NUCLOTRON CONTROL SYSTEM (NCS) V.Andreev, E.Frolov, A.Kirichenko, A.Kovalenko, B.Vasilishin, V.Volkov Laboratory of High Energies, JINR, Dubna.

Slides:



Advertisements
Similar presentations
JINRs PARTICIPATION IN SIS100 & SIS300 JINRs PARTICIPATION IN SIS100 & SIS300 5 th WORKSHOP on the SCIENTIFIC COOPERATION between GERMAN RESEARCH CENTERS.
Advertisements

ISIS Accelerator Division
Experimental set-up at E.S.R.F. L. Farvacque. 1/04/2004L. Farvacque - E.S.R.F.2 Experimental set-up Hardware Kickers Bpms Software Data acquisition processing.
“NUCLOTRON-M” - кеу element of NIKA A.D.Kovalenko.VHM Workshop, September 19, 2007, Dubna.
Damping ring K. Ohmi LC Layout Single tunnel Circumference 6.7 km Energy 5 GeV 2 km 35 km.
Test of LLRF at SPARC Marco Bellaveglia INFN – LNF Reporting for:
9 March 2005Edda Gschwendtner1 DAQ Terminology ISIS Terminology MICE Terminology Parameter Definitions.
PLANS JINR PARTICIPATION for JINR PARTICIPATION FAIR PROJECT: in the FAIR PROJECT: - ACCELERATOR TECHNOLOGY A.Kovalenko 103 session of the JINR Scientific.
Thomas Roser Snowmass 2001 June 30 - July 21, MW AGS proton driver (M.J. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas,
Development of new power supplies for J-PARC MR upgrade Yoshi Kurimoto (KEK) for J-PARC accelerator group.
PAMELA Contact Author: CONFORM is an RCUK-funded Basic Technology Programme PAMELA: Concepts Particle Accelerator for MEdicaL Applications K.Peach(JAI,
CERN 29 Jan 2008 Power Converters for Linac 4 - Carlos A. Martins1 Power Converters for Linac 4 2 Hz) Carlos A. MARTINS Accelerators and Beams (AB)
Storage Ring : Status, Issues and Plans C Johnstone, FNAL and G H Rees, RAL.
DLS Digital Controller Tony Dobbing Head of Power Supplies Group.
NCSX NCSX Preliminary Design Review ‒ October 7-9, 2003 G. Oliaro 1 G. Oliaro - WBS 5 Central Instrumentation/Data Acquisition and Controls Princeton Plasma.
New Nuclotron Beam Intensity Monitoring Subsystem V. Andreev, A. Butenko, A. Kirichenko, S. Romanov, G. Trubnikov, V. Volkov Veksler and Baldin Laboratory.
SNS Integrated Control System SNS Timing Master LA-UR Eric Bjorklund.
Preliminary design of SPPC RF system Jianping DAI 2015/09/11 The CEPC-SppC Study Group Meeting, Sept. 11~12, IHEP.
P. Spiller, SIS18upgrade, Peter Spiller GSI, Darmstadt Kick off Meeting - EU Construction DIRAC Phase SIS18 upgrade.
Digital Signal Processing and Generation for a DC Current Transformer for Particle Accelerators Silvia Zorzetti.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
1 Status of EMMA Shinji Machida CCLRC/RAL/ASTeC 23 April, ffag/machida_ ppt & pdf.
S. De Santis “Measurement of the Beam Longitudinal Profile in a Storage Ring by Non-Linear Laser Mixing” - BIW 2004 May, 5th Measurement of the Beam Longitudinal.
LLRF ILC GDE Meeting Feb.6,2007 Shin Michizono LLRF - Stability requirements and proposed llrf system - Typical rf perturbations - Achieved stability at.
EDM2001 Workshop May 14-15, 2001 AGS Intensity Upgrade (J.M. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas, S.Y. Zhang) Proton.
05/05/2004Cyrille Thomas DIAMOND Storage Ring Optical and X-ray Diagnostics.
Update of 3.2 km ILC DR design (DMC3) Dou Wang, Jie Gao, Gang Xu, Yiwei Wang (IHEP) IWLC2010 Monday 18 October - Friday 22 October 2010 Geneva, Switzerland.
Peter Spiller, DIRAC Kick-off meeting Peter Spiller Design Study Group DIRAC kick-off meeting SIS100.
Timing Requirements for Spallation Neutron Sources Timing system clock synchronized to the storage ring’s revolution frequency. –LANSCE: MHz.
Part III Commissioning. Proof of Principle FFAG (POP) study The world first proton FFAG –Commissioned in March –From 50 keV to 500 keV in 1ms. –Proof.
1 Proposal for a CESR Damping Ring Test Facility M. Palmer & D.Rubin November 8, 2005.
The ISIS Dual Harmonic Upgrade The Council for the Central Laboratory of the Research Councils Andy Seville Joint Accelerator WorkshopMarch 28th, 2006.
Fast feedback, studies and possible collaborations Alessandro Drago INFN-LNF ILCDR07 Damping Rings R&D Meeting 5-7 March 2007.
L4T Bending Power Converters: ‘ Implications of monitoring the current to 5% and 0.5%’ L4 BCC - 10 Nov 2011 David Nisbet TEEPC.
NICA control system, beam diagnostics V.Andreev, E.Gorbachev, A.Kirichenko, D. Monakhov, S. Romanov, G.Sedykh, T. Rukoyatkina, V.Volkov VBLHEP, JINR, Dubna.
PHYSICAL PROJECT OF BOOSTER FOR NICA ACCELERATOR COMPLEX Alexey Tuzikov, Nikolay Agapov, Andrey Butenko, Alexey Eliseev, Viktor Karpinsky, Hamlet Khodzhibagiyan,
A.Kovalenko 2 nd Lab Directors Meeting, Protvino, January 15/16, 2008 FAIR: JINR EoI.
Design and construction of Nuclotron-based Ion Collider fAcility (NICA) and Mixed Phase Detector (MPD) Design and construction of Nuclotron-based Ion Collider.
Automatic Machine Review Dec 2015 MAX IV Storage Rings Automation Pedro F. Tavares.
D&D Review 6 August PEP-II Minimal Maintenance State Upkeep Stan Ecklund (J. Seeman, S. DeBarger, D. Kharakh, M. Zurawel)
1 NICA Project Report of The Group I S.L.Bogomolov, A.V.Butenko, A.V.Efremov, E.D.Donets, I.N.Meshkov, V.A.Mikhailov, A.O.Sidorin, A.V.Smirnov, Round Table.
Information support of physical experiments on Nuclotron NEC’2003 Varna, Bulgaria V. Andreev, E. Frolov, B. Sveshnikov., B. Vasilishin., V. Volkov (JINR)
Future Circular Collider Study Kickoff Meeting CERN ERL TEST FACILITY STAGES AND OPTICS 12–15 February 2014, University of Geneva Alessandra Valloni.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Wojciech Jalmuzna, Technical University of Lodz, Department of Microelectronics and Computer.
Experience with Novosibirsk FEL Getmanov Yaroslav Budker INP, Russia Dec. 2012, Berlin, Germany Unwanted Beam Workshop.
Beam Diagnostics Seminar, Nov.05, 2009 Das Tune-Meßverfahren für das neue POSI am SIS-18 U. Rauch GSI - Strahldiagnose.
JLab Accelerator Controls Matt Bickley MaRIE discussion April 26, 2016.
RF Control Electronics for Linacs Overview of activities at Electronics Division, BARC RF control electronics for: 1.Super-conducting Heavy Ion Linacs.
RF acceleration and transverse damper systems
Challenges of Dual Harmonic RF Systems
The ISIS Dual Harmonic Upgrade
BEAM TRANSFER CHANNELS, INJECTION AND EXTRACTION SYSTEMS
J-PARC main ring lattice An overview
Status of the ASTRID2 facility
A.Sidorin, on behalf of the team PP PAC, JINR, Dubna, 16 January 2017
A.Lachaize CNRS/IN2P3 IPN Orsay
V. Andreev, A. Butenko, V. Elkin , E. Gorbachev, V. Isadov, A
ATF/ATF2 Control System
ELENA Overview and Layout Start of ELENA Commissioning Next Steps
JINR Experience in SC Magnets
P. Forck, P. Kowina, M. Schwickert, R. Singh
Development of new power supplies for J-PARC MR upgrade
Lecture 2 Live Feed – CERN Control Centre
An overview the ASTRID2 storage ring and its RF system
Timing System GSI R. Bär / U. Krause 15. Feb. 2008
ILC 3.2 km DR design based on FODO lattice (DMC3)
Advanced Research Electron Accelerator Laboratory
ILC 3.2 km DR design based on FODO lattice (DMC3)
Proposal for a CESR Damping Ring Test Facility
3.2 km FODO lattice for 10 Hz operation (DMC4)
Presentation transcript:

NUCLOTRON CONTROL SYSTEM (NCS) V.Andreev, E.Frolov, A.Kirichenko, A.Kovalenko, B.Vasilishin, V.Volkov Laboratory of High Energies, JINR, Dubna

Nuclotron Facility The superconducting synchrotron Nuclotron is intended to accelerate nuclei and multicharged ions. Circumference251.5 m Magnetic fieldup to 2 T Magnets: 96 dipoles 64 quadrupoles 32 multipoles

NCS Subsystems Thermometry and Cryogenic Diagnostics Injection and Injection Beam Line Control and Diagnostics Magnetic Field Correction Control and Diagnostics Circulating Beam Diagnostics Main Power Supplies Control and Diagnostics Slow Extraction and Extracted Beam Lines Control, External Beam Diagnostics Radio Frequency Control Radiation Safety Diagnostics

NCS Layout

NCS control & measurement points

NCS Software. Overview

NCS Software. Data Flows

NCS Local Area Network More than 50 computers are communicated: about 20 front-end ones and over 30 workstations Distributed Backbone structure Backbone on physical layer 100Base-FX NCS Average Data Flow is up to 250 kB/s (will be up to 2.5 MB/s after integration of the Beam Dynamics Investigation Subsystem)

NCS LAN Structure

RF Control Subsystem Digital synthesizer Acquitek CG100 as master oscillator DDS technology RF retuning when magnetic field changes by T

Beam Dynamics Investigation Subsystem The purposes of the Subsystem are: monitoring of beam parameters on the first turns and at the beginning of acceleration investigation of the beam losses causes detection of the bethatron frequency

Beam Dynamics Investigation Subsystem The signals from the ES pick- ups are measured now by 8-bit DAQ (256K on-board memory) with sampling rate of 50 MHz. Measurement duration is 5 ms. Algorithms of bunch detection and base line shift compensation were worked through. The 14-bit Gage Compuscope DAQ (8M memory) will be used during the nearest accelerator run. Measurement duration will be 80 ms.

Beam Dynamics Investigation Subsystem

Main Power Supplies Control Subsystem The subsystems controls power supplies of the bending (BM), focusing (FQ) and defocusing (DQ) magnets. Main machine cycle parameters: maximum magnetic field value- 2 Т main field ramping rate- up to 0.7 T/s cycle repetition rate Hz flat-top duration - from hundreds ms to 16 s

Main Power Supplies Control Subsystem The cycle is specified at the B(t) level The master signal for the BM supply is generated by tandem of pulse function generator (PFG) and analog function generator (AFG) The scaled value of real BM field is used as the reference for the QD supply; the real QD field is used as the reference for the QF supply Digital function (trains) is monitoring by pulse train analizer; the analog ones is measured by 16-bit multichannel DAQ (sampl. rate: 1 kHz)

Main Power Supplies Control Subsystem A new version of the subsystem is developed now. The hardware of the present subsystem is in CAMAC standard (3 crates, 50 modules). The new one will be equipped with precise function generators, scaling multiplying DACs, multichannel DAQs etc. in the PCI/ISA standard.

Conclusion At present, though not at its final dimension, the control system is fully operational and has the proposed functionality. An essential step to provide the accelerator with a high performance and flexible computer control environment has been accomplished