Global Design Effort 1 S0 Status High-Gradient cavities Lutz Lilje DESY supplement by H. Hayano 04Sep2008 EC

Slides:



Advertisements
Similar presentations
New Optical Inspection Results at JLab An in-depth update since Chicago meeting ILC08 (Highlights reported in US Regional Talk by Mark Champion) Rong-Li.
Advertisements

T. Saeki (KEK) 15 May 2014 AWLC2014 at FNAL
6/Nov/2012 TTC Meeting 1 Improvement of cavity performance by T-mapping/X-ray-mapping, optical inspection and local grinding Kirk.
Superconducting rf test facility STF Mechanical grinding development Ken Watanabe ( KEK ) ILWS08 in Chicago 17-Nov-08.
KEK cavity status, March 2011 H. Hayano, ALCPG11, WG3, Eugene.
Stain appeared after EP acid renewal Field emission at low gradient happened on MHI-06, MHI-07, in VT. Kyoto-camera found brown stain trace in beam pipes,
Recent Surface Studies in KEK-STF
ILC PM Meeting S0 Webex Global Design Effort 1 S0/S1 Next Steps Lutz Lilje GDE.
ILC S0 Strategy Proposal FNAL GDE status 報告会 4月28日: (空胴表面プロセス、空胴システム)
ILC08 Chicago Global Design Effort 1 Discussion of Optical Inspection and Temperature mapping Results Several new inspection and mapping systems.
Rong-Li Geng Toward Higher Gradient and Q 0 LCWS2013, U. of TokyoNov , 2013, R.L. Geng1.
Jim Kerby, Fermilab for Rongli Geng and the S0 Cavity Team 23 May 2010 Current Status of SCRF Cavity Development SCRF Cavity Technology and Industrialization.
SCRF WebEx Meeting May 14, Report from PMs and APMs 2.Technical Design Phase R&D plan (rev. 3) 1.High Gradient R&D guideline 2.S1-global preparation.
Cavity status; recent KEK activities : Hayano (1) STF CM-1 cavities are; MHI-014: 3-rd VT:36MV/m (finished) MHI-015: 3-rd VT: > 18.4MV/m.
TILC09 AAP Review Lutz Lilje Global Design Effort 1 Cavity Gradient R&D.
Americas S0 Plan in USA Shekhar Mishra Fermilab/GDE US Main Linac Cavity and Cryomodule WBS.
Cavity Productions at DESY DESY -MPY- FNAL Overview on the cavity productions Review of cavity performance Some conclusions.
Summary of Main Linac SCRF-part H. Hayano, ILC08 at UIC.
Detail discussion of S1 Global at STF H. Hayano (KEK) GDE Mar 3-6, 2008.
STF EP, VT commissioning by FNAL AES001 H. Hayano, KEK
Superconducting rf test facility STF 1 Optical Inspection update at KEK Ken Watanabe ( KEK ) ILWS08 in Chicago 17-Nov-08.
Field emission issue and strategy to improve H. Hayano.
Akira Yamamoto Project Manager, SCRF To be presented, April 19, 2009 AAP Review – SCRF Summary and Discussion AAP-SCRF-Summary.
R.L. Geng, KEK September 9, 2010 Global Design Effort 1 Near Term ILC Gradient R&D R&D Specification and Standardization Gradient Gradient Yield/Scatter.
TILC09 / SCRF Session Update on S0 Work in the Americas Region Mark Champion, Fermilab With slides provided by: Zack Conway, Cornell Rongli Geng, Jefferson.
AAP Review on SCRF to be prepared Akira Yamamoto, Marc Ross, and Nick Walker ILC-GDE Project Managers To be presented at ILC-10, Beijing, March 26, 2010.
Parallel session summary ML/SCRF L. Lilje, H. Hayano, N. Ohuchi, S. Fukuda, C. Adolphsen (with help of Chris Nantista) TILC09,
Achievement of 41 MV/m Gradient by AES8 Rong-Li Geng Jefferson Lab ALCPG09, October 1, 2009.
Update on S0, S1 for ILC R&D H. Padamsee, Cornell For the S0/S1 Task Force.
R.L. Geng, 5/27-31,2013 ECFA LC2013, DESY 1 Update on Raising Q0 at Ultra-High Gradient via Large-Grain Niobium Material Rongli Geng Jefferson Lab ECFA.
ALCPG/GDE Meeting FNAL Global Design Effort 1 Cavity Work Packages Lutz Lilje GDE.
Americas Cavity Specification C.M. Ginsburg (Fermilab) On behalf of the Fermilab cavity crew October 20, 2010.
ILC Cavity Gradient R&D Plan Proposal for Release 5 Rongli Geng for ILC Cavity Group 2jun2010 ILC SCRF WebEx Meeting 6/2/20101ILC SCRF WebEx Meeting.
Superconducting rf test facility LCWS 2010 in Beijing, 28 Mar 2010, Ken Watanabe Replica-method and local grinding repair K. Watanabe (KEK) LCWS 2010 in.
TILC09 SCRF Session Global Design Effort 1 EU Status TILC09 SCRF Session Lutz Lilje DESY.
ILC Global Design Effort 1 ILC S0 Strategy Proposal FNAL
(1)[12~13/Dec/2009] Optical inspection (2)[14/Dec] frequency & field flatness measurement (3)[10/Mar/2010] pre-EP (5μm) (4)[11/Mar] EP1 (100μm) (5)[11/Mar]
E. KAKO (KEK) 2009' Oct. 26 ILC KEK Global Design Effort 1 Cavity Preparation for S1-Global Eiji Kako (KEK, Japan)
HiGrade-Kickoff DESY Global Design Effort 1 ILC-HiGrade WP6 High-Gradient cavities Lutz Lilje DESY.
10/1/09 R.L. Geng ALCPG09, Albuquerque, NM 1 Cavity R&D Status and Future Plans - with a partial summary of SRF2009 Rongli Geng Jefferson Lab.
Update on S0 Work in the Americas Region Mark Champion 17 June 2008.
KEK-STF Vertical Test and Diagnostics Brief History & Future Plan Vertical Test Facility Cavity Diagnostic System Example of MHI#7 Cavity Summary of T-mapping.
2 nd Workshop of the IHEP 1.3 GHz SRF R&D Project and 2nd IHEP-KEK 1.3 GHz SRF Meeting Opening Remark J. Gao December 2-3, 2009, IHEP, Beijing, China.
IHEP GHz 9-cell Cavity R&D Status and Plan The Third IHEP-KEK 1.3GHz SC Technology Collaboration Meeting Dec. 7-8, 2010, IHEP, Beijing GAO Jie,
Recent Results of Vertical Test for S1-Global Project at KEK-STF Y. Yamamoto, H. Hayano, E. Kako, S. Noguchi, H. Sakai, M. Satoh, T. Shishido, K. Umemori,
ILC Gradient R&D Rongli Geng Jefferson Lab ILC Main Linac WebEx Meeting July 28, 2010.
Summary of Results and Development of Online Monitor for T-mapping/X-ray-mapping in KEK-STF Y. Yamamoto, H. Hayano, E. Kako, S. Noguchi, M. Satoh, T. Shishido,
FNAL SRF Program: 1.3 GHz Camille M. Ginsburg (FNAL) Fermilab Accelerator Advisory Committee November 7-9, 2011.
Update on S0 Work in the Americas Region Camille Ginsburg (FNAL) 2 June 2009 Slides/Info from: Zack Conway (Cornell) Rongli Geng (JLab) Genfa Wu, Dmitri.
SRF Collaboration Shekhar Mishra Fermilab. Overview Charge: Does the laboratory make effective use of collaboration and existing SRF capabilities at other.
Start of S2 Milestone Work H. Padamsee. Intro At KEK S2 meeting we decided to make a list of milestones and eventually cost S2 activities I tried to start.
Plasma cleaning Laser re-melting technique at FANL M. Ge, G. Wu, J. Ruan, J. Ozelis, T. Nicol, D. Sergatskov, D. Hicks, L. Cooley Fermi National Accelerator.
Cornell Updates Commissioning of T-map for ILC single cell starts.
ILC10 Beijing Global Design Effort
Electropolishing of Dressed ILC 9-cell Cavity
Cavity Gradient R&D Status and Future Plans for TDP-2
STF Plan of gradient improvement
Inspection of STF Baseline cavity #5 and #6
for the FNAL/ANL, JLab, and Cornell cavity teams
Surface Analysis of the Quench Area Sample of Cavity Z111
S0 Status report from KEK
Jiyuan Zhai ( IHEP ) TTC Meeting, JLAB, 6 Nov 2012
Recent VT Results in the STF-2 cavities
Recent SCRF Activities in IHEP
Working Group 3 Summary TTC Meeting INFN Milan,March 3, 2011
WG3: Main Linac SCRF(cavity,cryomodule)
Highlights from EU Global Design Effort
Nick Walker (DESY) EU GDE Meeting Oxford
Cavity Degradation Experience at S1-Global
Cavity & Cavity Integration; recent KEK activities
Presentation transcript:

Global Design Effort 1 S0 Status High-Gradient cavities Lutz Lilje DESY supplement by H. Hayano 04Sep2008 EC

S0 Status Lutz Lilje DESY Global Design Effort 2 Where are we? America and Asia –New vendors and new preparation setups Europe –Previous production cycle –Current production cycle –Preliminary data

Reference; R. L. Geng et al., Proc. SRF2007, Beijing, WEP28 (2007). R. L. Geng et al., Proc. LINAC08, Victoria, Canada, in preparation. C. M. Ginsburg (FNAL), private communication. W. J. Ashmanskas and H. S. Padamsee, Proc. SRF2007, Beijing, WEP39 (2007).

4

KEK 9 cell cavity status TESLA shapeLL shape BL#1 in module 20.8MV/m, Q=1.8x10 10 MHI I9#1(LL#0) no coupler 29.3MV/m, Q=1.0x10 10 Kuroki BL#2 in module 29.4MV/m, Q=2.0x10 10 MHI I9#2(LL#1) module tested 19.0MV/m, Q=0.4x10 10 Kuroki BL#3 in module 20.5MV/m, Q=1.5x10 10 MHI I9#3(LL#2) 12.4MV/m, Q=1.2x10 10 Kuroki BL#4 in module 20.2MV/m, Q=2.0x10 10 MHI I9#4(LL#3) for tuner test --- Kuroki BL#5 under EP process --- MHI I9#5 no coupler, KEK, JLab tested 22.0MV/m, Q=2.0x10 10 (at KEK) 35.0MV/m, Q=0.8x10 10 (at JLab) Kuroki BL#6 under EP process --- MHI I9#6(PAL) no coupler, now in PAL --- Korea BL#7 under contract ---I9#7 new Ichiro 14.0MV/m, Q=0.7x10 10 Kuroki BL#8 under contract ---I9#8 new Ichiro --- Kuroki BL#9 under contract ---I9#9 new Ichiro under plan ---

S0 Status Lutz Lilje DESY Global Design Effort 6 KEK Data: TESLA-Type KEK TESLA-shape cavities

LL #5 S0 Studies at JLab Ultrasonic Cleaning with degreaser much effective to reduce Field Emission

S0 Status Lutz Lilje DESY Global Design Effort 8 DESY 4th: Field Emission Analysis

S0 Status Lutz Lilje DESY Global Design Effort 9 DESY 4th: Field Emission Analysis Optical Inspection done Z110 Z111

S0 Status Lutz Lilje DESY Global Design Effort 10

11 TESLA cavity Z110: #8 cell equator Quench location #8 equator 250 ~ 300 deg 1mm #8 equator, t=288 ~ 299 deg 10mm t=292 deg t=297 deg T-map data in test 2, 14.2 MV/m group of beads(?) with 10mm wide were observed. Similar beads group were also observed in several places. see following slides.

12 TESLA cavity Z111: #6 cell equator T-map data in test 2, 16.0 MV/m Quench location #6 equator 175 ~ 225 deg #6 equator, t=193 ~ 204 deg 1mm 1.5mm t=198 deg t=199 deg group of beads(?) with 1.5mm wide were observed.

deg #1 #2 #7 #6 #5 #4 #3 #9 #8 #1-#2i #2-#3i #3-#4i #4-#5i #5-#6i #6-#7i #7-#8i #8-#9i Group of spot Scratch Z110 summary 08/05/12 Iris equator T-map Heat spot cell equator Iris

deg #1 #2 #7 #6 #5 #4 #3 #9 #8 #1-#2i #2-#3i #3-#4i #4-#5i #5-#6i #6-#7i #7-#8i #8-#9i Group of spot Scratch Z111 summary 08/05/15 Iris equator T-map Heat spot cell equator Iris

S0 Status Lutz Lilje DESY Global Design Effort 15 DESY Current Production: Comparison of Final Treatment

S0 Status Lutz Lilje DESY Global Design Effort 16 DESY 4th: Field Emission Analysis

S0 Status Lutz Lilje DESY Global Design Effort 17 DESY Current Production: Comparison of Final Treatment Optical Inspection next

Camera Inspection Study of the STF TESLA-shape cavity #6 2008/3 : EBW parameter was decided by inspecting dumbbell EBW test samples. 2008/6 : STF TESLA-shape cavities #5 and #6 fabrication was completed. The first inspection by using Kyoto camera (After fabrication) 2008/7 : Pre-EP (5 um) and EP-1 (20 um), Total removed about 25 um. The second inspection by using Kyoto camera (After Pre-EP and EP-1) 2008/8 : 2 nd EP-1 (100 um), Total removed about 25 um um The third inspection by using Kyoto camera (After EP-1) Five cat's eyes pits were found at equator, and Three cat's eyes pits were found at iris at STF TESLA-shape #6 cavity. *STF Baseline #5 cavity will be inspection from Sept. 15

Measured line 1500 um 1mm STF Baseline #6 cavity : #2 cell equator, Z=286mm, t=198 deg

EP-1 ( um removed) After FabricationEP-1 (25 um removed) Comparison with each treatment #2 cell equator, Z=286mm, t=198 deg 12 3

1mm Measured line 1500 um STF Baseline #6 cavity : #6 cell equator, Z=746mm, t=283 deg

EP-1 ( um removed) After FabricationEP-1 (25 um removed) Comparison with each treatment #6 cell equator, Z=746mm, t=283 deg

S0 Status Lutz Lilje DESY Global Design Effort 23 Where are we? Production issues –Low-gradient cavities show defects found by temperature map and optical inspection –Training of manufacturers is mandatory Preparation issues –Have less impact currently Rinses developped within ILC R&D are successful –Ethanol (DESY), Ultrasound (JLab), Short EP (KEK) Clear path forward –Apply high resolution inspection systematically to improve weld quality –Apply optimum surface preparation e.g. ethanol rinse

Inspection Camera Status KEK: 2 camera fabricated proto-type: under upgrading production-type #1: 1 year loan to DESY ( now at DESY ) ( 1 camera for US was proposed to US-JPN budget supplement, however it was not approved. ) production company contact was published to key players. JLab: LDM system ( Questar telescope + mirror system ) was developed.

JLab LDM with T-map

JLab LDM Analysis 5/1/08, Rongli Geng JLab/KEK/FNAL S0 meeting ACCEL8 (32 MV/m) Equator 4 th Cell from FPC ACCEL8 (32MV/m) Equator 2 nd Cell from FPC

Guided Repair Development Status KEK: Local mechanical grinding Try to apply Ultrasonic tooling, micro-powder grinding, micro-powder buffing, to sample Nb plate. Insertion Mechanics is under design. JLab: Surface re-melting by EBW from outside. Try to apply re-melting to sample Nb plate with intentional pits.

Rinse Development Status DESY: Ethanol Rinse JLab: Degreaser with ultrasonic KEK: Ethanol Rinse, Degreaser, H 2 O 2 rise system are under developing. Sponge wipe is under evaluating by JLab collaboration. Mechanics is under design. Sample#1Sample#2 (sponge wipe applied) Lots of Nb-O particles (white) Significantly reduced Nb-O particles preliminary sample test wipe test for sample in single-cell

Global Design Effort Lutz Lilje ILC Global Design Effort 29 ILC S0 Feedback Loop Cavity Incoming QC Countermeasure (Guided Repair) Huge Irregularities eg. Scratches Feedback: Improve Specification/QC Standard Cavity Preparation Cycle Identify Irregularities eg. pits Standard Vertical Test Cavity Horizontal Tests or Module Assembly Additonal Processing Cycle Understand nature of high gradient limitation e.g. does minor EP move quench location Single Cells Witness Samples > XX MV/m < XX MV/m Standard Vertical Test Cavity

S0 Status H. Hayano Global Design Effort 30 Summary of S0 status 1. Cavity tests with optical inspection are come to standard procedure in KEK, JLab and DESY. 2. QC of EBW is recognized as important and inevitable. ( KEK has already started to instruct company. ) 3. Guided repair tools are under developing. 4. Rinse studies are under progressing.