ELQA MP3 08 Septembre 2010, R. Mompo, TE/MTE-EI ELQA IPQs Splice measurements “New” current cycle applied since July 2010 Impact of low band passive filters.

Slides:



Advertisements
Similar presentations
MPP 18 June 2008, M. Bednarek & J. Ludwin, CERN 1 Measurements of voltage over main dipole magnet B30R7 Mateusz Bednarek & Jaromir Ludwin on behalf of.
Advertisements

MP3 report – week 17 19/4/2010 – 25/04/ interventions MP3/QPS team in CCC Monday Morning Meeting : 26th of April 2010.
0 Glencoe Accounting Unit 2 Chapter 7 Copyright © by The McGraw-Hill Companies, Inc. All rights reserved. Chapter 7 Posting Journal Entries to General.
The Back Office Presented by DP Software This Slide show has the Menu’s and selected Input Screens and Reports for the: Accounts Payable General Ledger,
Il sistema di HV del sottorivelatore DT S. Braibant, P. Giacomelli, M. Giunta, E. Borsato Bologna, 20/01/2007.
WLTP drive trace normalization
Hyper Status and Preliminary Testing of the New Hyper Bus Fault Detector CP Work done by CP section Based on Slides from Knud DAHLERUP-PETERSEN.
1 WP 10- High Voltage ’06 March 23 rd HV Trip studies  See previous meetings for the foreseen tests on LBC44  Started late by Clermont people when Clermont.
Design of Disturbance Rejection Controllers for a Magnetic Suspension System By: Jon Dunlap Advisor: Dr. Winfred K.N. Anakwa Bradley University December.
Oliver Bitterling  Introduction to the QPS  Radiation damage in electronic systems  Construction of radiation tolerant systems  Radiation test and.
document management system CADBase.
TE-MPE –TM, 16/05/2013, Mateusz Bednarek, TE/MPE-EE ELQA testing during and beyond LS1.
TopSpin Training Course, 22nd November 2006
Confidential / Property of Danfoss Drives A/S DD-SMT/DEJ 1 Drives Division VLT ® AutomationDrive FC302 PM Motors Configuration procedure By:
Session th January 2010 R.Schmidt TE/MPE Hardware Commissioning 2010 and beyond R.Schmidt.
MP3 report : W49 (6 slides, 6’) J.Ph Tock for the MP3 team Since oral report last week (24 th of November) 1JPhT – LMC 1st of December 2010.
Technical Training. 1 Configuration: 2558 Analog Input Module 1. Select voltage or current input mode for each channel 3. Select digital filtering, offset.
SCAD 508 Strain Measurement System Click Here To Download Complete Information On SCAD Products EXCITATION VOLTAGESelectable from 0.5VDC to 10 VDC in steps.
OVERVIEW PAYROLL ict.com/gcsehome.html.
Measuring Phase Difference Dr. Len Trombetta 1 ECE 2100.
Gabriele Vajente ILIAS WG1 meeting - Perugia Couplings of angular noises into dark fringe Diffused light studies.
SMOS QWG-11, ESRIN 4-5 July 2013 L2OS v600 status and evolution 1 The SMOS L2 OS Team.
TE-MPE Workshop 14/12/2010, Manuel Dominguez, TE/MPE-EI 1 Stephen Pemberton, TE/MPE-EI RB Earth Spark Investigation Initial Report. S. Pemberton, G. D’Angelo.
EMT 212 ANALOG ELECTRONICS Professor Robert T Kennedy.
BL1U at TRIUMF UCN Beamline Kicker Magnet (April 12, 2010)
Frequency Transfer Function Measurements during LS1 Emmanuele Ravaioli Thanks to Arjan Verweij, Zinur Charifoulline, Andrea Musso MPE-TM
CatVTM Controled atmosphere Vibrating magnetometer.
Technion – Israel Institute of Technology Department of Electrical Engineering Winter 2009 Instructor Amit Berman Students Evgeny Hahmovich Yaakov Aharon.
Recent cross-wiring issue and implication for circuits protection Bozhidar Panev TE-MPE-CP
E. Nagy - Low Mass Higgs 28th July 2011 Status of the ZZ-->llbb search1 Status of the ZZ  llbb search for the zh-llbb Team S.B. Beri, S. Caughron, M.-C.
M. POJER, ON BEHALF OF THE USUAL BUNCH OF SUSPECTS… S UPERCONDUCTING CIRCUITS RE - COMMISSIONING AFTER THE 2011 C HRISTMAS BREAK.
BCWG - 16/11/20102 Content WHY do we need a HW Commissioning campaign? WHAT are we going to do? HOW are we going to do it? ElQA QPS Powering Tests Planning.
Aras.com ACE 2011 International PrintHawk Enables your users print hundreds of file types directly from Aras with administratively controlled settings.
Improving Collimator Setup Efficiency LHC Beam Operation Committee, G. Valentino, R.W. Assmann, R. Bruce, F. Burkart, M. Cauchi, D. Deboy, S.
MP3 report – week /05/2010 – 09/05/ actions MP3/QPS team in CCC LMC: 12 th of May 2010.
MP3- MIC-C S1-2 A22R1- 19/08/2009 G.D’Angelo on behalf of Elqa team MP3 MIC-C test campaign in S1-2 Special guest: A22R1 (MB2413)  MIC-C in the ARC results.
1 1. Systems and Software Development 1.1 The Systems Life Cycle.
Systems, their relations & information. Concepts and Status of the new central service for tracking relations between CERN accelerator systems TE/MPE TM.
Measurement of LHC Superconducting Dipole and Quadrupole Magnets in Ramp Rate Conditions G.Deferne, CERN Aknowledgements: M. Di Castro, S. Sanfilippo,
Deutscher Wetterdienst Long-term trends of precipitation verification results for GME, COSMO-EU and COSMO-DE Ulrich Damrath.
FUNCTION GENERATOR.
System Software Is used to make sure your computer is safe / secure and running efficiently. Operating systems are a form of system software. Utility programs.
mp3DirectCut Audio recording.
Instrumentation & Root Mean Square Voltage
LBDS TSU & AS-I failure report (Sept. 2016)
Advance Steel: Automatic generation
600 A circuits resistance measurements
Topics Introduction to Repetition Structures
Update on HW commissioning
Breakdown meeting Noora-Mari Pienimäki
Status of MB Data Retrieval
LS1 TE/MPE/EE CABLE ACTIVITIES
Data Exchange.
Fix Error Code 43 in Windows 7 Call Number
Time-Current Coordination
video based traffic data collection
02/08/ :35: Lost access chain in point 2 (PX24 PAD)  Dump after ~14.5 hours ~100 nb-1.
Commercial Stainless Steel Freezers
Saturday 4.12 Beam in the SPS at 09:30 Beam in the LHC at 10:00
(1 test missing on RQD/F)
Quick Start Guide   Export data GM Pro 7.4.
Flux jumps in HQ Hugo BAJAS
Electrical traditional Chinese Instrument - Xun
Series 5300 Lithium Cell Formation System
CSE 1020:Software Development
Technical Stop #4 29th August - 2nd September 2011
MULTIMEDIA SYSTEMS Dr S.ARUNA/III BCA-C/MULTIMEDIA SYSTEMS/IMAGES,COLOR,IMAGE FILE FORMATS.
Friday 28 October 2011.
Electrical measurements and diagnostics
Presentation transcript:

ELQA MP3 08 Septembre 2010, R. Mompo, TE/MTE-EI ELQA IPQs Splice measurements “New” current cycle applied since July 2010 Impact of low band passive filters on the quality of our meas. RQ10.L8 without filters RQ10.L8 with 166 Hz filters RQ10.R4 with 7 Hz filters Summary of measurements performed this summer: In L4 on 23 & 29/07/2010 In R8 from 29/07 to 27/08/2010 In R2 on 02/09/2010 In R4 on 02/09/2010 R. Mompo on behalf of ELQA team

ELQA MP3 08 Septembre 2010, R. Mompo, TE/MTE-EI ELQA ~ 1 hour per magnet Example of cycles used as from July 2010

ELQA MP3 08 Septembre 2010, R. Mompo, TE/MTE-EI ELQA Same voltage scale Impact of low band passive filters on the quality of our meas. (1/3)

ELQA MP3 08 Septembre 2010, R. Mompo, TE/MTE-EI ELQA Same voltage scale Impact of low band passive filters on the quality of our meas. (2/3)

ELQA MP3 08 Septembre 2010, R. Mompo, TE/MTE-EI ELQA Same voltage scale Impact of low band passive filters on the quality of our meas. (3/3)

ELQA MP3 08 Septembre 2010, R. Mompo, TE/MTE-EI ELQA If we zoom, we clearly see the different steps

ELQA MP3 08 Septembre 2010, R. Mompo, TE/MTE-EI ELQA In fact, we even see an effect on the measurement of one aperture when the current is ramping in the other aperture! This effect is filtered during the manual analyses but not yet in ISRM program In fact, we even see an effect on the measurement of one aperture when the current is ramping in the other aperture! This effect is filtered during the manual analyses but not yet in ISRM program

ELQA MP3 08 Septembre 2010, R. Mompo, TE/MTE-EI R [n  ] (Manual analyses) R. Mompo R [n  ] (Automatic analyses) MSE [e-9] (Automatic analyses) Q10.L4DFLCS.7L DFLCS.7L DFLCS.7L Q9.L4DFLCS.7L / / 6.1 *5.6 / 4.8 * DFLCS.7L / / / DFLCS.7L / / 17.8 *5.7 / 4.9 * Q8.L4DFLCS.7L DFLCS.7L DFLCS.7L Q7.L4DFLCS.7L *0.7 * DFLCS.7L DFLCS.7L *0.3 * Measurements performed in L4 on 23 & 29/07/2010 with a 7 Hz low band filter on the input of the 3 DVM cards of PXIELQA01 and 5 min current plateaus cycles. *: File format error to be corrected in ISRM software

ELQA MP3 08 Septembre 2010, R. Mompo, TE/MTE-EI Configuration of the « ACB » and « BCA » switches were not correct !!! Problem corrected on 26/07/2010 but measurements had to be repeated… Sorry! Measurements performed in R8 on 23/07/2010 with a 7 Hz low band filter on the input of the 3 DVM cards of PXIELQA02 and 5 min current plateaus cycles.

ELQA MP3 08 Septembre 2010, R. Mompo, TE/MTE-EI R [n  ] (Manual analyses) R. Mompo R [n  ] (Automatic analyses) MSE [e-9] (Automatic analyses) Q10.R8DFLCS.7R *1.3 * DFLCS.7R DFLCS.7R *0.912 * Q9.R8DFLCS.7R DFLCS.7R DFLCS.7R Q8.R8DFLCS.7R *2.6 * DFLCS.7R DFLCS.7R *1.3 * Q7.R8DFLCS.7R DFLCS.7R DFLCS.7R Measurements performed in R8 from 29/07 to 27/08/2010 with a 7 Hz low band filter on the input of the 3 DVM cards of PXIELQA02 and 5 min current plateaus cycles. *: File format error to be corrected in ISRM software

ELQA MP3 08 Septembre 2010, R. Mompo, TE/MTE-EI R [n  ] (Manual analyses) R. Mompo R [n  ] (Automatic analyses) MSE [e-9] (Automatic analyses) Q10.R2DFLCS.7R *10.8 * DFLCS.7R DFLCS.7R *6.1 * Q9.R2DFLCS.7R DFLCS.7R DFLCS.7R Q8.R2DFLCS.7R *2.0 * DFLCS.7R DFLCS.7R *1.7 * Q7.R2DFLCS.7R DFLCS.7R DFLCS.7R Measurements performed in R2 on 02/09/2010 with a 7 Hz low band filter on the input of the 3 DVM cards of PXIELQA02 and 5 min current plateaus cycles. *: File format error to be corrected in ISRM software

ELQA MP3 08 Septembre 2010, R. Mompo, TE/MTE-EI R [n  ] (Manual analyses) R. Mompo R [n  ] (Automatic analyses) MSE [e-9] (Automatic analyses) Q10.R4DFLCS.7R *11.8 * DFLCS.7R DFLCS.7R *6.1 * Q9.R4DFLCS.7R DFLCS.7R DFLCS.7R Q8.R4DFLCS.7R *2.4 * DFLCS.7R DFLCS.7R *1.7 * Q7.R4DFLCS.7R DFLCS.7R DFLCS.7R Measurements performed in R4 on 02/09/2010 with a 7 Hz low band filter on the input of the 3 DVM cards of PXIELQA01 and 5 min current plateaus cycles. *: File format error to be corrected in ISRM software

ELQA MP3 08 Septembre 2010, R. Mompo, TE/MTE-EI ELQA Conclusions The last measurements performed with 7 Hz low band filters are giving very good results. This is translated by the MSE (Mean Square Error) value than is now reduced by a factor I still have to provide a tolerance for those measurements correlated to the MSE value. We still have 1 technical stop before the end of the year to measure possibly 2 new positions (with 2 systems).