1 NPRR638 Back-casting Updated Results CWG/MCWG Suresh Pabbisetty, ERP, CQF, CSQA. ERCOT Public April 22, 2015.

Slides:



Advertisements
Similar presentations
1 Revisions to M2 and RT Final Component of UFTA CWG/MCWG ERCOT Public January 22, 2014.
Advertisements

Seasonal Adjustment Factor Discussion Technical Advisory Committee
NPRR Proposed Changes TPTF Meeting 26 Aug 2008.
1 NPRR638 Back-casting Updated Results CWG/MCWG Suresh Pabbisetty, ERP, CQF, CSQA. ERCOT Public May 01, 2015.
RCWG Update to WMS April 9, VCMRR-VC for Cancellation of RUC Committed Resources Paragraph (3) of Nodal Protocol Section regarding Cancellation.
Seasonal Adjustment Factor Mark Ruane Credit Work Group ERCOT Public July 23, 2014.
MCWG Update to WMS Loretta Martin LCRA, Chair Josephine Wan AE, Vice Chair 03/05/
December 2, 2011 QMWG Summary of Potential Issues with NPRR385 Price Floor ERCOT.
Market Trials - Friday call Credit and Treasury Weekly Update September 3, 2010.
Capacity Forecast Report Sean Chang Market Analysis and Design Suresh Pabbisetty CQF, ERP, CSQA Credit CWG/MCWG September 16, 2015 ERCOT Public.
WMS Subgroup – CRR Credit 3.Review of CRR margining methodology for PTP Obligations in Nodal Protocols 4.Potential credit margin alternatives Cheryl Yager.
Market Credit Working Group update to the Wholesale Market Subcommittee 06/03/
MCWG Update to WMS 5/11/ Exposure / Collateral Update Nodal Total Potential Exposure reported by ERCOT as of 4/30/11 remains less than Zonal Estimated.
Market Credit Working Group update to the Wholesale Market Subcommittee 10/07/
Nodal Program Update and SEWG Update COPS 1/11/2011 Jim Galvin.
MCWG Update to WMS 6/15/ Exposure / Collateral Update Nodal Total Potential Exposure reported by ERCOT as of 4/30/11 remains less than Zonal Estimated.
Nodal Credit Monitoring and Management – Business Requirements ERCOT CREDIT Department October 11, 2006.
1 COMS/Settlements/Credit Weekly Update July 2, 2010.
1 Draft NPRR – Revisions to Certain Price Components of EAL CWG/MCWG ERCOT Public January 22, 2014.
1 Project Update and Summary of Project Priority List (PPL) Activity to Date May 15, 2014.
MCWG Update to WMS 08/14/2013. MCWG Update to WMS General Update -July 31 st Joint MCWG/CWG Meeting Review NPRRs All operational except – NPRR 552 – Additional.
Market Credit Working Group update to the Wholesale Market Subcommittee 04/06/
RCWG Update to WMS July 11, Alternatives to Address Negative Prices At its June meeting, WMS directed RCWG to bring back something to vote on. RCWG.
1 DAM Credit parameters review The “Procedures for Setting Nodal Day Ahead Market (DAM) Credit Requirements Parameters” is a document that is required.
Capacity Forecast Model Mark Ruane Credit Work Group ERCOT Public October 15, 2014.
Credit Updates Vanessa Spells Credit Work Group ERCOT Public February 18, 2015.
1 Project Update and Summary of Project Priority List (PPL) Activity April 16, 2015.
ORDC Options Analysis SAWG Market Analysis 12/16/2015.
January 7, 2011 Review Nodal Exposure / Collateral as of end of December, 2010 Cheryl Yager.
MCWG Update to WMS 11/13/2013. MCWG Update to WMS General Update - October 30 th Joint MCWG/CWG Meeting Review September 25 Meeting Minutes - Approved.
The credit exposure impact of higher system-wide offer caps was estimated using an internal ERCOT model under four scenarios: 1.(Base Case) “Normal” summer.
M2:Shortened RTM Settlement Timeline Vanessa Spells CWG/MCWG Meeting April 24, 2013.
Credit Updates Vanessa Spells Credit Work Group ERCOT Public December 16, 2015.
1 Nodal Credit Update at WMS June 16, 2010.
ERCOT CWG/MCWG April 24, 2013 DAM Credit Parameters.
1 NPRR638 Back-casting Supplementary Results CWG/MCWG Suresh Pabbisetty, ERP, CQF, CSQA. ERCOT Public May 13, 2015.
Market Credit Working Group update to the Wholesale Market Subcommittee 02/04/2015.
1 ICE Price Data Analysis CWG/MCWG Suresh Pabbisetty, CQF, ERP, CSQA. ERCOT Public January 20, 2016.
1 Load to Price Correlation CWG/MCWG Suresh Pabbisetty, CQF, CSQA. ERCOT Public February 20, 2014.
Market Credit Working Group update to the Wholesale Market Subcommittee 03/04/
1 NPRR 484/554 Phase 2 Suresh Pabbisetty, ERP, CQF, CSQA Lead Technical Analyst, Credit CWG / MCWG May 20, 2015 ERCOT Public.
1 Exposure Stress Testing CWG/MCWG Suresh Pabbisetty, CQF, CSQA. ERCOT Public June 12, 2014.
DAM Collateral Requirements Carrie Bivens Manager, Day-Ahead Market Dec 16,
1 Credit Parameters Review TAC July 2, Protocol Section , “Credit Requirement for DAM Bids and Offers” specifies: Credit Requirement for.
1 Timeline for Activities in Breach CWG/MCWG ERCOT Public September
Nodal Credit Monitoring and Management – Business Requirements ERCOT CREDIT Department September 28, 2006.
WMS – Nodal Credit Integration Start Up May 19,
Day-Ahead Market Discussion/Clarification TPTF April 24, 2006.
Capacity Forecast Report Fall Update Sean Chang Market Analysis and Design Suresh Pabbisetty CQF, ERP, CSQA Credit CWG/MCWG December 16, 2015 ERCOT Public.
1 NPRR638 (Seasonality) Back-Cast Results CWG/MCWG Suresh Pabbisetty, ERP, CQF, CSQA. ERCOT Public October 3, 2014.
1 NPRR638 Back-casting Updated and Supplementary Results CWG/MCWG Suresh Pabbisetty, ERP, CQF, CSQA. ERCOT Public May 20, 2015.
1 Project Update and Summary of Project Priority List (PPL) Activity to Date June 11, 2014.
Credit Exposure and Expected Loss update Suresh Pabbisetty, FRM, ERP, CQF, CSQA. Lead Technical Analyst, Credit February 17, 2016.
Project Funding Review February 7, Background ERCOT has a $15M project budget in 2013 (same as 2012) –To allow for new additions to the.
ICE Futures ERCOT North Hub Liquidity Analysis Suresh Pabbisetty, FRM, ERP, CQF, CSQA. Lead Technical Analyst, Credit April 20, 2016.
Revisions to Credit Exposure Calculations by using Electricity Futures Prices Suresh Pabbisetty, FRM, ERP, CQF, CSQA. Lead Technical Analyst, Credit May.
Credit Updates Vanessa Spells Credit Work Group ERCOT Public May 18, 2016.
Credit Exposure Analysis using ICE Prices Suresh Pabbisetty, FRM, ERP, CQF, CSQA. Lead Technical Analyst, Credit April 11, 2016.
Market Credit Working Group update to the Wholesale Market Subcommittee 3/02/
MCWG Update to WMS 3/9/2010. Exposure / Collateral Update Nodal Total Potential Exposure reported by ERCOT as of 1/31/11 remains less than Zonal Estimated.
Credit Exposure Analysis using ICE Prices Suresh Pabbisetty, FRM, ERP, CQF, CSQA. Lead Technical Analyst, Credit April 20, 2016.
Initial Estimated Liability (IEL)
Credit Reports Vanessa Spells COPS Meeting ERCOT Public
CMM Tech Refresh Project Update
2017 Seasonal Adjustment Factors
Credit Updates Vanessa Spells Credit Work Group ERCOT Public
Letter of Credit Concentration Limits
2003 CLRS September 2003 Chicago, Illinois
COMS/Settlements/Credit
Settlements Analysis due to SFT Deration Issue
Presentation transcript:

1 NPRR638 Back-casting Updated Results CWG/MCWG Suresh Pabbisetty, ERP, CQF, CSQA. ERCOT Public April 22, 2015

2 Updated Prototype features Updated NPRR638 prototype model includes: Application of look-backs to rolling averages over previous lrq and/or ldq days as in the NPRR. FIP Adjustment. Substitution of 0 for missing rolling average values. The prototype was executed for multiple Business Days as detailed below with ldq (Day Ahead look-back) at 1 and lrq (Real Time look- back) at 1, 3, 5, 7, and 10 days: 01/28/2014 through 12/31/2014 for 1-year look-back with 2014 prices substituted for /28/2014 through 02/28/2015 for 3-year look-back using prices from 2011 through ERCOT Public

3 Updated Prototype assumptions & limitations Assumptions and Limitations of Updated Prototype: Prices do not include replacement of historic price caps with current price caps. Prices prior to June 2014 do not include Operating Reserve Price Adders. Very limited validation has been performed due to time and resource constraints. Results shall be viewed as indicative only. The prototype is limited to calculation and comparison of RTLE+DALE values only. Impact of NPRR638 on MCE and overall TPE is out of scope for this prototype. A significant proportion of Counter-Parties’ collateral requirements continue to be driven by MCE. ERCOT Public

4 Updated Prototype known issues status Known Issues of previous model: In some cases RTLE calculation with higher look-back may result in relatively lower exposure than that of lower look-back. This is caused by missing and sporadic activity by some Counter- Parties at some settlement points at various timeframes. An example is as follows; ERCOT Public Status of Known Issues: The issue described above is fixed with the current model.

5 NPRR 638 FIP Ratio ERCOT Public

6 Results – FIP Ratio Mean FIP Ratio = Average FIP Ratio for all Operating Days used in price estimates for a given Business Date based on NPRR 638. ERCOT Public

7 NPRR 638 Backcast Results with 1 year look back using 2014 prices ERCOT Public

8 Results with 1 year look back - DASPP DAM Settlement Point Prices (DASPP) comparison: 2014 prices are substituted for 2013 ERCOT Public

9 Results with 1 year look back - DASPP DAM spread comparison: 2014 prices are substituted for 2013 ERCOT Public

10 Results with 1 year look back - DASPP DAM Price Estimates Monthly Trends: 2014 prices are substituted for 2013 ERCOT Public

11 Results with 1 year look back - RTSPP RTM Settlement Point Prices (RTSPP) comparison: 2014 prices are substituted for 2013 ERCOT Public

12 Results with 1 year look back - RTSPP RTM spread comparison: 2014 prices are substituted for 2013 ERCOT Public

13 Results with 1 year look back - RTSPP RTM Price Estimates Monthly Trends: 2014 prices are substituted for 2013 ERCOT Public

14 Results with 1 year look back – RTLE plus DALE RTLE plus DALE comparison: Spreadsheet with the following results is also published with meeting materials. ERCOT Public

15 Results with 1 year look back – RTLE plus DALE with FIP RTLE plus DALE with FIP comparison: Spreadsheet with the following results is also published with meeting materials. ERCOT Public

16 NPRR 638 Backcast Results with 3 year price lookback using prices ERCOT Public

17 Results with 3 year look back - DASPP DAM Settlement Point Prices (DASPP) comparison: 2011 – 2015 prices are used ERCOT Public

18 Results with 3 year look back - DASPP DAM spread comparison: 2011 – 2015 prices are used ERCOT Public

19 Results with 3 year look back - DASPP DAM Price Estimates Monthly Trends: 2011 – 2015 prices are used ERCOT Public

20 Results with 3 year look back - RTSPP RTM Settlement Point Prices (RTSPP) comparison: 2011 – 2015 prices are used ERCOT Public

21 Results with 3 year look back - RTSPP RTM spread comparison: 2011 – 2015 prices are used ERCOT Public

22 Results with 3 year look back - RTSPP RTM Price Estimates Monthly Trends: 2011 – 2015 prices are used ERCOT Public

23 Results with 3 year look back – RTLE plus DALE RTLE plus DALE comparison: Spreadsheet with the following results is also published with meeting materials. ERCOT Public

24 Results with 3 year look back – RTLE plus DALE with FIP RTLE plus DALE with FIP comparison: Spreadsheet with the following results is also published with meeting materials. ERCOT Public

25 NPRR 638 Prototype Results Summary ERCOT Public

26 NPRR 638 Prototype Results Summary Price look-back Summer price spreads were low with 1 year look-back by substituting 2014 prices for Increase in summer price spreads is observed with 3 year look- back as the impact of 2011 prices prevail. FIP Ratio Very high during Q1 of 2014, which resulted in relatively higher price estimates during that time frame. As we move toward Q FIP Ratios were significantly lower, which resulted in relatively lower price estimates. RTLE plus DALE Volatility is higher as RTM look back is increased from 1 through 10, this is caused by keeping DAM look back at 1 and DALE flips signs. Seasonal exposure level during summer with 1 year look back, was relatively low as a result of mild prices in Seasonal exposure level during summer with 3 year look back, was relatively high as a result of high prices from ERCOT Public

27 Questions? ERCOT Public