas (87% of US drilling for nat. gas)  Implementation of the RAPPS document is a better alternative as compared to the proposed storm water permitting requirements – RAPPS is user friendly & addresses storm water runoff concerns – RAPPS avoids delays and cost impact issues