Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Applying Annual Worth Analysis Lecture.

Slides:



Advertisements
Similar presentations
Lecture No. 23 Chapter 7 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5 th edition, © 2010.
Advertisements

Contemporary Engineering Economics, 4 th edition, © 2007 Effects of Inflation on Project Cash Flows Lecture No. 45 Chapter 11 Contemporary Engineering.
Debt Management Lecture No.10 Professor C. S. Park Fundamentals of Engineering Economics Copyright © 2005.
Contemporary Engineering Economics, 4 th edition, © 2007 Replacement Analysis Fundamentals Lecture No. 56 Chapter 14 Contemporary Engineering Economics.
8/25/04 Valerie Tardiff and Paul Jensen Operations Research Models and Methods Copyright All rights reserved Economic Decision Making Decisions.
Contemporary Engineering Economics, 4 th edition, © 2007 Variations of Present Worth Analysis Lecture No.17 Chapter 5 Contemporary Engineering Economics.
Contemporary Engineering Economics, 4 th edition, © 2007 Generalized Cash Flow Approach – Lease versus Buy Lecture No. 42 Chapter 10 Contemporary Engineering.
Contemporry Engineering Economics, 4 th edition, © 2007 Equivalence Calculations with Continuous Payments Lecture No.12 Chapter 4 Contemporary Engineering.
Contemporary Engineering Economics, 4 th edition, © 2007 When Projects Require Financing Activities Lecture No. 41 Chapter 10 Contemporary Engineering.
Chapter 11 Replacement Decisions
Present Worth Analysis Lecture No.15 Professor C. S. Park Fundamentals of Engineering Economics Copyright © 2005.
(c) 2001 Contemporary Engineering Economics 1 Chapter 8 Annual Equivalent Worth Analysis Annual equivalent criterion Applying annual worth analysis Mutually.
Sensitivity and Breakeven Analysis
Chapter 15 Replacement Decisions
Contemporary Engineering Economics, 4 th edition, © 2007 Discounted Cash Flow Analysis Lecture No.16 Chapter 5 Contemporary Engineering Economics Copyright.
(c) 2001 Contemporary Engineering Economics 1 Chapter 7 Present Worth Analysis Describing Project Cash Flows Initial Project Screening Method Present Worth.
Contemporary Engineering Economics, 4 th edition, © 2007 Comparing Mutually Exclusive Alternatives Lecture No.18 Chapter 5 Contemporary Engineering Economics.
Contemporary Engineering Economics, 4 th edition, © 2007 Debt Management Lecture No.13 Chapter 4 Contemporary Engineering Economics Copyright © 2006.
Chapter 8 Annual Equivalent Worth Analysis
Annual Equivalent Worth Criterion
Contemporary Engineering Economics, 4 th edition, © 2007 Economic Service Life Lecture No. 57 Chapter 14 Contemporary Engineering Economics Copyright ©
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Rate of Return Analysis Lecture No.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Annual Equivalent Worth Criterion.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Equivalence Calculations with Effective.
Lecture No. 37 Chapter 11 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5th edition, © 2010.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Replacement Analysis with Tax Consideration.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Effects of Inflation on Project Cash.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Benefit-Cost Ratio Lecture No. 53.
Lecture No.19 Chapter 6 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5 th edition, © 2010.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Debt Management Lecture No. 13 Chapter.
ENGINEERING ECONOMICS ISE460 SESSION 13 Annual Equivalent, June 17, 2015 Geza P. Bottlik Page 1 OUTLINE Questions? News? Annual Equivalent Examples.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Process of Developing Project Cash.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Replacement Analysis Fundamentals.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Estimating Project Volatility Lecture.
Evaluating a Single Project
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Variations in Present Worth Analysis.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Methods for Finding the Rate of Return.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Design Economics Lecture No. 22 Chapter.
Lecture No.20 Chapter 6 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5 th edition, © 2010.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Generalized Cash Flow Approach –
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Replacement Decisions Lecture No.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Discounted Cash Flow Analysis Lecture.
Contemporary Engineering Economics, 4 th edition, © 2007 Applying Annual Worth Analysis Lecture No.20 Chapter 6 Contemporary Engineering Economics Copyright.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Interest Formulas (Gradient Series)
Interest Formulas for Single Cash Flows
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Interest Formulas – Equal Payment.
Contemporary Engineering Economics, 4 th edition, © 2007 When Projects Require Only Operating and Investing Activities Lecture No. 39 Chapter 10 Contemporary.
Corporate Income Taxes
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Engineering Economic Decisions Lecture.
Project cash flow n A B Example 1: Consider the following two mutually exclusive investment projects. Assume.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Economic Equivalence Lecture No.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Estimating Profit from Production.
1 Replacement Decision Models Lecture No. 28 Chapter 11 Fundamentals of Engineering Economics Copyright © 2008.
Lecture No.18 Chapter 5 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5 th edition, © 2010.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Comparing Mutually Exclusive Alternatives.
Chapter 6 Annual Equivalent Worth Criterion. Chapter 6 Annual Equivalence Analysis  Annual equivalent criterion  Applying annual worth analysis  Mutually.
Effects of Inflation on Project Cash Flows
Replacement Analysis Lecture No. 46 Chapter 14
Variations in Present Worth Analysis
Rate of Return Analysis
Applying Annual Worth Analysis
Inflation and Its Effects on Project Cash Flows
Equivalence Calculations with Continuous Payments
Equivalence Calculations with Continuous Payments
Annual Equivalent Worth Criterion
Discounted Cash Flow Analysis
Chapter 7 Present Worth Analysis
Contemporary Engineering Economics, 6e, GE Park Copyright © 2016, Pearson Education, Ltd. All Rights Reserved Meaning and Measure of Inflation Lecture.
Applying Annual Worth Analysis
Presentation transcript:

Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Applying Annual Worth Analysis Lecture No. 20 Chapter 6 Contemporary Engineering Economics Copyright © 2016

Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Where to Apply the AE Analysis Unit cost (or profit) calculation Outsourcing (make-buy) decision Pricing the use of an asset

Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Unit Cost (Profit) Calculation Step 1: Determine the number of units (annual volume) to be produced (or serviced) each year over the life of the asset. Step 2: Determine the annual equivalent cost (or worth) of owning and operating the asset. Step 3: Divide the equivalent cost (worth) by the annual volume.

Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Example 6.5: Unit Profit per Machine Hour When Annual Operating Hours Remain Constant Project Cash Flows and Operating Hours

Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Solution Step 1: Determine the annual volume. 3,000 hours per year Step 2: Obtain the equivalent annual worth. PW (12%) = $30,065 AE (12%) = $30,065 (A/P, 12%, 4) = $9,898 Step 3: Determine the unit profit (savings per machine hour). Savings per machine hour = $9,898/3,000 = $3.30/hour Project Cash Flows and Operating Hours

Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Example 6.6: Unit Profit per Machine Hour When Annual Operating Hours Fluctuate

Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Solution Step 1: Determine the annual volume. Year 1: 3,500 hours Year 2: 4,000 hours Year 3: 1,700 hours Year 4: 2,800 hours Step 2: Obtain the equivalent annual worth. AE (12%) = $30,065 (A/P, 12%, 4) = $9,898 C[(3,500)(P/F,12%,1) + (4,000)(P/F,12%,2) + (1,700)(P/F,12%,3) + (2,800)(P/F,12%,4)] x (A/P,12%,4) = 3,062.95C Step 3: Determine the unit profit (savings per machine hour) C = $9,898/3, = $3.23/hour

Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Make or Buy Decision Step 1: Determine the time span (planning horizon) for which the part (or product) will be needed. Step 2: Determine the annual volume of the part (or product). Step 3: Obtain the unit cost of purchasing the part (or product) from an outside firm. Step 4: Determine the equipment, manpower, and all other resources required to make the part (or product).

Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Step 5: Estimate the net cash flows associated with the “make” option over the planning horizon. Step 6: Compute the annual equivalent cost of producing the part (or product). Step 7: Compute the unit cost of making the part (or product) by dividing the annual equivalent cost by the required annual volume. Step 8: Choose the option with the minimum unit cost.

Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Example 6.7: Outsourcing Production of Electric Compressors  Investment and Other Financial Date Related to Outsourcing Electric compressor: $42 per unit Required investment: $325,000 Salvage value: $60,000 Service life: 7 years Annual maintenance cost: $120,000 MARR: 18%

Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Solution

Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Pricing the Use of an Asset The cost per square foot for owning and operating a real property (example, user fee) The cost of using a private car for business (cost per mile) The cost of flying a private jet (cost per seat) The cost of using a parking deck (cost per hour)

Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Example 6.8: Pricing an Apartment Rental Fee  Investment Problem: Building a 50-unit apartment complex o Land investment cost = $1,000,000 o Building investment cost = $2,500,000 o Annual upkeep cost = $150,000 o Property taxes and insurance = 5% of total investment o Occupancy rate = 85% o Study period = 25 years o Salvage value = Only land cost can be recovered in full o Interest rate = 15%  At Issue: How to price the monthly rental per unit?

Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Solution Ownership cost Annual O&M Cost Total Equivalent Annual Cost Required Monthly Charge