Verification and Validation — An OSD Perspective — Fred Myers Deputy Director, Test Infrastructure Test Resource Management Center November 4, 2009.

Slides:



Advertisements
Similar presentations
Systems Engineering From a Life Cycle Perspective John Groenenboom Director Engineering – Mesa Boeing Rotorcraft Dec 12, 2007.
Advertisements

Roadmap for Sourcing Decision Review Board (DRB)
C.B. Cochrane 1 Jan 2009 The 5000 documents have been issued as a directive, two directives, a directive and an instruction, a directive and a regulation,
© 2009 The MITRE Corporation. All rights Reserved. Evolutionary Strategies for the Development of a SOA-Enabled USMC Enterprise Mohamed Hussein, Ph.D.
1 System Eng. in DoD 13 October 2010 WORKFORCE COMPOSITION CPR PEO IEW&S Organizational Assessment VCSA Brief Date 2010 This briefing is UNCLASSIFIED/FOUO.
“Common Process for Developing Briefings for Major Decision Points” INSTRUCTIONS Provide Feedback via to: Lois Harper PEO C4I and Space
1 Achieving Total Systems Management (ATSM) Acquisition Strategies to Increase Reliability and Reduce Logistics Footprint PEO/SYSCOM Workshop November.
DoD Systems and Software Engineering A Strategy for Enhanced Systems Engineering Kristen Baldwin Acting Director, Systems and Software Engineering Office.
The Software Product Life Cycle. Views of the Software Product Life Cycle  Management  Software engineering  Engineering design  Architectural design.
Software Verification and Validation (V&V) By Roger U. Fujii Presented by Donovan Faustino.
Chemical Biological Defense Acquisition Initiatives Forum (CBDAIF)
Enterprise Architecture
1 Space Systems Acquisition Policy/Guidance Rapid Deployment Training (RDT) January 2015.
NDIA SE Division Meeting February 13, Developmental Test and Evaluation Committee Beth Wilson, Raytheon Steve Scukanec, Northrop Grumman Industry.
Software System Engineering: A tutorial
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
DEVELOPMENTAL TEST & EVALUATION DT&E – From Concept to Combat Integrated Test Process Darlene Mosser-Kerner Developmental Test & Evaluation OUSD(AT&L)/Systems.
Configuration Management Non Government Std: EIA Standard-649 “A management process for establishing and maintaining consistency of a product’s performance,
CHECKPOINTS OF THE PROCESS Three sequences of project checkpoints are used to synchronize stakeholder expectations throughout the lifecycle: 1)Major milestones,
New 5000 Documents 14 May 2001 New 5000 Documents 14 May 2001 Defense Systems Management College Acquisition Policy Department.
The Defense Acquisition Management System 2009 Implementing DoDI 5000
Life Cycle Logistics.
1 MRL Assist Tool Website Access the MRL Assist Tool at
1 3 Dec 2008 Changes from the May 2003 DoDI Policy Flowing from Numerous New/Revised sections of Public Law since 2003 (some with Multiple Requirements)
Lecture 2.1b: DoD Acquisition Process (SEF Ch 2)
DoD Parts Management Reengineering Status Briefing Defense Standardization Conference 25 May 2006 Donna McMurry, DSPO.
0 2 Nov 2010, V1.4 Steve Skotte, DAU Space Acquisition Performance Learning Director New Space Systems Acquisition Policy.
Parts Management Re-engineering and Warfighter Support International Society of Logistics May 17, 2005 Gregory E. Saunders Director, Defense Standardization.
Life Cycle Cost Savings by Improving Reliability Dr. Charles E. McQueary Director, Operational Test and Evaluation January 15, 2009.
| 1 Weapon System Acquisition Reform- Product Support Assessment DAU SYMPOSIUM 13 April 2010 Presented by: Basil Gray Where Innovation.
1 Lecture 2.4a: SEF SE Planning and the SEP (SEF Ch 16) Dr. John MacCarthy UMBC CMSC 615 Fall, 2006.
1 Lecture 2.3: SE Process (SEF Ch 3) Dr. John MacCarthy UMBC CMSC 615 Fall, 2006.
Environment, Safety, and Occupational Health Opportunities in DoD Business Transformation May 4, 2006.
2.1 ACQUISITION STRATEGYSlide 1 Space System Segments.
ICOTE Meeting October, Chief Developmental Tester Project Status for ICOTE October 2014 Brendan Rhatigan – Lockheed Martin.
Business, Cost Estimating & Financial Management Considerations
Dr. Thomas D. Fiorino November 2002
MORS Special Meeting: Risk, Trade Space, & Analytics for Acquisition
DoD Template for Application of TLCSM and PBL
Supportability Design Considerations
System Engineering Considerations (See Chapters 3 and 9)
Technology Readiness Assessment (TRA)
Life Cycle Logistics.
Competitive Prototyping – the New Reality
2012 Spring Simulation Interoperability Workshop
MDD to Milestone A Requirements Management Activities
ISA 201 Intermediate Information Systems Acquisition
Milestone A to Milestone B Requirements Management Activities
New Space Systems Acquisition Policy
DAG CH 3 Figure 11: Weapon System Development Life Cycle
ISA 201 Intermediate Information Systems Acquisition
Importance of T&E Connotations
Test and Evaluation Considerations
DAG CH 3 Figure 17: Weapon System Development Life Cycle
DAG CH 3 Figure 23: Weapon System Development Life Cycle
DAG CH 3 Figure 13: Weapon System Development Life Cycle
DAG CH 3 Figure 19: Weapon System Development Life Cycle
DAG CH 3 Figure 18: Weapon System Development Life Cycle
Technical Management Processes
DAG CH 3 Figure 28: Weapon System Development Life Cycle
DAG CH 3 Figure 15: Weapon System Development Life Cycle
8 Tech Processes Drive Acquisition
The Department of Defense Acquisition Process
Perspectives on Transforming DT and OT Industry-Government Roundtable
DAG CH 3 Figure 21: Weapon System Development Life Cycle
DAG CH 3 Figure 27: Weapon System Development Life Cycle
DAG CH 3 Figure 22: Weapon System Development Life Cycle
DAG CH 3 Figure 25: Weapon System Development Life Cycle
Presentation transcript:

Verification and Validation — An OSD Perspective — Fred Myers Deputy Director, Test Infrastructure Test Resource Management Center November 4, 2009

2 Outline Test Resources Test Organizations within the DoD Definitions Acquisition Time-line for the DoD Systems Engineering (SE) T&E Life Cycle (TES/TEMP) Relationship between SE and T&E DoD T&E Best Practices Summary

3 T&E Resources: A collective term that encompasses the requisite Workforce, Infrastructure and Funding resulting in a T&E Capability, by means of the T&E Processes T&E Resources T&E Capabilities T&EProcesses T&EWorkforce T&E Infrastructure FacilitiesBuildingsEquipmentNetworks Range Space : Funding DMS MF SIL HWIL ISTF OAR

4 Test Organizations within the DoD Secretary of Defense Under Secretary of Defense Acquisition, Technology & Logistics Director Operational Test & Evaluation Certify weapon systems for:Certify weapon systems for: –Operational Effectiveness and Suitability –Live-fire System Vulnerability and Lethality Director Test Resource Management Center DoD Strategic Plan for T&E ResourcesDoD Strategic Plan for T&E Resources Certification of Service / Agency T&E BudgetsCertification of Service / Agency T&E Budgets Oversight of T&E InfrastructureOversight of T&E Infrastructure Director Defense Research and Engineering Director Developmental Test and Evaluation DT&E PolicyDT&E Policy Acquisition T&E Career WorkforceAcquisition T&E Career Workforce DT&E Program OversightDT&E Program Oversight

5 Definitions Systems Engineering is defined by ANSI/EIA , “Processes for Engineering a System” as "An interdisciplinary approach encompassing the entire technical effort to evolve and verify an integrated and total life cycle balanced set of system, people, and process solutions that satisfy customer needs" Integrated Testing is defined by OSD Memo, “Definition of Integrated Testing,” dated 25 April 2008 as “The collaborative planning and collaborative execution of test phases and events to provide shared data in support of independent analysis, evaluation, and reporting by all stakeholders, particularly the developmental (both contractor and government) and operational test and evaluation communities” Verification is defined by DoD Directive , "DoD Modeling and Simulation (M&S) Management" as "The process of determining that a model implementation and its associated data accurately represents the developer's conceptual description and specifications" Validation is also defined by DoDD Directive as "The process of determining the degree to which a model and its associated data are an accurate representation of the real world from the perspective of the intended uses of the model" Verify: To establish the truth, accuracy, and reality of a system's performance Validate: To corroborate on a sound or authoritative bases--confirm

6 Operations & Support Production & Deployment FRP Decision Review LRIP / IOT&E Engineering & Manufacturing Development PostPost PDRCDR AA TechnologyDevelopment Material Solution Analysis Material Development Decision Full Operational Capability (FOC) Initial Operational Capability (IOC) CAB Pre-Systems Acquisition Systems Acquisition Sustainment = Decision Point = Milestone Review= Decision Point if PDR is not conducted before Milestone B (Program Initiation) User Needs Technology Opportunities & Resources The Material Developer Decision precedes entry into any phase of the acquisition Management System Entrance Criteria met before entering phase Evolutionary Acquisition or Single Step to Full Capability Acquisition Time-line for the DoD PDR: Preliminary Design Review CDR: Critical Design Review LRIP: Low-Rate Initial Production FPR: Full-Rate Production

7 Scope: Enable systems engineering across acquisition life cycle Systems Engineering (SE) User Requirements & Concept of Operations System Requirements & Architecture Component Design Component Integration & Test System Integration & Test System Demonstration & Validation Procure, Fabricate, & Assemble Parts Design Feedback Recursive Processes Recursive Processes Operations & Support Production & Deployment FRP Decision Review LRIP / IOT&E Engineering & Manufacturing Development PostPost PDRCDR AA TechnologyDevelopment Material Solution Analysis Material Development Decision FOCIOCCAB "V&V Occurs throughout the SE Process"

8 Operations & Support Production & Deployment FRP Decision Review LRIP / IOT&E Engineering & Manufacturing Development PostPost PDRCDR AA T&E Life Cycle (TES/TEMP) Early T&E involvement in technical planning is critical TechnologyDevelopment Material Solution Analysis Material Development Decision FOCIOC CAB

9 Relationship between SE and T&E (Defense Acquisition Guidebook) Systems engineering is a process to transform required operational and sustainment capabilities into a system design solution As the design solution evolves, a verification component of the systems engineering process must provide confidence that the design solution properly addresses the desired capabilities, as intended T&E is the mechanism for accomplishing the verification loop in the systems engineering process and characterizing technical risk of achieving a proper final design solution

10 DoD T&E Best Practices Recognize T&E value: –Use T&E to understand risk and identify problems early –Provides V&V for system design and development Embed T&E in Acquisition Strategy: –T&E Strategy must be part of the acquisition strategy Develop a sound T&E strategy and plan: –Ensure both contain realistic schedules and adequate resources Employ event-driven T&E planning and execution: –Use event-driven T&E plan to reduce technical risk –Do not sacrifice testing to meet schedules

11 DoD T&E Best Practices (Cont.) Ensure early involvement by all stakeholders in T&E planning and execution Integrate T&E in contracts: –Develop T&E strategy along with RFP development –Ensure key requirements can be tested and evaluated –Use T&E as a source selection criteria –Ensure Government has access to all test data –Ensure Government can conduct an independent evaluation and assessment Focused early testing — Identify biggest risks and test them first "Build-a-Little — Test-a-Little" Evaluation is the key to successful testing –Provide feedback to the system designer and developer

12 Summary T&E can reduce cost, schedule and technical risk T&E results figure prominently in the decisions reached at design and milestone reviews The fact that T&E results are required does not presuppose the results will be favorable Only the decision-makers can determine the weight and importance of a system's diverse capabilities and shortcomings — the degree of risk they are willing to accept Good T&E information enables informed decisions