20150421Calo Piquet Training Session - Xvc1 DCS and DSS Cuvée 2015 – RUN2 Xavier Vilasís-Cardona.

Slides:



Advertisements
Similar presentations
André Augustinus 15 March 2003 DCS Workshop Safety Interlocks.
Advertisements

16JAN08CaloECSMeeting - Xvc1 Calo ECS meeting DCS and PS/SPD temperature monitoring Xavier Vilasis-Cardona.
Alarms and interlocks handling in the FSM environment Hypernet 1.The standardization of the FSM state diagram; 2.The FSM error states and their recovering.
André Augustinus 16 June 2003 DCS Workshop Safety.
1 ALICE Detector Control System (DCS) TDR 28 January 2004 L.Jirdén On behalf of ALICE Controls Coordination (ACC): A.Augustinus, P.Chochula, G. De Cataldo,
1 CALO DCS power supply status CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Outline  Introduction  Power supply description with hardware.
The procedure to replace CALO rectifier (AC/DC converter) 1.
Yu. Guz 2015/04/211 CALO HV Updated version of the 2012 slides, ** See also Anatoli’s.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL and HCAL.  ECS HV control.
Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2012 Xavier Vilasis.
ECS for Front-End crates MARATON. 2 Introduction Front-End crates are powered by MARATON power supplies, located on the platform, at the back of each.
SMACS Slow Monitor And Control System Developed system for CDF-TOF proposed for Atlas-MDT/RPC.
LKr Calorimeter Control and monitoring R. Fantechi 19/02/2010 R. Fantechi.
XXVI Workshop on Recent Developments in High Energy Physics and Cosmology Theodoros Argyropoulos NTUA DCS group Ancient Olympia 2008 ATLAS Cathode Strip.
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
22 October 20151/23Fabio Vinagre -- TileCal DCS TileCal DCS Expert tutorial - DCS 22 October 2015.
TPC Prototype III TPC module anode HV edge LV module analog digital Cool sensor Gas sensor Shift Expert DCS Ch Skirt.
ECS for Front-End crates MARATON. 2 Introduction Front-End crates are powered by MARATON power supplies, located on the platform, at the back of each.
Controls EN-ICE Finite States Machines An introduction Marco Boccioli FSM model(s) of detector control 26 th April 2011.
1 Outline Firmware upgrade of the HV_LED_DAC boards. HV Status Bits board. Status of the board integration into the LHCb TFC system. CALO HV system and.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
26JUN08Calo Piquet Training Session - Xvc1 DCS and DSS Xavier Vilasis.
Bruno Belbute, October 2006 Presentation Rehearsal for the Follow-up meeting of the Protocol between AdI and CERN.
PHOS DCS guide (for PVSS based products only) Alexander Mamonov Last update: 1 th October, 2010.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
L0 DAQ S.Brisbane. ECS DAQ Basics The ECS is the top level under which sits the DCS and DAQ DCS must be in READY state before trying to use the DAQ system.
04ABR07Calo Commissioning Meeting - Xvc1 Power Supplies Xavier Vilasis-Cardona.
DSS  Informal review Tuesday 24 th October 10:00 Room , organized by Laurent Roy.  Subsystems will not be allowed to run overnight or at weekends.
1 LHCb CALO meeting Anatoli Konoplyannikov [ ITEP / LAPP ] Introduction Status bits of the LHCb readout supervisor ODIN HVSB board specification.
André Augustinus 9 October 2006 Interlocks update.
Running SPD OUTLINE VFE and CB overview Mapping CB panel: -Regulator board tab: how to switch ON/OFF the VFEs -Control tab: how to mask VFE -Test tab:
Handshake with the experiments 04/09/20091 R. Alemany (BE/OP/LHC) LHC Experiments Handshake.
CALO Commissioning Plans Pascal Perret LPC Clermont 17 March 2008.
DT Shifter Training Infrastructure A. Benvenuti, M.Giunta 07/07/2010.
1 User guide for Muon shifter part 2 : control of LV, HV, TELL1 Preliminary version 9-July-08 (to be checked by Michela) I have simply put together the.
DCS Instructions K. Grogg, M. Weinberg, M. Grothe 1/24/20161.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
24/03/2010ALICE TOF General Meeting March TOF hardware and data taking 2010 Andrea Alici Museo Storico della Fisica e Centro Studi e Ricerche “Enrico.
6. Shift Leader 1. Introduction 2. SL Duties 3. Golden Rules 4. Operational Procedure 5. Mode Handshakes 6. Cold Start 7. LHCb State Control 8. Clock Switching.
1 Summary of Calorimeter LED monitoring, LV & MV power and HV electronics + ECS control Anatoli Konoplyannikov Outline  Software tool of the LED.
22-March-2010CSC DCS Instructions1 Top Level of CSC DCS UI Communication Status Majority Logic Subsystem Panel HV, LV, FEDS CSC End View * CSC * PCrates.
RPC DSS & DCS Action Matrices Review Anton Dimitrov CMS Action Matrix Review 2015, 06.Mar.2015, CERN, Geneva.
14 February 2007 G. Bohner, R. Bonnefoy, M. Crouau, P. Jacquet, C. Lacan, J. Lecoq, S. Monteil, P. Perret, G. Reinmuth, K. Suchorski LPC Clermont PS Very-Front-End.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
1 TRT DCS: Shifter Basics Main goal – make sure TRT Detector is in good condition: - TRT FSM node: state READY and status OK - no alarms in the alarm screen.
Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.
S.Sergeev (JINR). Tracker consists of  4 stations of 4 views (planes) each In total ~7200 drift tubes (~450 per view) To be controlled/monitored 
1 ECS CALO LED Control System CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  Introduction  Calorimeter ECS LED monitoring.
Piquet report Pascal, Yuri, Valentin, Tengiz, Miriam Calorimeter meeting 16 March 2011.
CALO News Pascal Perret LPC Clermont 23 October 2011.
André Augustinus 18 March 2002 ALICE Detector Controls Requirements.
E.Guschin (INR,Moscow) 26 February 2008PS/SPD commissioning meeting CERN PS/SPD LED monitoring system status Tuning of SPD ‘C’ side: We concentrated our.
Yu. Guz 14/03/20121 CALO HV ** See also Anatoli’s slides for the 2009 piquet training **
1 Top Level of CSC DCS UI 2nd PRIORITY ERRORS 3rd PRIORITY ERRORS LV Primary - MaratonsHV Primary 1 st PRIORITY ERRORS CSC_COOLING CSC_GAS CSC – Any Single.
CALO News Pascal Perret LPC Clermont 22 January 2012.
Status Report TOTEM Collaboration Meeting 17-NOVEMBER-2014
1 XCAL LED quality check and time alignment consideration CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Outline  CALO sub-detector status.
20OCT2009Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2009 Xavier Vilasis.
E.Gushchin,S.Filippov(INR,Moscow) 16 April 2008Calo commissioning meeting CERN PS/SPD LED monitoring system status General status LED signal is used for.
CHEP 2010 – TAIPEI Robert Gomez-Reino on behalf of CMS DAQ group.
27SEP2008Calo Running and Operation Monday Meeting - Xvc1 ECS Xavier Vilasis-Cardona.
1 04 April 2007 L. Roy Detector Safety System for infrastructure - General fire detection (barracks, cavern) - Sniffer system (smoke detection above the.
23MAY07Xvc - Calo ECS Working Group1 Calo FSM hierarchy and structure Xvc.
1 Calorimeter LED & LV - HV control systems LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Outline Status of the calorimeters LV & MV power supplies.
Operation of CSC DCS Ryan Carroll Carnegie Mellon 29-Sept-2009.
K. Grogg, M. Weinberg, M. Grothe
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Presentation transcript:

Calo Piquet Training Session - Xvc1 DCS and DSS Cuvée 2015 – RUN2 Xavier Vilasís-Cardona

Calo Piquet Training Session - Xvc2 DCS vs DSS DCS –Detector Control System –NON-RACK POWER SUPPLIES Low Voltage LV –VFEs –LED and HV boards Medium Voltage MV –AGILENT –Temperatures (PS and SPD) DSS –Detector SAFETY SYSTEM ‘If I go off, I cut the power’

Calo Piquet Training Session - Xvc3 DCS – How to get there From the top detector DEN Click to go down into the ECAL DCS

Two types of power supplies involved LV – Marathon –They are the same type of the DAI Power Supplies –See Patrick’s talk for details –RCM’s + Power Supplies MV – For HV and TFC status bit –Agilents Calo Piquet Training Session - Xvc4

Calo Piquet Training Session - Xvc5 Where are the AGILENTS ? Rack D3B04 SystemNameIP addressPosition HCAL four units PS (100V, 30V,100V, 30V for A and C sides);hcagil01.lbdaq.cern.ch D3B04F45 ECAL four units PS (100V, 30V,100V, 30V for A and C sides);ecagil01.lbdaq.cern.ch D3B04F43 PS/SPD one unit PS (150V for side A);psagil01.lbdaq.cern.ch D3B04F41 PS/SPD one unit PS (150V for side C);psagil02.lbdaq.cern.ch D3B04F39 PS/SPD two units PS (18V, 18V for side A and C);psagil03.lbdaq.cern.ch D3B04F37 CA status board +5 Vpsagil04.lbdaq.cern.ch D3B04F47

Calo Piquet Training Session - Xvc6 Important THE AGILENTS (MV) SHOULD NOT BE ON WHEN THE LOW VOLTAGE (LV) IS OFF or in ERROR In principle, this is protected by hardware and software, and the system logics but just check.

DCS structure XCAL Calo Piquet Training Session - Xvc7

DCS structre PS / SPD Calo Piquet Training Session - Xvc8

FSM logics protection A simple protection system is implemented in the FSM logics for some subsystems LV and MV switch on and off in the correct order. SPD VFE power on and off is also protected by FSM logics On PS and SPD when temperatures go to error, VFE power supplies are cut off Calo Piquet Training Session - Xvc9

Calo Piquet Training Session - Xvc10 Power Supplies AGILENTS = Middle Voltage Low Voltage Click right mouse button and say ‘view’

Calo Piquet Training Session - Xvc11 MV - AGILENTS Click GO to 2 Click Go to

Calo Piquet Training Session - Xvc12 Switch ON and OFF COMMANDS SWITCH_ON SWITCH_OFF Click here to get the commands State moves from READY To NOT_READY

Calo Piquet Training Session - Xvc13 LV - MARATONS Double Click GO to 2 Double Click Go to 3

Calo Piquet Training Session - Xvc14 PS VFE TEMPERATURE Super Module information - Click

Calo Piquet Training Session - Xvc15 More VFE Temperature Second TAB Safe Temperature limit Hot, but not serious About to improve

More on Temperatures Similar panels exist for SPD temperatures. See Joan presentation. SPD temperatures are the probe for VFE power supply problems. If all SPD temperatures from one side are in alarm, probably the VFE maraton is in trouble: call EXPERTs. SPD temperatures are read from SPECS –Only read if DAQ is configured PS temperatures are read from CAN bus –Read independently of DAQ Calo Piquet Training Session - Xvc16

Monitoring on the Calo Screens A summary of the calo DCS information can be displayed on the control room Screens –HV_TOP (Anatoli) –PS Temperatures –SPD Temperatures We will also include information from the RACKS –Temperature on the racks –Status of the Power Supplies and Turbines –Rack Monitoring project Calo Piquet Training Session - Xvc17

CALO HV TOP Panel summarises information on HV and DCS Prepared by A.Konoplyanikov Calo Piquet Training Session - Xvc18 View Here Usually here

Calo HV TOP Calo Piquet Training Session - Xvc19 LV information MV information

Calo Piquet Training Session - Xvc20 DSS SAFETY SYSTEM –Runs in an independent system PLCs DON’T PANIC DSS essential behaviour –Some sensor goes wrong Smoke, temperature, cooling Ours or others… –Power is cut somewhere One side Somewhere else

DSS and the Calorimeter DSS can be triggered in the calorimeter by –Smoke or water in platform racks –Temperature too high in PS or SPD VFE Well above DCS alarms –PS and SPD VFE cooling system stop If cooling stops, the DSS alarm is not triggered immediately but a warning is sent (SMS) DSS cut off takes place 30 minutes later. Calorimeter Piquet should be warned The system can be shut down manually by ECS Calo Piquet Training Session - Xvc21

Calo Piquet Training Session - Xvc22 What to do if DSS goes off Don’t panic Say your favourite four letter word A DSS piquet should appear Find out where the current was cut off and why. If everything is ok for us –Follow the POWER CUT PROCEDURE

Two words on power cuts In case of power cut –Wait for control PCs to be ON –If the network is not stable FSMs and project switching on may be difficult. –Recall projects start automatically –Switch ON DAI first (if not centrally done) –Switch ON DCS from the top of CALO –Remember CALO_UI_fwSystemOverview.sh –Remember LBECSINFO_UI_FieldbusMonitor.sh Calo Piquet Training Session - Xvc23

Calo Piquet Training Session - Xvc24 If sth was wrong… If DSS alarm was caused by some CALO problem –And it is not a fake alarm A sensor went mad Call EXPERTS