Glexec, SCAS & CREAM. Milestones CREAM-CE capable of large-scale direct job submission Glexec & SCAS capable of large-scale use on WN in logging only.

Slides:



Advertisements
Similar presentations
HTCondor and the European Grid Andrew Lahiff STFC Rutherford Appleton Laboratory European HTCondor Site Admins Meeting 2014.
Advertisements

OSG AuthZ Architecture AuthZ Components Legend VO Management Services Grid Site GUMS Site Services SAZ CE Gatekeeper Prima Is Auth? Yes / No SE SRM gPlazma.
1 Update on the Vulnerability Assessment Effort Elisa Heymann Computer Architecture and Operating Systems Department Universitat Autònoma de Barcelona.
LHCC Comprehensive Review – September WLCG Commissioning Schedule Still an ambitious programme ahead Still an ambitious programme ahead Timely testing.
CERN IT Department CH-1211 Genève 23 Switzerland t EIS section review of recent activities Harry Renshall Andrea Sciabà IT-GS group meeting.
Apr 30, 20081/11 VO Services Project – Stakeholders’ Meeting Gabriele Garzoglio VO Services Project Stakeholders’ Meeting Apr 30, 2008 Gabriele Garzoglio.
2 Sep Experience and tools for Site Commissioning.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Security and Job Management.
Ian Bird LCG Project Leader LHCC Referee Meeting Project Status & Overview 22 nd September 2008.
May 11, 20091/17 VO Services Project – Stakeholders’ Meeting Gabriele Garzoglio VO Services Project Stakeholders’ Meeting May 11, 2009 Gabriele Garzoglio.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks JRA1 summary Claudio Grandi EGEE-II JRA1.
EMI is partially funded by the European Commission under Grant Agreement RI Argus Policies Tutorial Valery Tschopp - SWITCH EGI TF Prague.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Angela Poschlad (PPS-FZK), Antonio Retico.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Argus gLite Authorization Service Status.
Pilot Jobs John Gordon Management Board 23/10/2007.
OGF22 25 th February 2008 OGF22 Demo Slides Prof. Richard O. Sinnott Technical Director, National e-Science Centre University of Glasgow, Scotland
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks gLite Authorization Service: Technical Overview.
Experiment Operations: ALICE Report WLCG GDB Meeting, CERN 14th October 2009 Patricia Méndez Lorenzo, IT/GS-EIS.
Glite. Architecture Applications have access both to Higher-level Grid Services and to Foundation Grid Middleware Higher-Level Grid Services are supposed.
EMI INFSO-RI Argus Policies in Action Valery Tschopp (SWITCH) on behalf of the Argus PT.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks CREAM Massimo Sgaravatto – INFN Padova On.
Jun 12, 20071/17 AuthZ Interoperability – Status and Plan Gabriele Garzoglio AuthZ Interoperability Status and Plans June 12, 2007 Middleware Security.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks New Authorization Service Christoph Witzig,
LCG Report from GDB John Gordon, STFC-RAL MB meeting February24 th, 2009.
LCG Support for Pilot Jobs John Gordon, STFC GDB December 2 nd 2009.
LCG Pilot Jobs and glexec John Gordon.
EMI INFSO-RI Argus The EMI Authorization Service Valery Tschopp (SWITCH) Argus Product Team.
1 Update on the Vulnerability Assessment Effort Elisa Heymann Computer Architecture and Operating Systems Department Universitat Autònoma de Barcelona.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Update Authorization Service Christoph Witzig,
EGEE-III INFSO-RI Enabling Grids for E-sciencE SA3 All Hands Meeting 'Cluster of Competence' Experience SA3 INFN Cyprus May 7th-8th.
INFSO-RI Enabling Grids for E-sciencE Policy management and fair share in gLite Andrea Guarise HPDC 2006 Paris June 19th, 2006.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Middleware Update Maria Alandes Pradillo.
Proxy management mechanism and gLExec integration with the PanDA pilot Status and perspectives.
WLCG ‘Weekly’ Service Report ~~~ WLCG Management Board, 5 th August 2008.
Enabling Grids for E-sciencE INFSO-RI Enabling Grids for E-sciencE Gavin McCance GDB – 6 June 2007 FTS 2.0 deployment and testing.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks MSA3.4.1 “The process document” Oliver Keeble.
INFSO-RI Enabling Grids for E-sciencE gLite Test and Certification Effort Nick Thackray CERN.
Sep 17, 20081/16 VO Services Project – Stakeholders’ Meeting Gabriele Garzoglio VO Services Project Stakeholders’ Meeting Sep 17, 2008 Gabriele Garzoglio.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks OpenSAML extension library and API to support.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Mario Reale – GARR NetJobs: Network Monitoring Using Grid Jobs.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks glexec/SCAS pilot service Status and short-term.
MW Readiness WG Update Andrea Manzi Maria Dimou Lionel Cons Maarten Litmaath On behalf of the WG participants GDB 09/09/2015.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Study on Authorization Christoph Witzig,
CERN IT Department CH-1211 Genève 23 Switzerland t CHEP 2009, Monday 26rd March 2009 (Prague) Patricia Méndez Lorenzo on behalf of the IT/GS-EIS.
EMI is partially funded by the European Commission under Grant Agreement RI Argus Policies Tutorial Valery Tschopp (SWITCH) – Argus Product Team.
Probes Requirement Review OTAG-08 03/05/ Requirements that can be directly passed to EMI ● Changes to the MPI test (NGI_IT)
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Job Management Claudio Grandi.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Authorization Service Christoph Witzig, SWITCH.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks The new gLite Authorization Service Alberto.
ECGI meeting on job priorities on May 15th 2006, CNAF Bologna How LHCb thinks to use/integrate g-PBox (or single components) and when Gianluca Castellani.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks CREAM: current status and next steps EGEE-JRA1.
Why you should care about glexec OSG Site Administrator’s Meeting Written by Igor Sfiligoi Presented by Alain Roy Hint: It’s about security.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Argus gLite Authorization Service Workplan.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Argus: command line usage and banning Christoph.
CREAM Status and plans Massimo Sgaravatto – INFN Padova
Argus EMI Authorization Integration
The gLite middleware distribution
Summary on PPS-pilot activity on CREAM CE
John Gordon, STFC-RAL GDB 10 October 2007
Global Banning List and Authorization Service
Accounting at the T1/T2 Sites of the Italian Grid
The CREAM CE: When can the LCG-CE be replaced?
Short update on the latest gLite status
Glexec/SCAS Pilot: IN2P3-CC status
Summary from last MB “The MB agreed that a detailed deployment plan and a realistic time scale are required for deploying glexec with setuid mode at WLCG.
Francesco Giacomini – INFN JRA1 All-Hands Nikhef, February 2008
Argus: General Introduction
Argus The EMI Authorization Service
gLite The EGEE Middleware Distribution
Presentation transcript:

Glexec, SCAS & CREAM

Milestones CREAM-CE capable of large-scale direct job submission Glexec & SCAS capable of large-scale use on WN in logging only mode Show CREAM-CE/glexce/SCAS at scale – Support direct job submission – Support WMS job submission

glExec PPS: On WN with setuid OK for small scale deployments. Logging only mode not working Large scale WN Deployment (needs SCAS) SCAS PATCH Failed certification CREAM CE Released – but not advertised Deployed on 2 sites ALICE experience OK PPS: On plenty of sites PATCH Ready for Certification: WN Proxy Renewal Large scale Direct Submission Deployment CREAM UI Used by ALICE From VO BOX Large scale direct Multi-User Pilot Jobs WMS PATCH Passed Certification: Has untested ICE Bug fix patch entering certification Large scale WMS Multi-User Pilot Jobs Condor-G  CREAM Simple submission working Moving through failure cases

Authorization Service Components: – PAP (Administration): Core functionality complete – PEP (Enforcement): Complete. Developer testing – PDP (Decision): Started Integration & Scalability Testing – January & February 2009 Enter Certification – Mid-March 2009 subject to satisfactory testing

Deployment (In Discussion) Incremental deployment – No big bang Local Deployment – No external dependencies. Local configuration Remote Policy checks – Pull in remote policy from OSCT Perform Authz checks during WMS site selection – Sends requests to sites or sites release policy to WMS Further details from recent SA3/JRA1 session – onId=8&resId=0&materialId=slides&confId=42513

Summary Priority remains glexec/SCAS/CREAM integration & deployment at scale – When independent components are proven Authz Service in EGEE-III DoW – Will be integrated & deployed when ready Load tests needed for CREAM integration – Activation will be incremental & can be site specific