Delta II 7925H - 10L Baseline workup Launch Vehicle TheirsOurs Delta II 7925H Launch Vehicle 10L Composite Fairing 10L Stretch Composite Payload Fairing.

Slides:



Advertisements
Similar presentations
Welcome to the University of Michigan – Dearborn Observatory Founded 2007.
Advertisements

OFD 1 Oli Durney LBTI Optical Engineer Steward Observatory University of Arizona NIC Aperture, Pupil, and Filter Wheel Positions Rev. 3.3 November 3, 2011.
OFD 1 Oli Durney LBTI Optical Engineer Steward Observatory University of Arizona NIC Aperture, Pupil, and Filter Wheel Positions Rev. 2.3 September 19,
TMA-65 Workup Robin Lafever 30 April Detector geometry.
Astronomers Learn to Work in Space. Technical Challenges Detectors Pointing and Stability Data Storage Contamination Thermal Control Background radiation.
Optical Astronomy Imaging Chain: Telescopes & CCDs.
NIC Aperture, Pupil, and Filter Wheel Positions
SNAP Mechanical Overview
Aug.19, 1999 George T. Roach Integration Mission Design Center NASA- GSFC Code 543 Greenbelt, MD FAX
Thermal Design and Modeling for Infra Red Spectroscopic Imaging Survey Payload (IRSIS) S. L. D’Costa.
Solar Orbiter EUS: Thermal Design Considerations Bryan Shaughnessy, Rutherford Appleton Laboratory 1 Solar Orbiter EUV Spectrometer Thermal Design Considerations.
Delta II –7920 Fitup Study Model TMA-56 f10 optics In-Line configuration Delta II Launch Vehicle 7920 H 10L Composite Fairing.
NIR LOWFS for Keck and TMT Roger Smith & David Hale.
Twenty years ago IRAS gave us what is still our best view of the mid  infrared sky.
1 Acquisition Camera: Troubleshooting Help Vern STAHLBERGER Institute for Astronomy August Comments and Purpose: 1)Images not centered in Acquisition.
Constellation Orion Visible Light Constellation Orion Infrared Light.
Setup of laser tracker on DX side NOTE: X axis along M1s centers, towards SX Z axis along M1-M2 centers, towards M2.
Berkeley workshop summary Redundancy : dual detector Field of view : 3”x6” Spectrograph length goal: < 400 mm Isostatic mount on the base plate with control.
Grazing-incidence design and others L. Poletto Istituto Nazionale per la Fisica della Materia (INFM) Department of Electronics and Informatics - Padova.
ISHELL Design Review Cryostat & Optics Bench Dan Kokubun 9/11/2013.
Dennis C. Evans p1 SuperNova/Acceleration Probe 16 November 2001 Optical Analysis & Stray Light Evaluation Optical Analysis and Stray Light Evaluation.
Eddington Kick-Off. Vienna, September 17th, 2001 T.Muñoz/C.Laviada (INTA) 1 EddiCam: The Eddington Photometric Camera Preliminary Design Layout.
SNAP OTA Baseline TMA62 M.Lampton Jan 2002 UC Berkeley Space Sciences Lab.
Determinate Space Frame Telescope Structures for SNAP Bruce C. Bigelow University of Michigan Department of Physics 7/28/04.
PACS IIDR 01/02 Mar 2001 FPFPU Alignment1 D. Kampf KAYSER-THREDE.
OFD 1 Oli Durney LBTI Optical Engineer Steward Observatory University of Arizona NIC Aperture, Pupil, and Filter Wheel Positions Rev. 2.1 April 29, 2011.
Integral Field Spectrograph Eric PRIETO CNRS,INSU,France,Project Manager 11 November 2003.
Space-Qualified Hardware for the CALIPSO Lidar
SNAP Integration Model V. S14 The SNAP Integration Model Mechanical [ SC4 Breakout ] Robin Lafever LBNL Engineering.
Mechanical SuperNova/Acceleration Probe SNAP Study Dave Peters George Roach June 28, a man who's willing to make a decision in the first place can.
NORDFORSK Summer School, La Palma, June-July 2006 NOT: Telescope and Instrumentation Michal I. Andersen & Heidi Korhonen Astrophysikalisches Institut Potsdam.
Progress Report Geo-CAPE Coastal Ecosystem Dynamics Imager (CEDI) IRAD Repackaging Study Jason Budinoff / GSFC Cathy Marx / GSFC May 12, 2011.
Freiburg 7/07/20001 laser beam lens CCD (long arm) screen + grid CCD (short arm) glass plates at  45° STAMP : Saclay Telescope for the Alignment of Many.
SAXS/WAXS Conversion for Beamline Engineering Review.
Opto-Mechanics for SNAP at UM
After considerable pushing and shoving, this configuration show some promise. I have taken some liberties with the geometry and turned mounts inside-out.
Primary mirror Secondary mirror Spectroscopy focal plane Imager focal plane Beamsplitter Fully articulated solar panels and antenna Tertiary mirror Prism.
MAXIM Periscope ISAL Study Highlights ISAL Study beginning 14 April 2003.
TOP counter overview and issues K. Inami (Nagoya university) 2008/7/3-4 2 nd open meeting for proto-collaboration - Overview - Design - Performance - Prototype.
Status of RICH mechanical design at PNPI E.Vznuzdaev for PNPI group: V.Dobyrn, A.Khanzadeev, E.Kormin, V.Lebedev, N.Miftakhov, V.Polyakov, V.Samsonov,
Presenter Name Facility Name Ultra Thin CCD detectors for particle physics experiments.
Henry Heetderks Space Sciences Laboratory, UCB
Improved Annular-Field Three-Mirror Anastigmat? M.Lampton UCB SSL Previous AFTMAs have pri-sec separation 2.4m Can pri-sec separation be reduced? –Support.
MICROSCOPE DESIGN. beam expander and objective Why do we need a beam expander? What facts about the laser do we need to know? How much expansion do we.
S-17 Reference Model Status Robin Lafever 21 October 2004.
1 Shield and Fold Mirror Dimensions Michael Sholl 3 February 2005 MODIFIED by Robin Lafever 23 Feb 2005.
ATLAST-9.2: A Deployable Large Aperture UVOIR Space Telescope W. Oegerle 1, L. Feinberg 1, L. Purves 1, T. Hyde 1, H. Thronson 1, J. Townsend 1, M. Postman.
C2PU TELESCOPES © C2PU, Observatoire de la Cote d’Azur, Université de Nice Sophia-Antipolis Jean-Pierre Rivet CNRS, OCA, Dept. Lagrange
Jeff Bolognese p1 Super Nova/Acceleration Probe 16 November 2001 Structural Analysis Jeff Bolognese 16 November 2001.
SWT Overview 1 UCB, Nov15/16, 2006 THEMIS SCIENCE WORKING TEAM MEETING Mission Overview Peter R. Harvey Project Manager University of California - Berkeley.
SuperNova / Acceleration Probe Thermal System Wes Ousley November 16, 2001.
ISWG - December 7, Destiny, The Dark Energy Space Telescope.
Wes Ousley June 28, 2001 SuperNova/ Acceleration Probe (SNAP) Thermal.
May 22, 2003WFC3 Report at the June 03 TIPS1 Optical alignment and image quality testing at GSFC Test lead: Bill Eichorn, GSFC Test conductors: George.
1 SuperCam Optics & Mount Design Dathon Golish 8/2/06 Zemax Optical Design: Converts the SMT f/13.8 beam to f/5 to match SuperCam Large Flat:.75 m x.55.
WFIRST Large-cell structure concept design Preview Work in progress 3/4/2016Robin Lafever1.
STC "VOSKHOD", PROJECT "SPECTR-UV", JUNE 2006 Next slide Next slide Previous slide Possible layouts of Field Cameras.
EXTP Accomodation Study Hong Bin, Zhang Long Institute of Spacecraft System Engineering. CAST Oct 27th, 2015.
PACS IIDR 01/02 Mar 2001 Optical System Design1 N. Geis MPE.
Micro Arcsecond X-ray Imaging Mission Pathfinder (MAXIM-PF) Mechanical George Roach Dave Peters 17 May 2002 “Technological progress is like an axe in the.
New Support Structure 4x4 Beams Existing Stairs per Mr Walter Kellner Cherenkov 32 deg shifted back 4.0 inches to clear existing structure Cherenkov 40.
Onboard Instruments of ASTROSAT
The Anticoincidence Shield of the PAMELA Satellite Experiment
iSHELL Design Review Cryostat & Optics Bench
Henry Heetderks Space Sciences Laboratory, UCB
(Preliminary) WIYN 0.9 Meter Collimation Procedure
Space Frame Telescope Structures for SNAP: Part II
Auxiliary Pump Drive Option Replacement for D0S3002CX03
Stages of Production.
THERMAL CONTROL SYSTEM
Presentation transcript:

Delta II 7925H - 10L Baseline workup Launch Vehicle TheirsOurs Delta II 7925H Launch Vehicle 10L Composite Fairing 10L Stretch Composite Payload Fairing

Delta II 7925H - 10L Baseline workup Launch Vehicle Configuration 10L Composite Fairing Launch Volume (TMA-55 or 56) 6019 PAF 2nd Stage Engine 7925H LV Ours Theirs

Delta II 7925H - 10L Baseline workup TMA-55 Launch configuration 10L fairing Sun side envelope (270 deg) TMA-55 OTA (Baffle removed) Radiator side envelope (90 deg) 2nd stage engine 7925 Launch Vehicle

Delta II 7925H - 10L Baseline workup 10L Composite Fairing 6019 PAF 2nd Stage Engine

Delta II 7925H - 10L Baseline workup TMA-55 Optics

Delta II 7925H - 10L Baseline workup TMA_56 Optics

Delta II 7925H - 10L Baseline workup TMA-55 and TMA-56 Comparisons TMA-55 Very thin Optical Bench Plate Cassegrain Focus is buried inside Primary Pickoffs not accessable Filter Wheel limits beam rotation Thick Optical Bench Plate (250mm) Room for detector mounts and shield Multiple Pickoffs TMA-56

Delta II 7925H - 10L Baseline workup TMA-55 Rotated Beam

Delta II 7925H - 10L Baseline workup TMA-56 Optics with Gigacam. Configured for DeltaIV 4 meter fairing Secondary Mirror Primary Mirror NIR Imager CCD Imager Tertiary Mirror Radiators Filter wheel Star Trackers Gyro TTL Tracker Optical and NIR spectrometers Pickoff Assembly Flat Folding Mirror