LHCb production experience with Geant4 LCG Applications Area Meeting October 20 2004 F.Ranjard/ CERN.

Slides:



Advertisements
Similar presentations
Warped extra dimensions lepton signatures in ATLAS O.K. Baker Hampton University (K. McFarlane, V. Vassilakopoulos, T. Shin) SUSY05.
Advertisements

25/03/2003Simulation Application for the LHCb Experiment CHEP March 2003 Presented by: W. Pokorski / CERN Authors: I. Belyaev, Ph. Charpentier,
14 User Documents and Examples I SLAC Geant4 Tutorial 3 November 2009 Dennis Wright Geant4 V9.2.p02.
Highlights of latest developments ESA/ESTEC Makoto Asai (SLAC)
K.Harrison CERN, 23rd October 2002 HOW TO COMMISSION A NEW CENTRE FOR LHCb PRODUCTION - Overview of LHCb distributed production system - Configuration.
Gauss: Generator Status Patrick Robbe, LAL Orsay, 6 Oct 2009.
17-19 Oct, 2007Geant4 Japan Oct, 2007Geant4 Japan Oct, 2007Geant4 Japan 2007 Geant4 Japan.
Large scale data flow in local and GRID environment V.Kolosov, I.Korolko, S.Makarychev ITEP Moscow.
Introduction to the workshop LHCb Generators Tuning Mini Workshop Bucharest 22 nd & 23 rd November 2012 LHCb Generators Tuning Mini Workshop Bucharest.
Evaluation of G4 Releases in CMS (Sub-detector Studies) Software used Electrons in Tracker Photons in the Electromagnetic Calorimeter Pions in the Calorimeter.
Photon reconstruction and calorimeter software Mikhail Prokudin.
Status of MC Simulation Huaimin Liu BESIII Collaboration meeting IHEP, Beijing, Jan. 12, 2006.
Progress with the Development of Energy Flow Algorithms at Argonne José Repond for Steve Kuhlmann and Steve Magill Argonne National Laboratory Linear Collider.
User Documents and Examples I Sébastien Incerti Slides thanks to Dennis Wrigth, SLAC.
Geant4 Acceptance Suite for Key Observables CHEP06, T.I.F.R. Mumbai, February 2006 J. Apostolakis, I. MacLaren, J. Apostolakis, I. MacLaren, P. Mendez.
IFluka : a C++ interface between Fairroot and Fluka Motivations Design The CBM case: –Geometry implementation –Settings for radiation studies –Global diagnosis.
Implementing a dual readout calorimeter in SLIC and testing Geant4 Physics Hans Wenzel Fermilab Friday, 2 nd October 2009 ALCPG 2009.
1 A ROOT Tool for 3D Event Visualization in ATLAS Calorimeters Luciano Andrade José de Seixas Federal University of Rio de Janeiro/COPPE.
1 OO Implementation for the LHCb Rich Niko Neufeld Dietrich Liko.
CALORIMETER system for the CBM detector Ivan Korolko (ITEP Moscow) CBM Collaboration meeting, October 2004.
Event Generator Event Generators Information needed Event Generator Information Event Kinematic Information Generated Event Structure – generated particles.
BESIII MC Release notes & planned development Dengzy, Hem, Liuhm, Youzy, Yuany Nov. 23, 2005.
Analysis of the ROOT Persistence I/O Memory Footprint in LHCb Ivan Valenčík Supervisor Markus Frank 19 th September 2012.
G.Corti, P.Robbe LHCb Software Week - 19 June 2009 FSR in Gauss: Generator’s statistics - What type of object is going in the FSR ? - How are the objects.
R.T. Jones, Newport News, May The GlueX Simulation Framework GEANT4 Tutorial Workshop Newport News, May 22-26, 2006 R.T. Jones, UConn Monte Carlo.
Hadronic Interaction Studies for LHCb Nigel Watson/Birmingham [Thanks to Silvia M., Jeroen v T.]
RICH SIMULATION USING GEANT4 S.EASO, RAL OBJECTIVES OF THE SIMULATION. CURRENT STATUS AND PLANS. INTEGRATION WITH LHCb SOFTWARE. SUMMARY.
A. Chukanov, S. Dmitrievsky, Yu. Gornushkin, D. Naumov JINR, Dubna Opera collaboration meeting 9 th March 2011, Nagoya.
Detector Monte-Carlo ● Goal: Develop software tools to: – Model detector performance – Study background issues – Calculate event rates – Determine feasibility.
The CMS Simulation Software Julia Yarba, Fermilab on behalf of CMS Collaboration 22 m long, 15 m in diameter Over a million geometrical volumes Many complex.
RICH upgrade simulation: updates S.Easo RICH upgrade-mechanics meeting 1.
1 Performance of a Magnetised Scintillating Detector for a Neutrino Factory Scoping Study Meeting Rutherford Appleton Lab Tuesday 25 th April 2006 M. Ellis.
Simulation Commissioning, Validation, Data Quality A brain dump to prompt discussion Many points applicable to any of LHCb software but some simulation.
CBM ECAL simulation status Prokudin Mikhail ITEP.
CMS H4 ECAL testbeam data comparison with simulation F.Cossutti a), B. Heltsey b), P. Meridiani c), C. Rovelli c) a) INFN Trieste b) Cornell University.
M. Ellis - MICE Collaboration Meeting - Thursday 28th October Sci-Fi Tracker Performance Software Status –RF background simulation –Beam simulation.
Large scale data flow in local and GRID environment Viktor Kolosov (ITEP Moscow) Ivan Korolko (ITEP Moscow)
LHCb report to LHCC and C-RSG Philippe Charpentier CERN on behalf of LHCb.
Event Generation of Tim Barklow SLAC October 21, 2010.
1 Performance of a Magnetised Scintillating Detector for a Neutrino Factory Scoping Study Meeting U.C. Irvine Monday 21 st August 2006 M. Ellis & A. Bross.
1 Giuseppe G. Daquino 26 th January 2005 SoFTware Development for Experiments Group Physics Department, CERN Background radiation studies using Geant4.
ST Occupancies (revisited) M. Needham EPFL. Introduction Occupancies matter Date rates/sizes In particular was data size on links from Tell1 to farm estimated.
1 Study of Data from the GLAST Balloon Prototype Based on a Geant4 Simulator Tsunefumi Mizuno February 22, Geant4 Work Shop The GLAST Satellite.
Experiences on Grid production for Geant4 EGEE User Forum, CERN, 1st March 2006 P. Mendez Lorenzo, A. Ribon CERN CERN.
G.Corti LHCb Software Week - 6 October 2009 Gauss Status MC09 addition over the summer and what is still expected development for first data generators.
John Marshall, 1 John Marshall, University of Cambridge LCD WG6 Meeting, February
MAUS Status A. Dobbs CM43 29 th October Contents MAUS Overview Infrastructure Geometry and CDB Detector Updates CKOV EMR KL TOF Tracker Global Tracking.
Monthly video-conference, 18/12/2003 P.Hristov1 Preparation for physics data challenge'04 P.Hristov Alice monthly off-line video-conference December 18,
LHCb Simulation LHCC Computing Manpower Review 3 September 2003 F.Ranjard / CERN.
HEP usability A collection of topics impacting the usability of Geant4 by HEP experiment Time performance and tuning Choosing settings and parameters Robustness,
The Generator Phase in Gauss
GAUSS GiGa (G4 Interface for Gaudi Geant 4
EvtGen Miniworkshop, Patrick Robbe LAL Orsay, 21 Jan 2005
Patrick Robbe, LAL Orsay, 13 May 2004
The LHCb Software and Computing NSS/IEEE workshop Ph. Charpentier, CERN B00le.
LHCb Software Tutorial
of experiment simulations
(CMS GEANT4 simulation)
Testing Geant4 with a simplified calorimeter setup
GAUSS Work plan Software Week 6 March 2002 F.Ranjard / CERN.
Pedro Arce (CERN/CIEMAT)
Use of Geant4 in experiment interactive frameworks AliRoot
Summary of dE/dx studies in silicon and MS in muon system
Geant4 in HARP V.Ivanchenko For the HARP Collaboration
Simulation Project Structure and tasks
ATLAS DC2 & Continuous production
Use of GEANT4 in CMS The OSCAR Project
Agenda SICb Session Status of SICb software migration F.Ranjard
MC production plans : 1/08/ /03/2001
Physics event timing Use Pythia to generate hadronic decays at 125 GeV
Presentation transcript:

LHCb production experience with Geant4 LCG Applications Area Meeting October F.Ranjard/ CERN

Gauss 20 October 2004LCG Application Area meeting 2 Outline  DC04 goals  Gauss validation  Gauss in production – the DC04 experience  Summary

Gauss 20 October 2004LCG Application Area meeting 3 DC04 goals  LHCb data challenge (DC04) started 3 rd of May 2004  Physics studies  robustness test of the LHCb software and production system  incorporation of LCG application area software  use of LCG resources  new Gauss simulation in production environment

Gauss 20 October 2004LCG Application Area meeting 4 Validation of Gauss as THE simulation application  Gauss has replaced the Geant3 based simulation for this year massive production  Requirements for Gauss to be fully operational:  complete all detectors simulated all information needed in later processing provided  stable low crash rate, reasonable CPU time  validation of physics comparison with the Geant 3 simulation ( validation as replacement ) comparison with test beam data ( tuning of physics setting, ex. RICH ) development phase Gauss (C++, Geant4) validation phase operational phase today retire SICbMC (Fortran, Geant3)

Gauss 20 October 2004LCG Application Area meeting 5 Gauss benchmarking with Geant4 6.1 Memory usage ~220 MB and stable (no significant memory leaks) Virtual Memory for a job Event # kB CPU time performance ( 2.4GHz PIV, gcc 3.2 –O2 ) minimum bias ~ 22 s/event BBbar inclusive ~ 65 s/event

Gauss 20 October 2004LCG Application Area meeting 6 Choice of tracking cuts  Introduce tracking cuts on E kin of particles (special stepping actions)  Study the relation between tracking cuts and production cuts  Investigate production cuts per region Processing time Energy threshold below which the particle is not tracked. Value Used Collect only energy deposited in scintillator plates by charged particles Effect of cut value for ECAL with 30 GeV electron particle gun visible energy

Gauss 20 October 2004LCG Application Area meeting 7 Gauss in production  Gauss used in DC04  Pythia for pp-collision generation  EvtGen v5r0 ( LHCb modification from  – 00 – 11 – 07 ) for B decays  Geant4 6.1 for detector simulation  three versions of Gauss - fix bugs identified in production in conversion of MCtruth particle getting stuck during tracking

Gauss 20 October 2004LCG Application Area meeting 8 Gauss in production (May – August) LCG in action /day LCG paused Phase 1 Completed /day LCG restarted 186 M Produced Events Still producing data ~ 210 M up to now Data produced in ~ 60 different sites In each job 3 sets of 500 events produced with Gauss for spill-over

Gauss 20 October 2004LCG Application Area meeting 9 Crash Analysis  On jobs run between 16 August and 19 October  A job is made of several steps 3 (signal + 2 minbias) Gauss (detector simulation) – 500 events or 4 (b-incl + 3 minbias) Gauss – 500 and 3*300 events  Followed by digitization and reconstruction  529 jobs crashed in one of the Gauss runs  58 (+7) stopped before (during) the 1 st event due to various “system” reasons  85 stopped in the event generator step  278 stopped in the Geant4 step which includes GiGa interface  2 in Hadronic processes  32 for unknown reason (Gaudi or “system” reasons)  No output  Crashes occurred in step 1: 425, step 2: 33, step 3: 29, step 4: 13  Crashes in Geant4-GiGa : ~50% of all the crashes but less than 1 per mil of the runs

Gauss 20 October 2004LCG Application Area meeting 10 Debugging Gauss in production  More than 50% of the crashes are independent of Geant4  For the 50% occuring in the Geant4 step  Detailed information available when a problem occurs for foreseen reason is very useful As it is done in Hadronic processes  Detailed printout for normal situation  very important when developing or adopting a new Geant4 version  should be under the control of the user to not clutter log files during production

Gauss 20 October 2004LCG Application Area meeting 11 Summary  Gauss, the Geant4 based simulation application has been successfully validated as replacement of the LHCb Geant3 simulation application  It has been used ( and continues to ) in DC04 to produce over 210M events in ~ runs with a failure rate in Geant4 < 1 per mil of the runs  Data produced with Gauss in DC04 will be intensively scrutinized in the coming months  Introduce more realism and details in Gauss understand better both the simulation and test beam data  Investigate alternative, new paths to those adopted currently in Gauss delta rays production production/tracking cuts per region investigation of tracking in magnetic field (parameters, regions)