Achievement of 41 MV/m Gradient by AES8 Rong-Li Geng Jefferson Lab ALCPG09, October 1, 2009.

Slides:



Advertisements
Similar presentations
New Optical Inspection Results at JLab An in-depth update since Chicago meeting ILC08 (Highlights reported in US Regional Talk by Mark Champion) Rong-Li.
Advertisements

6/Nov/2012 TTC Meeting 1 Improvement of cavity performance by T-mapping/X-ray-mapping, optical inspection and local grinding Kirk.
KEK cavity status, March 2011 H. Hayano, ALCPG11, WG3, Eugene.
New Results on Field Emission Suppression in EP Multi-Cell Cavities at JLab Rong-Li Geng Jefferson Lab ILC10, March 26-30, 2010, Beijing, China.
Cavity package T.Saeki BCD meeting 20 Dec Cavity shape BCD: TESLA shape Pros: small wakefield, HOM thoroughly investigated single-cell: 43 MV/m.
ILC PM Meeting S0 Webex Global Design Effort 1 S0/S1 Next Steps Lutz Lilje GDE.
ILC08 Chicago Global Design Effort 1 Discussion of Optical Inspection and Temperature mapping Results Several new inspection and mapping systems.
Rong-Li Geng Jefferson Lab High Efficiency High Gradient Cavities - Toward Cutting Down ILC Dynamic Heat Load by Factor of Four R.L. Geng, ALCW2015,
Cavity Gradient Yield Plots Update, August, 2009 As reported by Akira Yamamoto to the EC and the ILCSC August, 13, 2009 On behalf of the ILC Cavity Global.
Jim Kerby, Fermilab for Rongli Geng and the S0 Cavity Team 23 May 2010 Current Status of SCRF Cavity Development SCRF Cavity Technology and Industrialization.
Cavity status; recent KEK activities : Hayano (1) STF CM-1 cavities are; MHI-014: 3-rd VT:36MV/m (finished) MHI-015: 3-rd VT: > 18.4MV/m.
Gradient Yield Rongli Geng Jefferson Lab ILC AD&I at DESY, May 28-29, 2009.
Americas S0 Plan in USA Shekhar Mishra Fermilab/GDE US Main Linac Cavity and Cryomodule WBS.
R.L. Geng, 8/28/07AES cavity meeting, JLAB1 AES 9-cell ILC Cavity Processing and Testing at JLAB What have been learned and proposals for future steps.
Cavity Productions at DESY DESY -MPY- FNAL Overview on the cavity productions Review of cavity performance Some conclusions.
Update on Global Cavity Database and Yield Evaluation DESY Database Group: D. Gall (DESY) V. Gubarev (DESY) S. Yasar (DESY) 28.Mar.2010Yamamoto/Ginsburg.
Summary of Main Linac SCRF-part H. Hayano, ILC08 at UIC.
Superconducting rf test facility STF 1 Optical Inspection update at KEK Ken Watanabe ( KEK ) ILWS08 in Chicago 17-Nov-08.
R.L. Geng, KEK September 9, 2010 Global Design Effort 1 Near Term ILC Gradient R&D R&D Specification and Standardization Gradient Gradient Yield/Scatter.
TILC09 / SCRF Session Update on S0 Work in the Americas Region Mark Champion, Fermilab With slides provided by: Zack Conway, Cornell Rongli Geng, Jefferson.
AAP Review on SCRF to be prepared Akira Yamamoto, Marc Ross, and Nick Walker ILC-GDE Project Managers To be presented at ILC-10, Beijing, March 26, 2010.
Global Design Effort 1 S0 Status High-Gradient cavities Lutz Lilje DESY supplement by H. Hayano 04Sep2008 EC
R.L. Geng, 5/27-31,2013 ECFA LC2013, DESY 1 Update on Raising Q0 at Ultra-High Gradient via Large-Grain Niobium Material Rongli Geng Jefferson Lab ECFA.
Rongli Geng March 4, th LCC ILC Cavity Group Meeting
Fermilab 2 Dec 2009CM Ginsburg Global Cavity Database Report C.M. Ginsburg (Fermilab) On behalf of the database group (as part of S0 effort):
R&D Expected in Cooperation with Vendors ILC Baseline Assessment Workshop Mark Champion September 09, 2010.
Americas Cavity Specification C.M. Ginsburg (Fermilab) On behalf of the Fermilab cavity crew October 20, 2010.
ILC Cavity Gradient R&D Plan Proposal for Release 5 Rongli Geng for ILC Cavity Group 2jun2010 ILC SCRF WebEx Meeting 6/2/20101ILC SCRF WebEx Meeting.
Superconducting rf test facility LCWS 2010 in Beijing, 28 Mar 2010, Ken Watanabe Replica-method and local grinding repair K. Watanabe (KEK) LCWS 2010 in.
(1)[12~13/Dec/2009] Optical inspection (2)[14/Dec] frequency & field flatness measurement (3)[10/Mar/2010] pre-EP (5μm) (4)[11/Mar] EP1 (100μm) (5)[11/Mar]
E. KAKO (KEK) 2009' Oct. 26 ILC KEK Global Design Effort 1 Cavity Preparation for S1-Global Eiji Kako (KEK, Japan)
HiGrade-Kickoff DESY Global Design Effort 1 ILC-HiGrade WP6 High-Gradient cavities Lutz Lilje DESY.
10/1/09 R.L. Geng ALCPG09, Albuquerque, NM 1 Cavity R&D Status and Future Plans - with a partial summary of SRF2009 Rongli Geng Jefferson Lab.
Update on S0 Work in the Americas Region Mark Champion 17 June 2008.
KEK-STF Vertical Test and Diagnostics Brief History & Future Plan Vertical Test Facility Cavity Diagnostic System Example of MHI#7 Cavity Summary of T-mapping.
Curtis Crawford, Georg H. Hoffstaetter Cornell University Laboratory for Elementary-Particle Physics Optimization of f 9-cell Vertical Electro Polishing.
ALCPG2011, 3/19- 23, SRF Group Institute of Heavy Ion Physics, Peking University ALCPG /3/19-23, Eugene, Oregon, USA RF superconducting Cavity.
Explosive Events during V.T. in KEK ECFA (2013/5/30) 1.
ILC Gradient R&D Rongli Geng Jefferson Lab ILC Main Linac WebEx Meeting July 28, 2010.
JLab Update Rongli Geng April 30, th LCC ILC Cavity Group Meeting.
Hydroformed Multi-Cell Cavities. Update Waldemar Singer, DESY Peter Kneisel, JLab.
JLab Update Rongli Geng, Aril Palczewski, Yongming Li September 4, nd ILC Cavity Group Meeting.
W. Singer. SRF2011, July 25 ‐ 29, 2011, Chicago, Illinois, U.S.A. XFEL Cavity Recipe for Mechanical Fabrication and Treatment Waldemar Singer/DESY.
Update on S0 Work in the Americas Region Camille Ginsburg (FNAL) 2 June 2009 Slides/Info from: Zack Conway (Cornell) Rongli Geng (JLab) Genfa Wu, Dmitri.
JLab Update Rongli Geng, Ari Palczewski, Yongming Li December 11, rd ILC Cavity Group Meeting.
Americas Report C.M. Ginsburg (FNAL) for the FNAL/ANL, JLab, and Cornell (no report this time) cavity teams S0 Meeting 7.June 2011.
Plasma cleaning Laser re-melting technique at FANL M. Ge, G. Wu, J. Ruan, J. Ozelis, T. Nicol, D. Sergatskov, D. Hicks, L. Cooley Fermi National Accelerator.
July 5th,2006John Mammosser, Jlab ILC – Electropolish Development (EP) Plans/Progress/Problems/Performance Jefferson Lab J. Mammosser, L. Phillips, C.
Rongli Geng ILC Cavity Group Meeting October 25, 2011
Strategy and Status of Reference Cavities for European XFEL
Electropolishing of Dressed ILC 9-cell Cavity
ILC R&D Board Meeting: SRF Cavities Status and Plans
Cavity Gradient R&D Status and Future Plans for TDP-2
Energy (ILC) and Intensity (Project X) SRF Cavity Needs
Rongli Geng Jefferson Lab & GDE
for the FNAL/ANL, JLab, and Cornell cavity teams
Surface Analysis of the Quench Area Sample of Cavity Z111
High Q via N infusion R&D at Jefferson Lab
ELLIPTICAL SCRF CAVITIES
Recent VT Results in the STF-2 cavities
Working Group 3 Summary TTC Meeting INFN Milan,March 3, 2011
Highlights from EU Global Design Effort
TTC topical-meeting on CW SRF 2013
Nick Walker (DESY) EU GDE Meeting Oxford
LCLS-II High Q0 Cavities: Lessons Learned
Cornell Results 20 V 60 V Changing the Growth of Oxide (By Anodizing) Has Small Effects 20 V.
Retreatment of Superconducting Cavities for the European XFEL
Vertical Test Results of 9-Cell Cavities for LCLS-II
TTC Meeting, 28 February - 2 March, 2011, Milan
The LCLS-II HE High Q0 and Gradient R&D Program
Presentation transcript:

Achievement of 41 MV/m Gradient by AES8 Rong-Li Geng Jefferson Lab ALCPG09, October 1, 2009

Second Production Batch at AES FNAL ordered 6 fine-grain 9-cell cavities. AES#5, #6, #7, #8, #9 and #10. JLab received AES#5, #6, #8, #9 for EP processing and RF testing. AES#5 and #6 were processed using standard procedure at JLab. AES#5 max. Eacc 21 MV/m; AES#6 14 MV/m. Both limited by quench. Pass-band and T-mapping measurements to show quench caused by one defect in one cell, with other cells reaching already MV/m. 10/1/09, Rongli GengALCPG09, Albuquerque, NM2

Change for AES#9 Treatment It was noticed that AES cavities are stiffer somehow as compared to cavities from other vendors. – At one point our tuning machine was broken during AES cavity tuning operation. We decided to change vacuum furnace heat treatment recipe for alleviation. – 800 C X 2 hr replaces 600 C X 10 hr. – The change is considered no risk as it is identical to DESY HT recipe. First trial with AES#9 – tuning condition improved by a factor of 2. – AES#9 first RF test reached max. Eacc 34 MV/m at Q0 1E10. Optical inspection of AES5, 6, 8, 9 as received did not show much difference – We then raised the possibility of change in HT being beneficial. 10/1/09, Rongli GengALCPG09, Albuquerque, NM3

Further Change in AES#8 Treatment Encouraged by AES#9 result, we decided to apply the same HT for AES#8. In addition, AES#8 was given a 10  m BCP etching using JLab close-loop BCP machine before heavy EP processing. – This decision was driven by the observation of complex weld spatters, regional oxidization on the as-built surfaces of AES cavities. – The BCP treatment produces excellent starting surface before main EP! 10/1/09, Rongli GengALCPG09, Albuquerque, NM4

Weld Spatter Examples on As-built Surface 10/1/09, Rongli GengALCPG09, Albuquerque, NM5 AES6 Cell1 Half Cell M33 AES6 Cell3 Half Cell M82 5mm dia. artifact

A Pilot Joint JLab/AES Study Confirms Effectiveness of BCP Removal 10/1/09, Rongli GengALCPG09, Albuquerque, NM6 BeforeAfter A rejected double dumbbell welded by AES was studied by JLab A natural weld spatter was identified and a 5  m BCP efficiently removes the spatter resulting a uniform surface finish

10/1/09, Rongli GengALCPG09, Albuquerque, NM7 First power rise no detectable X-ray till 36 MV/m at which a sudden FE turn on commenced Final power rise precursor FE instability at 41 MV/m Gradient push limited to avoid field emitter explosion

A Note on Field Emission Behaviors Both AES#8 and AES#9 exhibited sudden field emission turn on at very high gradient. AES#9 was inspected following RF test – revealing surface damage in high electric field region which appears to be associated with mechanical defect on as-built surface. AES has taken actions to eliminate this defect after this information was provided to them. 10/1/09, Rongli GengALCPG09, Albuquerque, NM8

Summary First US industry built 9-cell cavity passed and exceeded ILC spec. A story of success due to the close cooperation between national lab and industry. Thanks optical inspection which allowed us to introduce changes/improvements. 10/1/09, Rongli GengALCPG09, Albuquerque, NM9