July 7, 2008SLAC Annual Program ReviewPage 1 PEP-II in Run 7 and Transition Planning John T. Seeman Assistant Director PPA/LCLS.

Slides:



Advertisements
Similar presentations
1 Luminosity of cm -2 s -1 at KEKB Preliminary plan Machine parameters RF system Vacuum system Injector Y. Ohnishi KEK Snowmass2001.
Advertisements

Study of the Luminosity of LHeC, a Lepton Proton Collider in the LHC Tunnel CERN June F. Willeke, DESY.
1 PEP Status M. Sullivan MAC Review Nov , 2007 M. Sullivan for the PEP-II Team Machine Advisory Committee Review November 15-17, 2007 Run 6 Summary.
PEP-II Ramp Down to a Minimum Maintenance State J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007.
PEP- II Linac Accelerator Systems Department The PEP-II B-Factory Accelerator John T. Seeman Assistant Director Particle and Particle-Astrophysics Division.
Super B-Factory Workshop, Hawaii, April 20-22, 2005 Lattice studies for low momentum compaction in LER M.E. Biagini LNF-INFN, Frascati.
CESR-c Status CESR Layout - Pretzel, Wigglers, solenoid compensation Performance to date Design parameters Our understanding of shortfall Plans for remediation.
SLAC Accelerator Department Super-B-Factory John T. Seeman Assistant Director of the Technical Division Head of the Accelerator Department Caltech Meeting.
PEP-II B Factory Machine Status and Upgrades John T. Seeman for the PEP-II Staff SLAC DOE Site Review April 9, 2003.
1 Super-B Factory Scenarios John Seeman Assistant Director PPA Directorate SLAC SLUO Meeting September 11, 2006.
June 2-4, 2004 DOE HEP Program Review 1 M. Sullivan for the PEP-II Team DOE High Energy Physics Program Review June 2-4, 2004 PEP-II Status and Plans.
Accelerator Systems Division FACET Project Management John Seeman for the FACET Study Group PPA Directorate Stanford Linear Accelerator Center DOE FACET.
Super-B Factory Workshop January 19-22, 2004 IR Upgrade M. Sullivan 1 PEP-II Interaction Region Upgrade M. Sullivan for the Super-B Factory Workshop Hawaii.
10 36 ??? 20 Apr K. Oide Super B Workshop.
PEP-II Status and Outlook John T. Seeman For the PEP-II Team SLAC EPAC Meeting June 12, 2003.
PEP-II and BaBar DND Review M. Sullivan Mar 23-24, 2009Page 1 PEP-II Overview and MMS Status Michael Sullivan SLAC National Accelerator Laboratory.
Issues for Optimization of a Super-B Factory John T. Seeman SBF Workshop SLAC June 14, 2006.
PEP- II Linac Accelerator Systems Department The PEP-II Overview John Seeman SLAC Particle and Particle-Astrophysics Directorate PEP-II MAC Review January.
Super-B Factory Workshop January 19-22, 2004 Super-B IR design M. Sullivan 1 Interaction Region Design for a Super-B Factory M. Sullivan for the Super-B.
SLAC Accelerator Department The PEP-II Accelerator John T. Seeman Assistant Director of the Technical Division Head of the Accelerator Department SLUO.
PEP-II Overview & Ramp Down Plan J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007.
SLAC Accelerator Department The PEP-II Accelerator Status and General Plans John T. Seeman Assistant Director of the Technical Division Head of the Accelerator.
SLAC Accelerator Department PEP-II Future Plans and Parameters John T. Seeman PEP-II MAC Meeting December 13, 2004.
Future Very High Luminosity Options for PEP-II John T. Seeman For the PEP-II Team e+e- Factories Workshop October 13-16, 2003.
Thomas Roser RHIC Open Planning Meeting December 3-4, 2003 RHIC II machine plans Electron cooling at RHIC Luminosity upgrade parameters.
SLAC Accelerator Department PEP-II Super-B-Factory Collider John T. Seeman Assistant Director of the Technical Division Head of the Accelerator Department.
CASA Collider Design Review Retreat HERA The Only Lepton-Hadron Collider Ever Been Built Worldwide Yuhong Zhang February 24, 2010.
1 Proposal for a CESR Damping Ring Test Facility M. Palmer & D.Rubin November 8, 2005.
Tsukuba-hall webcam 1 Beam Pipe and Vertex Detector extraction: on Nov. 10, 2010 Belle Detector Roll-out: Dec. 9, 2010 End-caps, CDC, B-ACC, TOF extraction:
ERHIC design status V.Ptitsyn for the eRHIC design team.
ILC MDI workshop January 6-8, 2004 PEP-II IR M. Sullivan 1 Interaction Region of PEP-II M. Sullivan for the ILC MDI workshop January 6-8, 2005.
Program Risks Risk Analysis Fallback Plans for the PEP-II B-Factory John T. Seeman DOE PEP-II Operations Review April 26, 2006.
SLAC Accelerator Department B-Factory Operations and Plans John T. Seeman Assistant Director of the Technical Division Head of the Accelerator Department.
D&D Review 6 August PEP-II Minimal Maintenance State Upkeep Stan Ecklund (J. Seeman, S. DeBarger, D. Kharakh, M. Zurawel)
SLAC Accelerator Development Program: SuperB Mike Sullivan OHEP Accelerator Development Review January 24-26, 2011.
1 Run7 startup M. Sullivan MAC Review Nov , 2007 M. Sullivan for the PEP-II Team Machine Advisory Committee Review November 15-17, 2007 Run 7 Startup.
DA  NE Status Report P. Raimondi Scientific Committee Nov-2005.
9 October 2003S. DeBarger PEP-II Vacuum Status PEP-II Machine Advisory Committee.
DA  NE: status report M. Preger on behalf of the DA  NE team 22/11/2010.
Introduction of Accelerators for Circular Colliders 高亮度 TAU-CHARM 工厂 & 先进光源, 2014/09.
Optics with Large Momentum Acceptance for Higgs Factory Yunhai Cai SLAC National Accelerator Laboratory Future Circular Collider Kick-off Meeting, February.
Summary of Accelerator parallel sessions M.Biagini on behalf of 23 speakers SuperB09, LAL, Feb. 16 th 2009.
J.W. ASEPS KEKB Upgrade Plan: SuperKEKB J.W. Flanagan ASEPS
The machine status and operating mechanism of BEPCII CAO, Jianshe Institute of High Energy Physics, CAS April 16, 2013 The 4th Accelerator.
HF2014 Workshop, Beijing, China 9-12 October 2014 Challenges and Status of the FCC-ee lattice design Bastian Haerer Challenges.
BINP tau charm plans and other projects in Turkey/China A. Bogomyagkov BINP SB RAS, Novosibirsk.
TDR and R&D Plans J. Seeman and M. Biagini For Super-B Staff.
Synchrotron Radiation Absorption and Vacuum Issues in the IR at PEP-II and a Higgs Factory John Seeman, SLAC October 11, 2014 HF2014 Beijing.
Mini MAC II PEP-II hardware M. Sullivan Apr 23-24, 2009Page 1 PEP-II Hardware Status M. Sullivan SLAC National Accelerator Laboratory Mini-MAC II Frascati,
PEP- II Linac Accelerator Systems Department Status and Plans for PEP-II John Seeman SLAC Particle and Particle-Astrophysics DOE HEPAP P5 Review April.
November 12-13, 2007 Super-B Factory: Accelerator Costing, PEP-II Hardware and Schedule J. Seeman SLAC International Review Committee meeting November.
PEP-II Status John Seeman SLAC Particle and Particle-Astrophysics
John T. Seeman DOE PEP-II Operations Review April 26, 2006
SuperB Injection, RF stations, Vibration and Operations
Michael Sullivan and John Seeman SLAC National Accelerator Laboratory
The PEP-II Interaction e+e- Factories Workshop
Top-Up Injection for PEP-II and Applications to a Higgs Factory
CASA Collider Design Review Retreat Other Electron-Ion Colliders: eRHIC, ENC & LHeC Yuhong Zhang February 24, 2010.
CEPC Booster Design Progress (Low field)
PEP-II Status and Plans e+e- Factories Workshop
The design of interaction region
Interaction Region Design Options e+e- Factories Workshop
Accelerator R&D Results from the B-factory
J. Seeman Assistant Director for PPA/LCLS
Summary of Washington DOE Review
Super-B Accelerator Overview
Proposal for a CESR Damping Ring Test Facility
Sawtooth effect in CEPC PDR/APDR
Electron Collider Ring Magnets Preliminary Summary
HE-JLEIC: Boosting Luminosity at High Energy
Presentation transcript:

July 7, 2008SLAC Annual Program ReviewPage 1 PEP-II in Run 7 and Transition Planning John T. Seeman Assistant Director PPA/LCLS

July 7, 2008SLAC Annual Program ReviewPage 2 Talk Overview *Brief PEP-II Layout *Run 7 operations *Transition planning *PEP-II Minimum Maintenance State *Future possibilities for PEP-II tunnel and hardware

July 7, 2008SLAC Annual Program ReviewPage 3 PEP-II Mission in FY2008 *To provide e+e- collisions to the BaBar Detector to carry out B-meson and other physics *Advance the “State of the Art” for accelerator physics for high luminosity colliders *Enter a “Minimum Maintenance State” after the collider programs terminates. *Start the study for “Deactivation and Decommissioning”.

July 7, 2008SLAC Annual Program ReviewPage 4 The PEP-II Team * PEP-II was constructed by SLAC, LBNL, and LLNL with help from BINP, IHEP, BaBar collaboration. Many thanks to the US Department of Energy And Machine Advisory Committee. 1x10 34

July 7, 2008SLAC Annual Program ReviewPage 5 Brief PEP-II History *1987: Physics: asymmetrical energies helps separate B mesons. *1991: First PEP-II CDR. *1993: Second CDR (9 GeV x 3.1 GeV). *1994: Construction started. *1997: First stored HER e - beam. *1998: First stored LER e + beam. *1998: First collisions July 23, 1998, at 12:05 pm. * : Y4S data for BaBar (433 fb - 1) *2008: Y2S (30 fb -1 ), Y3S (15 fb -1 ), and small energy scan for BaBar. *2008: Turned off PEP-II April 7, 2008, at 11:22 pm * just after setting an e+ current world record (3.2 A). * : Total delivered integrated luminosity = fb -1.

July 7, 2008SLAC Annual Program ReviewPage 6 PEP-II Layout * Two rings: Circumference = 2.2 km.

July 7, 2008SLAC Annual Program ReviewPage 7 B-Factory Overall Parameters *ParameterPEP-II * (LER/HER) *Circumference (m)2200 *Beam energy (GeV)3.1/9.0 *Number of bunches1732 *Beam currents (A)3.2/2.0 *Horizontal emittance (nm)30/45 *  y * (mm)9/11 *  y 0.06/0.05 *IP beam sizes (microns) (x/y)120/4 *Luminosity (x /cm 2 /s)12.1

July 7, 2008SLAC Annual Program ReviewPage 8 The PEP-II Collider

July 7, 2008SLAC Annual Program ReviewPage 9 PEP-II Interaction Region Components near BaBar HER LER Collision point BaBar BaBar Detector

July 7, 2008SLAC Annual Program ReviewPage 10 How the beams enter and exit the PEP-II Interaction Region

July 7, 2008SLAC Annual Program ReviewPage 11 IR Permanent Magnets

July 7, 2008SLAC Annual Program ReviewPage 12 Interaction Region Support Tube Be chamber Silicon Vertex Tracker SVT

July 7, 2008SLAC Annual Program ReviewPage 13 What worked with the PEP-II Accelerator design? *All components as designed worked to get above the design luminosity parameters (magnets, RF system, vacuum system, interaction region, background mitigation, beam instabilities, bunch-by-bunch feedbacks, injection, controls) *Major changes to get to x 4 luminosity and x 7 integrated luminosity: –Electron cloud instability needed 30 gauss solenoids on LER –Added cooling on IP Be chamber bellows. –Improved masking near IR –Added 7 RF stations to handle added current. –Improved feedback kickers –Improved RF controls –Higher power vacuum expansion bellows –Continuous injection mitigation –Shorten abort gap (3% to 1%) –Improved quadrupole lattices –Improved x-y coupling control

July 7, 2008SLAC Annual Program ReviewPage 14 PEP-II RF Cavity Early design and testing at LBL. High power production cells. Fully fitted cavity units with HOM dampers.

July 7, 2008SLAC Annual Program ReviewPage 15 * B-Factory RF Klystrons (1.2 MW)

July 7, 2008SLAC Annual Program ReviewPage 16 HOM Absorbing Bellows * HOM tiles Shield fingers

July 7, 2008SLAC Annual Program ReviewPage 17 Running before Trickle (Continuous) Injection *

July 7, 2008SLAC Annual Program ReviewPage 18 Continuous Injection for PEP-II *

July 7, 2008SLAC Annual Program ReviewPage 19 Luminosity Equation for a Circular e + e - Collider  y is the beam-beam parameter (~0.06)  I b is the bunch current (1 to 3 mA)  n is the number of bunches (~1700)  y * is the IP lattice optics function (vertical beta) (10 mm)  E is the beam energy (3.1 and 9 GeV)  (9 GeV varied to change Upsilon resonances.)  Luminosity (10 33 cm -2 s -1 )

July 7, 2008SLAC Annual Program ReviewPage 20 Beam-beam parameters * By 4 Extended  y * = ~  m.  y =  x = By 2 I - increases LER y size. I + increases LER x size. I + increases HER y size.

July 7, 2008SLAC Annual Program ReviewPage 21 PEP-II Parameters for 3.1 GeV x 9.0 GeV ParameterUnitsDesign April 2008 Best Factor over Design I+mA X 1.50 I-mA X 2.76 Number bunches X 1.04 y*y* mm /2.0 Bunch length mm /1.42 yy X 2.0 Luminosity X /cm 2 /s 312 X 4.0 Int lumi / day pb X 7.0

July 7, 2008SLAC Annual Program ReviewPage 22 Upsilon Resonances * To change center-of-mass energy, PEP-II changed HER energy (8.0 to 10.1 GeV) but not LER due to permanent magnet focusing in the interaction region. ResonanceDataHER Energy Y2S14.5 fb GeV Y3S30 fb GeV Y4S 433 fb GeV Scan above Y4S (5 MeV steps) 4.6 fb to 10.1 GeV

July 7, 2008SLAC Annual Program ReviewPage 23 PEP-II Peak Luminosity by Month ( ) * Design

July 7, 2008SLAC Annual Program ReviewPage 24 Design of 135 pb -1

July 7, 2008SLAC Annual Program ReviewPage 25

July 7, 2008SLAC Annual Program ReviewPage 26 PEP-II total integrated luminosity: 557 fb -1

July 7, 2008SLAC Annual Program ReviewPage 27

July 7, 2008SLAC Annual Program ReviewPage 28 PEP-II Uptime and Luminosity Integration vs Milestones * Uptime DOE Milestone Uptime PEP-II Actual Uptime Ratio PEP/DOE Integr. Lumin. DOE Milestone Integr. Lumin. PEP-II Actual Int. Lum. Ratio PEP/DOE FY200280% fb fb FY200380% fb fb FY200480% fb fb FY200580%42.7% fb fb FY200680%82.4% fb fb FY200780%81.1% fb fb FY200880%85.4% fb fb

July 7, 2008SLAC Annual Program ReviewPage 29 PEP-II General Accelerator “Achievements” *Introduced beta-beats to help chromatic corrections near IR. *First collider to continuously inject into a ring with the physics detector taking data. *Installed 2 km of solenoids on the e + LER ring to suppress the Electron Cloud Instability ECI. *Held the overall luminosity record for several years. Now second to KEKB (1.2 vs 1.7 x ) *Highest stored electron current (2.1 Amps) *Highest stored positron current (3.2 Amps)

July 7, 2008SLAC Annual Program ReviewPage 30 Transition planning *PEP-II Run 7 ended April 7, *PEP-II has since been kept under PPS (safety) control. *Only a very few parts have been removed for other programs. *Power usage has been minimized. *Venting, coil drying, and component removal will proceed as approval, funding, and manpower is available. *Staff: –Operators have all moved to LCLS operation. –Engineering staff moved to PEP-II minimum maintenance state, LCLS upgrades and maintenance, FACET, and PEP-X. –Physicists have moved to LCLS operations, PEP-II minimum maintenance state, FACET, PEP-X, and Super-B. –Operational PEP-II staff level (before April 7) : ~250 FTEs –Present PEP-II staff level (after April 7): ~5 FTEs. *Power: –Operational power = ~ 42 MW –MMS power = ~1.8 MW

July 7, 2008SLAC Annual Program ReviewPage 31 Budgets for PEP-II MMS and DND planning

July 7, 2008SLAC Annual Program ReviewPage 32 Future Potential Users of PEP-II Components *LCLS: a few small parts: corrector power supplies, gate valves, vacuum gauges, wire scanners, … *SPEAR-3: a few small parts: Loss monitors, streak camera, Bergos position monitor electronics. *PEP-X: Tunnel, 6 RF stations, support building, e- injection line *Super-B: All magnets, all power supplies, all electronics modules, 10 RF stations, all supports, all vacuum chambers *Project X: Magnets with vacuum chambers for transport lines *LBNL ALS : Chopper power supplies for ALS bends *J-Lab: Electro-magnets for energy upgrade

July 7, 2008SLAC Annual Program ReviewPage 33 PEP-X (SLAC Today July 3)

July 7, 2008SLAC Annual Program ReviewPage 34 PEP-II : Thanks to all! *