GLAST LAT Project LAT Instrument Analysis Workshop – Feb 27, 2006 Hiro Tajima, TKR Data Processing Overview 1 GLAST Large Area Telescope: TKR Data Processing.

Slides:



Advertisements
Similar presentations
GLAST LAT Project I&T Meeting – Jan 20,2004 E. do Couto e Silva 1 GLAST Large Area Telescope: EM1 Data Analysis and Calibration Summary Report Eduardo.
Advertisements

GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.31 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
GLAST LAT Project Apr 1, 2005 E. do Couto e Silva 1/31 Overview of End to End Runs Eduardo do Couto e Silva April 1, 2005 ( not it is not a joke, we finally.
GLAST LAT Project Instrument Analysis Workshop 6 – 06/02/27 F. Piron & E. Nuss (LPTA) 1 Trending CAL performance and mapping crystals Gamma-ray Large Area.
GLAST LAT Project LAT System Engineering 1 Test Definition Planning Pat Hascall SLAC System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 6.1 Ground Operations Software 1 Gamma-ray Large Area Space Telescope.
GLAST LAT Project Instrument Analysis Meeting– May 27, 2005 Hiro Tajima, TKR Bad Strips 1 GLAST Large Area Telescope: TKR Bad strips analysis update Hiro.
GLAST LAT Project TKR Tower 4 and 5 hand-off review – June 8,2005 Hiro Tajima, TKR Tower 4 and 5 hand-ff review 1 GLAST Large Area Telescope: TKR Hand-off.
GLAST LAT Project 1 Tracker “mini-tower” Full Size Calorimeter module Face to Face IDT meeting March 20, 2002 Convener: E. do Couto e Silva Engineering.
TkrRecon Status Perugia Software Workshop May, 2003.
GLAST LAT ProjectOnline Peer Review – July 21, Integration and Test J. Panetta 1 Gamma-ray Large Area Space Telescope GLAST Large Area Telescope:
GLAST LAT Project Instrument Analysis Workshop 5 – 05/08/29 F. Piron & E. Nuss (IN2P3/LPTA – Montpellier) 1 Comprehensive review of CAL calibrations Gamma-ray.
A.Chekhtman1 GLAST LAT ProjectInstrument Analysis meeting, July 28, 2006 Calibration of high energy diode. Alexandre Chekhtman NRL/GMU Gamma-ray Large.
A.Chekhtman1 GLAST LAT ProjectInstrument Analysis meeting, June, 24, 2005 CAL retriggering study with SLAC data. Alexandre Chekhtman NRL/GMU Gamma-ray.
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: On-Orbit Calibration and.
GLAST LAT Project LAT Instrument Analysis Meeting – May 26, 2006 Hiro Tajima, TKR Efficiency Trending 1 GLAST Large Area Telescope: TKR Efficiency Trending.
GLAST LAT Project July 19, 2005 E. do Couto e Silva 1/17 Science Verification Analysis and Calibration GLAST Large Area Telescope Eduardo do Couto e Silva.
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 6 of 12 LAT Test Results 1 GLAST Large Area Telescope Pre-Environmental Test.
GLAST LAT Readout Electronics Marcus ZieglerIEEE SCIPP The Silicon Tracker Readout Electronics of the Gamma-ray Large Area Space Telescope Marcus.
GLAST LAT Project Analysis Meeting March 22, 2004 E. do Couto e Silva 1/8 LAT Instrument Test Analysis Eduardo do Couto e Silva March 23, 2004.
IA meeting, Feb. 3, 2006 Mutsumi Sugizaki TKR Noise Stdudy 1 LAT TKR Noise Study Current Status Mutusmi Sugizaki (and short comment about TOT=255 event)
9/23/2005 Inst. Ana. MeetingTKR trigger efficiency with ACD&CAL 1 Study of TKR trigger efficiency with ACD and CAL Mutsumi Sugizaki, Hiro Tajima SLAC.
GLAST LAT Project Instrument Analysis Meeting– Dec 9, 2005 Takuya Kawamoto, TKR Noisy Strip determination 1 Noisy Strip determination Takuya Kawamoto (Hiroshima.
GLAST LAT Project IA Workshop 4 July 15, 2005 E. do Couto e Silva 1/7 Overview of Data Taking Anders W. Borgland Science Verification, Analysis and Calibrations.
GLAST LAT ProjectIA Workshop 6 – Feb27,2006 E. do Couto e Silva 1 Introduction to Instrument Workshop 6 Eduardo do Couto e Silva Feb 27, 2006.
GLAST LAT ProjectTest Planning Meeting Aug 2, 2004 E. do Couto e Silva 1/6 SVAC EM2 Goals Develop distributions for E2E tests that involve comparison of.
GLAST LAT Project SE Test Planning meeting October 4, 2004 E. do Couto e Silva 1/13 SVAC Data Taking during LAT SLAC Oct 4, 2004 Eduardo.
GLAST LAT ProjectDOE/NASA Status Review, March 30 & 31, 2004 Integration and Test 1 Integration, Facilities, Configuration, and Test (IFCT) Flow Procedure.
TriggerLatchingEffLAT_ ppt1 Status report of overall Trigger and Latching Efficiencies study Instrument Analysis meeting, May 13, 2005 Tsunefumi.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
GLAST LAT Project Analysis Meeting April 22, 2004 E. do Couto e Silva 1/5 SVAC Status SVAC Status Eduardo do Couto e Silva April 22, 2004.
ACD calibrations Pedestals Measured from online script Measure PHA w/ HV off, no charge injection Use cyclic triggers ~ ADC counts, very narrow.
GLAST LAT ProjectOnline Peer Review – July 21, Integration and Test L. Miller 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
10/21/2005 Inst Ana Meeting TKR Noise Flares1 TKR Noise Flares observed in TKR #11 and #8 Mutsumi Sugizaki, Hiro Tajima, and TKR team.
GLAST LAT Project Instrument Analysis Workshop #4, 14 July 2005 David Smith CAL calib at SLAC SVAC1 Stability of the CAL Calibrations Online script “suites”
Tracker Subsystem1 GLAST LAT Project Production Readiness Review, 25 August, 2004 GLAST LAT Tracker TOWER-A PRR TKR Tower Electrical Test Plan Luca Latronico.
GLAST LAT Project4 April 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
Optimising Cuts for HLT George Talbot Supervisor: Stewart Martin-Haugh.
LAT HSK Data Handling from B33 Cleanroom. ISOC Software Architecture.
GLAST LAT ProjectMarch 24, F Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS F: On-Orbit Calibration and.
GLAST LAT ProjectFace to Face Managers Meeting 04/14/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Face to Face Managers.
1 Stepping in everyone’s toes ( but for a good cause….) Eduardo do Couto e Silva Software Meeting – January 2001.
Feb. 7, 2007First GLAST symposium1 Measuring the PSF and the energy resolution with the GLAST-LAT Calibration Unit Ph. Bruel on behalf of the beam test.
GLAST LAT Project Technical/Cost/Schedule Review 06/30/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
Pixel DQM Status R.Casagrande, P.Merkel, J.Zablocki (Purdue University) D.Duggan, D.Hidas, K.Rose (Rutgers University) L.Wehrli (ETH Zuerich) A.York (University.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST LAT Project IA Workshop 4 July 14, 2005 E. do Couto e Silva 1/7 Introduction to the Instrument Analysis Workshop 4 Eduardo do Couto e Silva July.
GLAST LAT Project CU Beam Test Workshop 3/20/2006 C. Sgro’, L. Baldini, J. Bregeon1 Glast LAT Calibration Unit Beam Test Status Report on Online Monitor.
GLAST LAT Project LAT Instrument Analysis Meeting – June 30, 2006 Hiro Tajima, TKR Efficiency Trending, NRL 1 GLAST Large Area Telescope: TKR.
GLAST LAT ProjectI&T Test Planning Telecon, 8 Nov 2004 CAL Test and Calibration DefinitionJ. Eric Grove GLAST LAT GLAST LAT Calorimeter Subsystem Gamma-ray.
GLAST LAT Project Instrument Analysis Meeting– Feb 28, 2006 Tsunefumi Mizuno TowerTrend_ ppt 1 Tracker Parameters Trending Monitor GLAST I and.
1 Study of Data from the GLAST Balloon Prototype Based on a Geant4 Simulator Tsunefumi Mizuno February 22, Geant4 Work Shop The GLAST Satellite.
Feb. 3, 2007IFC meeting1 Beam test report Ph. Bruel on behalf of the beam test working group Gamma-ray Large Area Space Telescope.
Calibration algorithm and detector monitoring - TPC Marian Ivanov.
14/02/2008 Michele Bianco 1 G.Chiodini & E.Gorini ATLAS RPC certification with cosmic rays Università del Salento Facoltà di Scienze MM.FF.NN.
GLAST Large Area Telescope Instrument Flight Software Flight Unit Design Review 16 September 2004 Instrument Configuration by File James Swain Stanford.
GLAST LAT Project LAT Instrument Analysis Meeting– Aug 29, 2005 Hiro Tajima, TKR Updates at SLAC 1 GLAST Large Area Telescope: TKR Updates at SLAC Hiro.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review SVAC Elliott.
DB and Information Flow Issues ● Selecting types of run ● L1Calo databases ● Archiving run parameters ● Tools Murrough Landon 28 April 2009.
GLAST LAT Project SE Test Planning Dec 7, 2004 E. do Couto e Silva 1/27 Trigger and SVAC Tests During LAT integration Su Dong, Eduardo do Couto e Silva.
Mini-Tower test results
GLAST LAT tracker signal simulation and trigger timing study
Single-CAL Test and Calibration
LAT Test Results GLAST Large Area Telescope LAT Pre-Shipment Review
GLAST Large Area Telescope
Overview Goal Study GEM variables in SVAC ntuple
Mini Tower Preliminary Results
GLAST Large Area Telescope:
Studies of the Time over Threshold
GLAST Large Area Telescope: I&T Test Readiness Review
Presentation transcript:

GLAST LAT Project LAT Instrument Analysis Workshop – Feb 27, 2006 Hiro Tajima, TKR Data Processing Overview 1 GLAST Large Area Telescope: TKR Data Processing Overview Hiro Tajima (SLAC) TKR Gamma-ray Large Area Space Telescope

GLAST LAT Project LAT Instrument Analysis Workshop – Feb 27, 2006 Hiro Tajima, TKR Data Processing Overview 2 Introduction We cannot trend parameters for each TKR elements (800K strips, 14K GTFEs, 576 layers). –Trend tower (or layer) average of ratio of parameters for individual elements with respect to the references. –Requires offline processing. Parameters for TKR data processing and trending. –Calibrations (see Mizuno’s talk for trending results). GTFE threshold DAC. GTFE calibration DAC (charge scale). TOT gain parameters. Channel thresholds. Bad channels (dead, hot and disconnected). –Performance monitoring. Hot strips. Noise flare. Efficiency. Layer displacement. Tower displacement.

GLAST LAT Project LAT Instrument Analysis Workshop – Feb 27, 2006 Hiro Tajima, TKR Data Processing Overview 3 GTFE Threshold DAC Calibrations Type of Data processing –Online script (TkrThresholdCal.py). Perquisites –GTFE charge scale. Output –LATTE type schema xml file. Manually included as LATTE schema ancillary file. LATTE schema file is converted to LATc to be used in LICOS. Trending –Offline python script to read the online test reports. –Manual handling of valid run number list.

GLAST LAT Project LAT Instrument Analysis Workshop – Feb 27, 2006 Hiro Tajima, TKR Data Processing Overview 4 GTFE Charge Scale Calibrations Type of Data processing –Offline muon data analysis (calibGenTKR/totCalib). Perquisites –Calibrated GTFE threshold DAC for muon data taking. –TOT gain parameters for each channel. Output –Special xml file. Manually included as LATTE schema ancillary file for online scripts. –LATTE does not understand the contents –Only TKR online script parse the contents. –Not sure how LICOS handles this file. Converted to a special ROOT file to be put into offline analysis database. Trending –Offline python script to read output xml file. –Manual handling of valid run number list.

GLAST LAT Project LAT Instrument Analysis Workshop – Feb 27, 2006 Hiro Tajima, TKR Data Processing Overview 5 TOT Gain Parameters Calibrations Type of Data processing –Online script (TkrTotGain.py). Perquisites –Calibrated GTFE threshold DAC. Output –Special xml file. Converted to ROOT file and put into offline analysis database. Direct access to the xml file from charge scale calibration job via job option. Trending –Offline python script to read online test reports. –Manual handling of valid run number list.

GLAST LAT Project LAT Instrument Analysis Workshop – Feb 27, 2006 Hiro Tajima, TKR Data Processing Overview 6 Channel Thresholds Calibrations Type of Data processing –Online script (TkrThrDispersion.py). Perquisites –Calibrated GTFE threshold DAC. –GTFE charge scale. Output –Special xml file. Converted to ROOT file and put into offline analysis database for MC generation. Trending –N/A.

GLAST LAT Project LAT Instrument Analysis Workshop – Feb 27, 2006 Hiro Tajima, TKR Data Processing Overview 7 Dead/Disconnected Channels Calibrations Type of Data processing –Online script (TkrNoiseAndGain.py). –Offline data analysis (svac/EngineeringRoot/TkrHits). –Offline history analysis (calibGenTKR/totCalib). Perquisites –NONE. Output –Dead strip xml file. Manually included as LATTE schema ancillary file. –LATTE schema file is converted to LATc to be used in LICOS. Put into offline analysis database. Trending –Offline python script to read output xml file. –Manual handling of valid run number list.

GLAST LAT Project LAT Instrument Analysis Workshop – Feb 27, 2006 Hiro Tajima, TKR Data Processing Overview 8 Hot Strips Calibrations Type of Data processing –Online script (TkrNoiseOccupancy). –Offline data analysis (svac/EngineeringRoot/TkrNoiseOcc). –Offline history analysis (in development). Offline data to mask new hot strips. Online data to put cured strips into probation. Perquisites –NONE. Output –Hot strip xml file. Manually included as LATTE schema ancillary file. –LATTE schema file is converted to LATc to be used in LICOS. Put into offline analysis database Trending –Offline python script to read output xml file. –Manual handling of valid run number list.

GLAST LAT Project LAT Instrument Analysis Workshop – Feb 27, 2006 Hiro Tajima, TKR Data Processing Overview 9 Calibration Data Processing Flow (1) Data processing flow for threshold, charge scale, TOT gain. Muon data Offline calibration Database Threshold DAC calibration Offline charge scale analysis Charge scale xml file threshold DAC xml file TOT gain calibration TOT gain xml file Channel thresh. xml file Channel thresh. calibration Muon data taking

GLAST LAT Project LAT Instrument Analysis Workshop – Feb 27, 2006 Hiro Tajima, TKR Data Processing Overview 10 Calibration Data Processing Flow (2) Data processing flow for bad strips. Muon data Hot strip calibration Disconnected strip analysis Hot strip xml file Dead channel calibration Dead channel xml file Dead/disconnected strip xml file Muon data taking Hot strip monitor Hot strip offline data Hot strip history analysis Hot strip online data

GLAST LAT Project LAT Instrument Analysis Workshop – Feb 27, 2006 Hiro Tajima, TKR Data Processing Overview 11 Current Calibration Data Trending Flow Currently there are too much manual processing. Trending Analysis Charge scale xml file Threshold DAC test report TOT gain test report Hot strip xml file Dead/disconnected strip xml file Valid run or file list ROOT graph

GLAST LAT Project LAT Instrument Analysis Workshop – Feb 27, 2006 Hiro Tajima, TKR Data Processing Overview 12 Desired Calibration Data Trending Flow Use database to keep track of parameters to be trended. –Should be common to the database for online schema files and offline calibration file. Charge scale xml file Threshold DAC xml file TOT gain xml file Hot strip xml file Dead/disconnected strip xml file Calibration Database Trending Analysis Trend data ISOC Trending Database

GLAST LAT Project LAT Instrument Analysis Workshop – Feb 27, 2006 Hiro Tajima, TKR Data Processing Overview 13 TKR Performance Monitor Monitored Parameters –Hot strips, noise flare (see Sugizaki’s talk). –Disconnected strips (see Mizuno’s talk). –Efficiency, layer and tower displacements. Type of Data processing –Muon offline data analysis. Built into SVAC ntuple processing. Perquisites –Calibrated TKR. Output –NONE defined so far. Exist as ROOT histograms. Trending –Manual analysis of ROOT histograms. –Manual handling of valid run number list. Some parameters require multiple runs.

GLAST LAT Project LAT Instrument Analysis Workshop – Feb 27, 2006 Hiro Tajima, TKR Data Processing Overview 14 TKR Performance Trending Flow Multiple runs need to be combined to get sufficient statistics. –This part should be automated somehow. Muon data Data pipeline Muon data taking SVAC ROOT Valid run list Trending Analysis Excel graph

GLAST LAT Project LAT Instrument Analysis Workshop – Feb 27, 2006 Hiro Tajima, TKR Data Processing Overview 15 Efficiency Trending Result Consistent downward trend. –Inconsistent with stable bad strips. –Probably due to LAT configuration change. Efficiency values depend on track quality and other factors. Further improvement on track selections required to make it more stable.

GLAST LAT Project LAT Instrument Analysis Workshop – Feb 27, 2006 Hiro Tajima, TKR Data Processing Overview 16 Layer Displacement Monitoring Monitor average of residual from straight line fit within the tower. –The value depends on track angle distribution and other factors. –The result is consistent with Pisa alignment results. –Variation of the layer displacement from reference is consistent with statistical error. Issue warning if layer displacement is varied from the reference by more than 4 . Layer displacement (mm) Pisa alignment parameter (mm) Layer displacement change/error

GLAST LAT Project LAT Instrument Analysis Workshop – Feb 27, 2006 Hiro Tajima, TKR Data Processing Overview 17 Tower Displacement Monitoring Monitor average of residual from track extrapolated from adjacent towers. –The value depends on track angle distributions and tower configuration. Comparison between different LAT configuration is not very meaningful. –Variation of the tower displacement from reference is NOT consistent with statistical error. Tower displacement change/error

GLAST LAT Project LAT Instrument Analysis Workshop – Feb 27, 2006 Hiro Tajima, TKR Data Processing Overview 18 Conclusions Trending of TKR calibration data requires some offline analysis due to large number of elements involved. Calibration data trending requires much manual processing. –We would like to have database to store all valid (online/offline) calibration data to automate. –We would like to utilize ISOC trending tool for UI. TKR performance monitor is being implemented. –Basic data processing implemented in data pipeline. Systematic effects on tower efficiency and displacement need to be addressed. –Automation required to combine multiple runs. –Interface to ISCO trending tool.