6.2.2007 Beijing ILC Workshop Global Design Effort 1 High-Gradient Module Test Lutz Lilje.

Slides:



Advertisements
Similar presentations
Lutz Lilje DESY -MPY- XFEL Tuner Lorentz Force Detuning System Setup New Saclay design.
Advertisements

Piezo Studies and Temperature Measurements Ruben Carcagno May 11, 2005.
RF Unit Test Facility at NML & CM1 Test Plan Bob Kephart Fermilab IWLC-10 October 20, 2010.
SLHC-PP – WP7 Critical Components for Injector Upgrade Plasma Generator – CERN, DESY, STFC-RAL Linac4 2MHz RF source Thermal Modeling Gas Measurement and.
Superconducting Accelerating Cryo-Module Tests at DESY International Workshop on Linear Colliders 2010 (ECFA-CLIC-ILC Joint Meeting) Denis Kostin, MHF-SL,
Cavity Integration summary H. Hayano April 25, 2008 ILC-SCRF
E. KAKO (KEK) 2009' Sept. 30 Albuquerque Global Design Effort 1 Cavity Test Items in S1-G Cryomodule Eiji Kako (KEK, Japan)
TDR Part 2: 3.3 Cavity Integration (10 pages) H. Hayano Baseline Design based on the meeting discussion.
E. KAKO (KEK) 2010' Sept. 10 KEK Global Design Effort 1 Lorentz Force Detuning Eiji Kako (KEK, Japan)
, DESY, Hamburg ECFA Workshop, SCRF Session, Lutz Lilje, DESY Lutz Lilje DESY European Linear Collider Workshop ECFA LC2013 Fabrication and Quality.
SRF Cryomodule 2 Cavity Test Results Andy Hocker TD/SRF Dev Dept. All Experimenters Meeting, 10-OCT-2011.
Lutz Lilje DESY -MPY- Module Issues XFEL Linac Review R. Lange/L. Lilje Ongoing Tests Module Designs Future tests.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Lutz Lilje, DESY, TILC08 Tests with the Fast Frequency Tuners in the Saclay-I design Lutz.
XFEL SRF Accelerating Module Prototypes Tests at DESY Fermilab Seminar, July 21st Denis Kostin, MHF-SL, DESY.
Compatibility in the ILC ML. 主なデザインと相違点 BCD ( TTF) STF-BL その他 空洞、シー ル Φ 78 mm ビームパイ プ、アルミヘキサゴ ン Φ 80 mm ビームパイ プ、インジウムヘリ コ LL, Re 入力カプ ラー TTF-III 円筒セラミック窓.
Recent LFD Control Results from FNAL Yuriy Pischalnikov Warren Schappert TTF/FLASH 9mA Meeting on Cavity Gradient Flatness June 01, 2010.
S.Noguchi (KEK) ILC08 Chicago , Nov . 17, Cavity Package Test in STF STF Phase-1 E. Kako, S. Noguchi, H. Hayano, T. Shishido, M. Sato, K. Watanabe,
1 LCWS10 Beijing S1 Global RF Prep (S. Fukuda) 29/3/ S1-Global RF Preparation KEK S. Fukuda Content Time Schedule of S1 Global in KEK Achieving Goal.
RF system issues due to pulsed beam in ILC DR October 20, Belomestnykh, RF for pulsed beam ILC DR, IWLC2010 S. Belomestnykh Cornell University.
Marc Ross Nick Walker Akira Yamamoto ‘Overhead and Margin’ – an attempt to set standard terminology 10 Sept 2010 Overhead and Margin 1.
Global Design Effort 1 S0 Status High-Gradient cavities Lutz Lilje DESY supplement by H. Hayano 04Sep2008 EC
ILC MAC Meeting FNAL Global Design Effort 1 S0S1 Taskforce High-Gradient SC Cavities Lutz Lilje GDE.
S1G Experiment Schedule Plan; H. Hayano ILC10 GDE meeting.
Blade Tuner L. Lilje for the INFN colleagues. Disclaimer The slides were prepared by R. Paparella and N. Panzeri for Carlo Pagani who could not attend.
ILC FAST TUNER R&D PROGRAM at FNAL Status Report CC2 Piezo Test Preliminary Results Ruben Carcagno (on behalf of the FNAL FAST TUNER Working Group) 4/5/06.
Test plan for SPL short cryomodule O. Brunner, W. Weingarten WW 1SPL cryo-module meeting 19 October 2010.
Americas Cavity Specification C.M. Ginsburg (Fermilab) On behalf of the Fermilab cavity crew October 20, 2010.
Performance of magnetostrictive element at LHe environment 12th International Conference MIXDES 2005 Performance of magnetostrictive element at LHe environment.
TILC09 SCRF Session Global Design Effort 1 EU Status TILC09 SCRF Session Lutz Lilje DESY.
Summery of the power coupler session at the LCWS13 workshop E. Kako W.-D. Möller H. Hayano A. Yamamoto All members of SCRF WG November 14, 2013.
E. KAKO (KEK) 2009' Oct. 26 ILC KEK Global Design Effort 1 Cavity Preparation for S1-Global Eiji Kako (KEK, Japan)
Rolf Lange DESY ILC Workshop 1-June-07 XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Module Industrialisation for XFEL How to proceed.
HiGrade-Kickoff DESY Global Design Effort 1 ILC-HiGrade WP6 High-Gradient cavities Lutz Lilje DESY.
Preliminary Results from First Blade Tuner Tests in HTS Yuriy Pischalnikov Warren Schappert Serena Barbannoti Matteo Scorrano.
John Carwardine 20 April 09 Preliminary planning for Aug/Sept studies.
Detail plan of S1-Global H. Hayano (KEK),
Cryogenic Cooling Schemes for the SPL U. Wagner TE-CRG.
Beijing ILC Workshop Global Design Effort 1 Main Linac EDR: Cavity & Cryomodule Discussion Lutz Lilje DESY.
Tuner, Coupler WP & specification table H. Hayano, KEK GDE Sendai.
Plug compatibility discussion TILC09 cavity integration session H. Hayano.
Warren Schappert Yuriy Pischalnikov FNAL SRF2011, Chicago.
Overview of long pulse experiments at NML Nikolay Solyak PXIE Program Review January 16-17, PXIE Review, N.Solyak E.Harms, S. Nagaitsev, B. Chase,
Gradient Degradation Experience at Fermilab (NML/CM-1) Elvin Harms TTC Meeting, Beijing 5-8 December 2011.
Matthias Liepe. Matthias Liepe – High loaded Q cavity operation at CU – TTC Topical Meeting on CW-SRF
A Proposal for FJPPL (TYL) Development of Frequency Tuners Optimization and Cryomodule Integration for 1.3 GHz SRF Cavities G. Devanz, F. Nunio, O. Napoly.
1 Tuner performance with LLRF control at KEK Shin MICHIZONO (KEK) Dec.07 TTC Beijing (Michizono) S1G (RDR configuration) - Detuning monitor - Tuner control.
Superconducting Accelerating Cryo-Module Tests at DESY TESLA Technology Collaboration (TTC) Meeting, February 28 - March , Milano, Italy Denis Kostin,
Tuners for 1.3 GHz Elliptical Cavities Warren Schappert Fermilab TD/I&C Thursday May 29, 2013.
Rev 0.3: Aug 7, Notes from TRISTAN Experiences N.Toge (KEK) for GDE RDB S2 Rev.0.3 Aug. 7, 2006.
Cost Optimization Models for SRF Linacs
S1G Experiment Schedule Plan
Power Couplers, HOM Couplers and Tuners for the XFEL
TTC Topical Workshop - CW SRF, Cornell 12th – 14th June 2013
R. Paparella, INFN-Milan, LASA Laboratory, Segrate, Italy
S1-G for TTC meeting Global Design Effort
Evolving an ILC focused SCRF Facility from the XFEL Infrastructure
Input coupler assembly, high power and thermal performance in S1-Global at KEK E. KAKO (KEK) 2011' Dec. 07 TTC meeting in Beijing.
S1-G Webex meeting Global Design Effort
Main Linac EDR: Cavity & Cryomodule Discussion
Mechanical setups Lorentz Force Detuning System Setup
R&D Activity for Field Emission and Vertical EP
High Gradient Cavities: Cost and Operational Considerations
World Wide Fundamental Power Coupler meeting #3
Degradation and possible sources Statistic of resonators
CW accelerating module test progress at DESY
Test plan of ESS HB elliptical cavity
High gradients in TESLA nine-cell cavities
FRIB summary of performance degradation - VTA to cryomodule
Exceptional Events During the Operation of the European XFEL
Summary of the maximum SCRF voltage in XFEL
Presentation transcript:

Beijing ILC Workshop Global Design Effort 1 High-Gradient Module Test Lutz Lilje

Beijing ILC Workshop Global Design Effort 2 Thanks! To D. Kostin, Rolf Lange, R. Paparella, K. Przygoda for the viewgraphs Many other people involved e.g. DESY technical groups etc. Dislaimer: –Some testing still on-going –Final evaluation after 10th cryo-cycle

Beijing ILC Workshop Global Design Effort 3 Module Test at DESY A high gradient module has been assembled Test in dedicated test stand underway e.g. –Thermal cycles –Heat loads –Cavity performance –Coupler conditioning –Fast tuner performance

Beijing ILC Workshop Global Design Effort 4 Overall Module Performance Thermal cycling –10 cycles total planned 7 done so far –No leaks –Wire position o.k. Heat loads –Statical heat loads as other modules tested in TTF/FLASH

Beijing ILC Workshop Global Design Effort 5 Wire Positions Preliminary Plot illustrates that positions are repeatably achieved Final evaluation to follow Also on-going vibration measurements

Beijing ILC Workshop Global Design Effort 6 Cavity Performance (courtesy D. Kostin – DESY) Average gradient: 28 MV/m planned

Beijing ILC Workshop Global Design Effort 7 Q(Eacc)

Beijing ILC Workshop Global Design Effort 8 HPP on Cavity 5 +6 For short pulses up to 300 us gradient is high >30 MV/m Radiation levels are relatively low This hints to a thermal quench

Beijing ILC Workshop Global Design Effort 9 Cavity results 6 cavities perform very similar to previous tests –Even up to 35 MV/m pulsed operation 2 don‘t… –Even after HPP, limitation likely thermal quench –The reason is NOT understood (yet)! –Suspicious: Cavities behave like twins in all tests –Speculations (!!!!!!!): Assembly procedures –After the cavity on position 4 an intermediate leak check is made, and the necessary additional flange assembly and disassembly could lead to contamination Coupler 5 had leak in the warm part (see below), exchange needed –Should not have impact on cavity vacuum. Both cavities have not seen 120°C bakeout for schedule reasons –But CHECHIA test was o.k.

Beijing ILC Workshop Global Design Effort 10 Coupler Processing (courtesy D. Kostin – DESY) Done in to steps –1st set of 4 couplers Very tight vacuum interlock thresholts –2nd set of 4 couplers Used ‘relaxed’ vacuum interlock thresholts Very fast processing –Due to improved handling after pre-processing at LAL Orsay –Comparable to individual cavity high power test results

Beijing ILC Workshop Global Design Effort 11

Beijing ILC Workshop Global Design Effort 12

Beijing ILC Workshop Global Design Effort 13 Coupler 5: Leak in Warm Part

Beijing ILC Workshop Global Design Effort 14

Beijing ILC Workshop Global Design Effort 15 Reconditioning after Repair

Beijing ILC Workshop Global Design Effort 16 Second Set of Coupler

Beijing ILC Workshop Global Design Effort 17

Beijing ILC Workshop Global Design Effort 18

Beijing ILC Workshop Global Design Effort 19 Fast Tuner Tests (R.Paparella –INFN, K. Przygoda – Uni. Lodz, L. Lilje DESY) Cavities have two piezos installed –sensor-actuator, redundancy Technical remark –All measurements with RF feedforward (no feedback) –All detunings refer to the ‘Flat-Top’-region (beam acceleration) of the RF pulse Detuning rather similar for all cavities All cavities (but one) compensated at maximum gradient with simple pulse –E.g. Cavity 3 at 35 MV/m –Cavity 5 Piezo no mechanical contact at 1,3 GHz Known problem: Piezo fixture stiffness for large pre-detuning of cavity –Currently cavities are compressed, thus exerting an extension of the piezo brackets –This will be changed for future cavities, cavities will pull on fixture »N.B.: All ILC tuner designs use cavity that pull. ‘Natural’ frequency of Cavity 5 after cooldown is 317 kHz above 1.3 GHz, larger compression of cavity needed At 10 kHz above, operational Further investigation ongoing e.g. effects due to thermal cycling –Piezo Voltages within margin Could also use bipolar operation, but not needed –Delay of piezo can be used to set cavity pre-detuning

Beijing ILC Workshop Global Design Effort 20 Lorentz Force Detunings in Module 6 cavities

Beijing ILC Workshop Global Design Effort 21 Example: Cavity 3

Beijing ILC Workshop Global Design Effort 22 Cavity 3: Gradient 35 MV/m

Beijing ILC Workshop Global Design Effort 23 Cavity 3: Phase

Beijing ILC Workshop Global Design Effort 24 Cavity 3: Detuning

Beijing ILC Workshop Global Design Effort 25 Maximum Compensation per Cavity

Beijing ILC Workshop Global Design Effort 26 Voltage Needed for Compensation

Beijing ILC Workshop Global Design Effort 27 Compensated Detuning vs. Delay to MV/m

Beijing ILC Workshop Global Design Effort 28 Pre-Detuning Change Due to Piezo Pulse Delay Can change the cavity pre-detuning of the cavity by changing the delay of the ‘second‘ pulse in the order of 200Hz Changes in pre- detuning could be compensated by changing piezo delay instead of using stepper motor –Less motor usage, increase lifetime –Correponds to He drifts of a few mbar

Beijing ILC Workshop Global Design Effort 29

Beijing ILC Workshop Global Design Effort 30 Summary –No leaks, Static heat loads are o.k. –Cavities Six cavities show expected performance Two cavites perform significantly below their individual high power test results –Not understood (yet) –Other components work well Coupler processed quickly –Improved handling paid off Fast tuners perform up to 35 MV/m –One exception: Problem of the fixture understood –Module test stand is a big asset Independent tests of FLASH E.g. Rapid thermal Cycles

Beijing ILC Workshop Global Design Effort 31

Beijing ILC Workshop Global Design Effort 32