Shrinkage Forum Tuesday 8 March 2011, 31 Homer Road.

Slides:



Advertisements
Similar presentations
Code Governance Review: WWU views on potential changes to UNC and the Modification Panel Simon Trivella – 30 th March 2010 Governance Workstream.
Advertisements

Review of NTS entry charge setting arrangements - IA 1 July 2010.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
RIIO-T1 impact on allowed revenues and network charges 6 September 2012.
USRV Incentives Review Chris Warner. USRV Resolution Responsibility and Occurrence  E8.1.1  “…the User shall investigate Reconciliation Values that.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
June 2003 Structure of Electricity Distribution Charges Next Steps Martin Crouch Director, Distribution.
UNC Modification Proposal Revised Timescales for LDZ Shrinkage Arrangements Simon Trivella – 25 th September 2008 Distribution Workstream.
Accuracy of CV determination systems for calculation of FWACV Dave Lander.
21 May 2015 GAZ DE FRANCE ESS Mod 115 An alternative view Phil Broom Gaz de France ESS.
Shrinkage Forum Monday 27 June 2011, 31 Homer Road.
Entry Capacity Release Methodology Statement Transmission Workstream, 4 th May 2006.
Capacity trade and transfer mechanism and the next AMSEC auction Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 9 May 2007.
User Pays Funding – Potential Licence Mechanism Simon Trivella – January 21 st 2010 Governance Workstream.
Shrinkage Forecasts - Factors David Simpson September 2014.
Amendments to NTS Shrinkage Reporting Process Nick Reeves.
“Introduction of a New Shipper Obligation in Relation to the Procurement of Gas Below the Gas Safety Monitors” Transmission Workstream 4 th Jan 2007 Chris.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Capacity Release Processes and Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
Code Governance Review UNC Modification Proposals Chris Shanley - National Grid NTS.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
LDZ Shrinkage - a National Grid Overview Chris Warner Mod 0194/RG 0208 June 2008.
Gas Performance Assurance Framework 11 th January 2013 Confidential.
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
UNC (Urgent) Modification Proposal 0044: “Revised Emergency Cash-out & Curtailment Arrangements” UNC Transmission Workstream 11 th August 2005.
OPNs & LDZ Demand Forecasts Chris Shanley & Nick Reeves.
LDZ System Charges – Structure Methodology 26 April 2010.
Shrinkage Forum 04 June 2013 Roy Malin. 2 Best Practice - Areas of Inconsistency AreaBackgroundAction Definition of All-PE systems Used to identify networks.
Shrinkage Forum 22 January 2014 Roy Malin /15 Shrinkage Proposals  Initial proposals issued December 2013  Proposed Shrinkage Quantities calculated.
LDZ Shrinkage Forum Jonathan Dennett Elexon 22 nd June 2006.
Presented by : Steven J Edwards, Head of Income and Pricing, Wales & West Utilities GDN Allowed and collected revenue awareness presentation for Shippers.
Entry Capacity Substitution Workshop 2 7 th May 2008 Substitution Example.
Modification proposal 0073 ‘Revision to the Notice Period regarding the implementation of changes to Transportation charges’ Transmission Workstream, 2.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
DNPC08 Review of Standard LDZ System Charges 6 September 2010.
Open letter on Development of the regime ahead of winter 2007/8 Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 28 June 2007.
Review of Entry Capacity and the Appropriate Allocation of Financial Risk Review Group th Sept 2008.
Billing Operations Forum 24 July 2007 RbD Overview Billing Operations Forum 24 July 2007 RbD Overview Fiona Cottam.
Modification Proposal 0395 & 0398 – Limitation on Retrospective Invoicing and Invoice Correction 1 st December 2011.
Customer Charge On behalf of all DNs 25 October 2010.
Gas Distribution Transportation Charging What are the Risks to Pricing predictability? Stephen Marland Pricing Manager
Leakage Model Development Proposals – Shrinkage Forum Discussion Wednesday 14 December 2011.
11 User Pays User Committee 16th February Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Code Governance Review UNC Modification Proposals Beverley Viney - National Grid NTS.
Transmission workstream 6 April Overview of TPCR Third Consultation UNC transmission workstream – 6 April Mark Feather.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th March 2009.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th Feb 2009.
Transitional Exit Capacity Proposals -Update Offtake Agreement Workstream, 30 Nov 05 Dave Adlam.
Modification 0232 Presentation for Total By Gareth Evans.
Industry Dialogue on xoserve Services 14 th September 2007.
Development Modification Proposal: Introduction of an Inter-day Linepack Product Review Group August 2010 Transmission Workstream 07/10/2010.
Proposal to modify Standard Special Conditions A4, A5 and D11 of the Gas Transporter licence Distribution Charging Methodology Forum (DCMF) 13 August 2007.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
DNPC05 Consultation Paper Balance of Revenue Recovery between LDZ System Charges and Customer Charges Steve Armstrong 27 th July 2009.
DN Interruption Reform Transmission Workstream Mark Freeman 5 th April 2007.
Stuart Forrest, Network Planning Manager, Scotia Gas Networks 19 th October 2010 MOD Review of Industry Charging & Contractual Arrangements in Relation.
Transitional offtake arrangements – Ofgem Initial Proposals on transitional incentives 6 October 2005.
Background Current balance of LDZ System and Customer charges
Annual Review of Shrinkage and Leakage Model
User Pays Funding – Potential Licence Mechanism
Code Governance Review UNC Modification Proposals
Transmission Workstream 4th July 2007
LDZ System Charges – Structure Methodology 26 July 2010
Incentives 26 September 2018.
Leakage Model Modification Update
Exit Capacity Substitution and Revision
Joint Office Presentation for Modification 0678
Leakage Model Modification Update
Assured Pressures Proposal
Incremental Entry Capacity Release Methodology Statement
Presentation transcript:

Shrinkage Forum Tuesday 8 March 2011, 31 Homer Road

2 Agenda  1.0 Introduction  2.0 Review of Minutes and Actions from previous meeting (08 March 2007)  3.0 Incentive Regimes – DN Presentation  4.0 Leakage Model – DN Presentation  5.0 Shrinkage Proposal Process – DN Presentation  6.0 Theft of Gas – Open Discussion  7.0 Any Other Business  8.0 Diary Planning  Agree agenda items and actions for next meeting

Incentive Regimes

4 Incentive Regimes - Shrinkage  Shrinkage Incentive - Special Condition E8  Target volume baselines by LDZ  Incentive – reduce shrinkage volumes  Performance ‘valued’ at day-ahead gas price  Incentive – procure gas cheaper than day-ahead price  No cap or collar  Performance has a direct impact on DN costs and leads to a better distribution of costs under RbD

5 Incentive Regimes - Environment  Environmental Emissions Incentive – Special Condition E9  Target volume baselines by LDZ  Incentive – reduce leakage volumes  Performance ‘valued’ at social cost of carbon  10% cap and collar regime  Performance has a direct impact on DN revenue

Leakage Model

7  Methodology developed in the early 1990s  Currently a spreadsheet model  ‘Controlled’ by Special Condition E9 in Gas Transporter Licences  Five main elements  LP Leakage  MP Leakage  AGI Leakage  AGI Venting  Interference Damage

8 Leakage Model E9 Obligations  The Leakage Model shall facilitate the achievement of the following objectives –  The accurate calculation and reporting of gas leakage  Being consistent with, and where reasonably practicable, identical to Leakage Models used by other DN Operators.  Report the actual leakage volume (LVt,i) together with any new information obtained by the licensee regarding leakage rates, including data derived from leakage tests.  Annually review the Leakage Model to ensure that it continues to achieve the objectives and  Consult with shippers and other interested parties to seek their views  Propose such modifications (if any) as are necessary for the purpose of better achieving the objectives.

9 Leakage Model E9 Modification Process  Propose revised baselines  Consult with the industry  Appoint an ‘Independent Expert’ to review and report on the proposal  Submit report on the consultation to Ofgem  Implement the modification if approved by Ofgem

10 Leakage Model Elements & Main Input Parameters  LP Leakage  Pipe Asset  No. Services & Replacement  Average System Pressure  MEG Saturation  MP Leakage  Pipe Asset  AGI Leakage  Asset Numbers  AGI Venting  ‘Fixed’  Interference  Number of incidents  Reportable incidents

11 Low Pressure Leakage Model  Approximately 80% of all leakage  Leakage rates for 11 diameter/material bands, based on a national survey carried out in 2002/03  > 2000 low pressure networks nationally  Average System Pressure - determined via recorded source pressure data and network analysis  MEG Saturation (where used) – determined from recorded data and network analysis  Pipe asset lengths (replacement of metallic mains has greatest impact)  No. of services

12 Medium Pressure Leakage Model  Approximately 8% of all leakage  Calculated at LDZ level  Pipe asset lengths

13 AGI Leakage Model  Approximately 7% of all leakage  Calculated at LDZ level  5 leakage rates for AGI asset types, based on a national survey carried out in 2002/03:  Holders  NTS Offtakes  LTS Offtakes  District Governors  Service Governors

14 AGI Venting Model  Approximately 5% of all leakage  Fixed values based on a national value from the 2002/03 AGI leakage test report apportioned by relative number of ‘venting’ AGI asset at time of Network Sales

15 Interference Damage Model  Approximately <0.5% of all leakage  Based on:  >500kg release incidents  Actual release value where recorded/estimated  Number other recorded incidents  Split by LP/MP (95/5)  Split by Puncture/Fracture (50/50)  Assumed leakage rates and response/fix times

Shrinkage Proposal Process

17 Shrinkage Proposal Process

Theft of Gas Open Discussion