EECP External Communications ERCOT Governmental Relations & Communications COPS June 27, 2006.

Slides:



Advertisements
Similar presentations
1 Power Blackout of 2003: Lessons Learned Verizon Technical Support Services-Power Systems Charlie Romano-Director
Advertisements

Operating Reserves --- Again A Discussion Primer
Texas Forest Service All-Hazard Incident Management – 17 Type 3 Incident Management Teams (IMT) working under the direction of the Texas Forest Service.
Presentation Phase I of the Outage Inquiry Board of Commissioners of Public Utilities March 30, 2015.
February 25, 2011 Demand Side Working Group EILS Update Mark Patterson ERCOT, Manager Demand Integration.
Recent ERCOT Events Lessons Learned
ERCOT Emergency Load Response Sam Jones Paul Wattles Steve Krein PUC Demand Response Workshop Sept. 15, 2006.
Enhancing Interruptible Rates Through MISO Demand Response: WIEG Annual Meeting June 19, 2008 Presented by: Kavita Maini, Principal KM Energy Consulting,
November  David Dzierski office cellular CenterPoint Energy 1111 Louisiana St.
Forecasts and Assessments Presented to the Independent Power Producers’ Society of Ontario Pat Doran, Supervising Technical Officer Independent Electricity.
The Status Of The Electric Grid In ERCOT The Electric Reliability Council Of Texas Sam R. Jones, P.E. ERCOT – Retired As a retiree of ERCOT this presentation.
Operational Communications and Coordination: Real World Experiences
Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.
Floyd Trefny Director of Product Development Future of Demand Response In ERCOT A Presentation to the Workshop – September 15, 2006 Project Number
Intermittent Resources and Demand Response Integration 2007–2016 Long-Term Reliability Assessment Workshop Bill Bojorquez VP, System Planning August 16,
Hurricane Rita. 2 ERCOT Preparation ERCOT started alerts to QSEs and TOs on 9/21 Did a site failover of EMMS system Austin Taylor Procured satellite voice.
CCET as a Forum to Help Resolve Interoperability Issues Grid-Interop Stakeholders Coordination Panel Nov 11-13, 2008 Atlanta, GA Milton Holloway, Ph.D.
Phase One Hearing - Utility Presentation Presentation to Board of Commissioners of Public Utilities March 30,
1 Energy Assurance Guidelines for States Miles Keogh, NARUC David Terry, Stateline Energy April 2007.
H.B. “Trip” Doggett President and Chief Executive Officer Review of February 2, 2011 Energy Emergency Alert (EEA) Event Special Board of Directors Meeting.
NSRS deployment April John Adams ROS – May 12, 2005.
1 New England Demand Response Resources: Present Observations and Future Challenges Henry Yoshimura Demand Resources Department ISO New England, Inc. Holyoke,
Joe Polidoro, Sr. Engineer PJM Interconnection, LLC Grid of the Future: Integrating Load Response into the Markets.
1 Welcome to Load Participation Orientation Elev MenWomen Phones Info Presentation and other Load Participation information will be posted at:
LAREDO PLANT RMR EXIT STRATEGY Presentation to Board of Directors March 16, 2004 Transmission Services Operations.
Demand Response Workshop September 15, Definitions are important Demand response –“Changes in electricity usage by end-use customers from their.
Texas Regional Collaboratives for Excellence in Science and Mathematics Teaching TASA MidwinterConference January 29, 2007 Austin, TX Dynamic Partnerships.
ISO Outlook Summer 2005 and Beyond Senate Energy, Utilities and Communications Committee February 22, 2005 Jim Detmers Vice President of Grid Operations.
Long Term Solution Task Force TAC Report 5/5/07 Presented by: Bob Wittmeyer - LTSTF Co-Chair.
Florida’s Electric Capacity and Fuel Needs Presentation by: James Dean Florida Public Service Commission to the: House Utilities and Telecommunications.
ERCOT Emergency Interruptible Load Program Kent Saathoff Ken Donohoo Paul Wattles Mark Patterson Steve Krein PUC Demand Response Workshop Oct. 2, 2006.
ERCOT Emergency Interruptible Load Program Paul Wattles Steve Krein WMS Oct. 13, 2006.
Transmission Outage Process April Purpose In compliance with the Protocols and the Electric Reliability Council of Texas (ERCOT) Operating Guides,
© 2006 Avaya Inc. All rights reserved. Events Processing Use Case – A Major Consumer Appliance Manufacturer Kal Krishnan Director, Software Development.
PJM© Demand Response in PJM 2009 NASUCA Mid-Year Meeting June 30, 2009 Boston, MA Panel: Price Responsive Demand – A Long-Term Bargain.
Demand Response: What It Is and Why It’s Important 2007 APPA National Conference San Antonio, Texas June 26, :00 a.m. to Noon Glenn M. Wilson Director.
Electric Reliability Council of Texas (ERCOT) A Success Story… In Progress Ingmar Sterzing United States Association of Energy Economics (USAEE) Pittsburgh.
ERCOT Emergency Interruptible Load Service Customer & Stakeholder Workshops July 2007.
Emergency Demand Response Concept Overview and Examples Presented to: ERCOT December 3, 2004 Presented by: Neenan Associates.
Operations Report Kent Saathoff System Operations ERCOT.
Communication of unplanned retail system outages / issues Red Flag / System Generated Notices Ted Hailu ERCOT Client Services RMS Meeting – June
TRANSMISSION CONSTRAINTS KENNETH A. DONOHOO, P.E. Manager of System Planning, Technical Operations
Emergency and Other Event Communications ERCOT Board of Directors Richard Gruber, Director of Market Services Paul Wattles, Manager, Governmental Relations.
CALIFORNIA ENERGY COMMISSION Workshop on the Staff Draft 2006 Summer Outlook Report December 8, 2005 Hearing Room B.
Demand Response Programs: An Emerging Resource for Competitive Electricity Markets Charles Goldman (510) E. O. Lawrence Berkeley.
Business Case NPRR 351 Floyd Trefny Amtec Consulting Brenda Crockett Champion Energy Services.
PRR 705 ERCOT Emergency Interruptible Load Service PRS January 22, 2007.
ERCOT Public 1 Project Panel 1 Dan Woodfin Director, System Operations August 15, 2014.
Planning for Texas’ Energy Future Select Committee on Electric Generation Capacity and Environmental Effects Bob Kahn President & CEO February 6, 2008.
Operations Update ERCOT Board Meeting March 18, 2003.
1 TAC Report to the ERCOT Board November 14, 2006.
Emergency Interruptible Load Service Paul Wattles ROS Subgroup Feb. 7, 2006.
Operations Update Kent Saathoff TAC Meeting March 6, 2003.
H.B. “Trip” Doggett President and Chief Executive Officer Review of February 2, 2011 Energy Emergency Alert (EEA) Event Emergency Event Coordination Workshop.
Energy Emergency Alert (EEA) UPDATE F EBRUARY 8, 2011.
1 EEA Workshop 3 April 2, /3/2015For the purpose of discussion only.
©2003 PJM 1 Presentation to: Maryland Public Service Commission May 16, 2003.
Adopt Water Supply Alert Resolution Water Planning and Stewardship Committee 8-9 June 9, 2008.
Long-term Solution Task Force Ellis Rankin & Bob Wittmeyer Co-Chairs.
Integrity Innovation Accountability Commitment to Excellence Teamwork Values Item 4G Ordinance No. 662-C; Revise the City of Southlake’s Drought Contingency.
OOM During Alerts ERCOT TAC June 7, 2007 Dan Jones Potomac Economics.
ERCOT Market Education Market Role in Emergency Operations OTS 2016.
Long Term Solution Task Force TAC Report 5/5/07 Presented by: Bob Wittmeyer - LTSTF Co-Chair.
ROS Presentation: Dynamic Scheduling and EEA Austin, TX September 10, 2009 Steve Isser Vice President and General Counsel Good Company Associates
UFLS Survey Explanation
Overview of the NYISO Demand Response Programs
Hurricane Rita.
Pilot Project Concept 30-Minute Emergency Response Service (ERS)
Overview of New Control Room Desk
Intermittent Resources and Demand Response Integration 2007–2016 Long-Term Reliability Assessment Workshop Bill Bojorquez VP, System Planning August.
Presentation transcript:

EECP External Communications ERCOT Governmental Relations & Communications COPS June 27, 2006

2 EECP Communications June 27, 2006 ERCOT External Communications: Pre-EECP and EECP ERCOT Event Stage ERCOT action/ communicationTriggering event 1. Early advisory Conditions are being watched closely Alert for Forecast of Insufficient Capacity or other events, after consultation with PUC 2. Grid condition advisory Capacity Reserves are actually at minimum levels Deployment of non-spin reserves to maintain capacity sufficiency 3. EECP Step 1 All available generation dispatchedCapacity Reserves below minimum levels 4. EECP Step 2 Interruptible loads (LaaRs) deployed Difficulty maintaining frequency at 60 Hz 5. EECP Step 3 Media appeal for conservation Continued frequency decay or if EECP Step 2 declared and peak demand has not yet occurred 6. EECP Step 4 Rotating firm load shedContinued frequency decay below 59.8 Hz 7. Cancellation of EECP Step 4 All firm load restoredFrequency restoration 8. Cancellation of EECP Step 2 Interruptible loads restoredFrequency restoration 9. Cancellation of EECP Grid conditions normal

3 EECP Communications June 27, 2006 Communications: Pre-EECP and EECP Stage 5 (EECP Step 3) & Updates PUC --Commissioners --Exec. Director --Media relations --Infrastructure/Reliability --Govt. Relations Legislative Leadership Governor’s Office SOC Hotline All of the above PLUS….. News media All legislators All market participants & other interested parties Activate ERCOT.com web page for public updates Market Participants -- Subscriber list screened by ERCOT ALL STAGES ERCOT Officers, Board, & Client Services

4 EECP Communications June 27, 2006 Communications: Pre-EECP and EECP Messages must be: –Consistent with operational instructions and grid conditions –In plain English –In proper context Early notices are not intended for news media distribution –Subject to misinterpretation –Need to ensure media respond when it really counts Templates (stock messages) –Currently in draft form, under review at PUC –Subject to editing to fit the particular event

5 EECP Communications June 27, 2006 EXAMPLE: Stage 1, First Notice (DRAFT) ELECTRICITY ALERT E A R L Y A D V I S O R Y This is an early advisory only. Emergency conditions are NOT in effect at this time. This message is not intended for news media distribution. The Electric Reliability Council of Texas (ERCOT) is projecting a potential shortfall in reserve electric generation capacity for the __ p.m. hour today. If capacity reserves fall below required levels, emergency actions may be required. ERCOT is watching grid conditions closely. ERCOT has notified all power plant operators of the situation and has asked them to consider voluntary actions such as bringing additional generation capacity online for this afternoon in light of this information. If generating capacity reserves drop below the required minimum levels, ERCOT will implement the Emergency Electric Curtailment Plan (EECP). The EECP is a series of steps designed to avoid a region-wide outage. This early notice is being sent to alert you to the possibility of the need for stronger action. Again, emergency measures have NOT been instituted at this time. ERCOT is watching the situation closely and will keep you apprised of further developments. ###

6 EECP Communications June 27, 2006 EXAMPLE: Media Advisory (public appeal for conservation) EECP Step 3 - Media Advisory M E D I A A D V I S O R Y ELECTRIC RELIABILITY COUNCIL OF TEXAS CONTACTS: ERCOT MEDIA HOTLINE: INFORMATION UPDATES: Dottie Roark, ; CELL Paul Wattles, ; CELL Emergency grid conditions ARE in effect at this time; ERCOT issues appeal to public for electricity conservation WHAT: The Electric Reliability Council of Texas (ERCOT) is requesting all electricity customers in the ERCOT region immediately reduce their use of electricity to the lowest level possible. Voluntary conservation is critically needed to avoid rotating outages in the region. WHY: Insufficient generation capacity to serve the public’s demand for electricity. WHERE: The ERCOT region covers most of Texas, including Houston, Dallas, Fort Worth, San Antonio, Austin, Corpus Christi, Abilene and the Rio Grande Valley. It does not include the El Paso area, the Texas Panhandle, Northeast Texas (including Longview, Marshall and Texarkana) and Southeast Texas (including Beaumont and Port Arthur). HOW CAN THE PUBLIC HELP? Consumers can help maintain electric service to the ERCOT Region by limiting electricity use until further notice, including these steps:  Adjust thermostat to 78° or higher  Avoid using electric lighting, appliances or equipment unless necessary for health or safety. Do not use washers, dryers, dishwashers, pool pumps or hair dryers until the emergency alert has expired.  Avoid opening refrigerators and freezers more than necessary.  Businesses should minimize the use of electric lighting and use of electricity-consuming equipment as much as possible.  Large consumers of electricity should consider shutting down or reducing non-essential production processes. WHAT HAPPENS NEXT? ERCOT will advise the news media when the emergency alert has expired. If conditions do not improve ERCOT may ask transmission operators in the ERCOT region to begin rotating outages in the region. If this becomes necessary, information updates will be available at ***