Algorithm Design for Crossing and Passing Applications John Anderson and Colin Goodchild University of Glasgow, UK Thierry Miquel DSNA, Toulouse, France.

Slides:



Advertisements
Similar presentations
UNIVERSITY of GLASGOW A Comprehensive Approach to ATM Incorporating Autonomous Aircraft ATM Research Group University of Glasgow.
Advertisements

Page 1 CARE/ASAS Activity 3: ASM workshop Brétigny, 19 December 2001 CARE-ASAS Activity 3: ASM Estimating safe separations.
Page 1 CARE/ASAS Activity 3: ASM workshop Brétigny, 19 December 2001 Autonomous Aircraft OSED CARE-ASAS Activity 3: ASM Autonomous Aircraft OSED.
Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR CXXX-1A “Free Flight with Airborne Separation will result in an uncontrolled,
Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR CXXX-1A Free Flight with Airborne Separation will result in an uncontrolled,
Mediterranean Free Flight ASAS Separation and Spacing Presented by Andy Barff – Project Leader MFF Real-time Simulations ASAS-TN, Malmö
C ENTRE D'ETUDES DE LA NAVIGATION AERIENNE ASAS-TN, 2nd workshop - Malmö 6 ~ 8 october 2003page 1 Electronic separation Clearance Enabling the Crossing.
Episode 3 1 Episode 3 EX-COM D Final Report and Recommendations Operational and Processes Feasibility Pablo Sánchez-Escalonilla CNS/ATM Simulation.
Continuous Climb Operations (CCO) Saulo Da Silva
M I T I n t e r n a t i o n a l C e n t e r f o r A i r T r a n s p o r t a t i o n Influence of Structure on Complexity Management Strategies of Air Traffic.
Development of a Closed-Loop Testing Method for a Next-Generation Terminal Area Automation System JUP Quarterly Review April 4, 2002 John Robinson Doug.
Estimating Requirements and Costs of 4D ATM in High Density Terminal Areas Gunnar Schwoch DLR Institute of Flight Guidance Braunschweig, Germany ICNS 2012.
Advanced Safe Separation Technologies and Algorithms (ASSTAR) Project ASAS-TN2 Workshop #1 Malmö 26 th -28 th September 2005 ASSTAR is a Specific Targeted.
Applications from packages I to III
Page 1 CARE/ASAS Activity 3: ASM workshop Brétigny, 19 December 2001 Time-Based Sequencing OHA CARE-ASAS Activity 3: ASM Time-Based Sequencing OHA.
ASSTAR Oceanic Applications by Nico de Gelder, NLR ASSTAR User Forum #1 4 April 2006, Roma.
NASA Self-Separation from the Air and Ground Perspective Margaret-Anne Mackintosh, Melisa Dunbar, Sandra Lozito, Patricia Cashion, Alison McGann, Victoria.
1/14 Development and Evaluation of Prototype Flight Deck Systems for Distributed Air-Ground Traffic Management ASAS Thematic Network - Workshop 3 Toulouse,
Study Continuous Climb Operations
Federal Aviation Administration ASAS issues identified in the AP23 work ASAS-TN2.5 workshop 13 Nov 08, Rome By Jean-Marc Loscos, DSNA.
The SESAR Target Concept of Operations ASAS Related Aspects
ASSTAR User Forum #1 Rome 4th April 2006 ASAS-TN2 Second Workshop ASSTAR Safety Approach and Preliminary Issues Dr Giuseppe GRANIERO, SICTA
4 th Workshop, Amsterdam, 23 rd -25 th April 2007 ASAS LC&P Applications in Radar Airspace: Operational Scenario Example and Fast-Time Simulation Results.
ASAS-TN Second Workshop, 6-8 October 2003, MalmöSlide 1 Airborne Surveillance Applications included in ‘Package I’ Francis Casaux CARE/ASAS manager.
Episode 3 EP3 WP6 - Excom - December 15th, Brussels 1 WP6 - Technology EP3 Final Report Technology results December 2009.
An Automated Airspace Concept for the Next Generation Air Traffic Control System Todd Farley, David McNally, Heinz Erzberger, Russ Paielli SAE Aerospace.
ASAS FRA OB/T ATM Projects Lufthansa point of view.
2 nd ASAS-TN2 Workshop - Rome, 4 th April 20061/13 Civil-Military cooperation as a key factor in ASAS implementation Italian Air Force (IAF) Ltc. Maurizio.
1 Call Identifier : FP TREN-3 Thematic Priority 1.4 Aeronautics and Space ERASMUS project Project overview Aeronautical Days - Vienna June 2006 En.
IFly project: Airborne Self Separation as basis for advanced en route ATM Henk A.P. Blom iFly coordinator National Aerospace Laboratory NLR
Direction générale de l’Aviation civile centre d’Études de la navigation aérienne First ASAS thematic network workshop The user’s expectations and concerns.
MFF is a EC co-funded programme Rome, 3-5 Aprili 2006 ASAS-TN2 Rome, 3-5 April 2006 Maurizio Zacchei, ENAV (MFF PM) Mediterranean Free Flight Programme.
Federal Aviation Administration AP23 : a snapshot on Package2 ASAS-TN2 Seminar 14 April Paris By Dragos Tonea, Eurocontrol Roberta Massiah, FAA.
ADD Validation in NUP2Slide 1 AIRCRAFT DERIVED DATA FOR MORE EFFICIENT ATM OPERATIONS The validation work of NUP II ADD TT Costas TAMVACLIS EUROCONTROL.
Slide 1 July 2004 – FALBALA/WP5/FOR4/D – CENA, DFS, EEC, NATS, Sofréavia & UoG Mark Watson & Richard Pugh ( NATS) CARE / ASAS Action FALBALA Project Dissemination.
DIRECTION TECHNIQUE CERTIFICATION Paris, April 2008 SL ASAS TN2 Workshop ppt ASAS & Business.
Page 1 CARE/ASAS Activity 3: ASM workshop Brétigny, 19 December 2001 Time-Based Sequencing OSED CARE-ASAS Activity 3: ASM Time-Based Sequencing OSED.
CARE/ASAS Activity 2 Follow-up: Validation Framework Dissemination Forum Isdefe Ingeniería de Sistemas CARE/ASAS ACTIVITY 2 FOLLOW-UP: VALIDATION.
Glasgow 12 September 20061/22DEEP BLUE CONSULTING AND RESEARCH | CLAUDIA FUSAI ASAS-TN2 Controllers situational awareness issues.
A Cockpit Display Designed to Enable Limited Flight Deck Separation Responsibility Walter W. Johnson & Vernol Battiste NASA Ames Research Center Sheila.
4 th Workshop, Amsterdam, April 2007 page 1 ASPA-S&M in Paris ASPA-S&M in Paris: CRISTAL PARIS and PALOMA results Jean-Marc Loscos, DSNA.
CY Segment 1 Phase 1 Tower Services Initial En Route Services Departure Clearances (DCL) Transfer of Communications Initial Check-In.
Discussions Summary ASSTAR - Crossing & Passing session.
2 nd Workshop, April 2006 ASAS in Tomorrows Airspace Pierre Gayraud, THALES Bob Graham, EEC Tony Henley, BAe Systems Dr Anthony Smoker, IFATCA ASAS-TN2.
1 Airborne Separation Assistance Systems (ASAS) - Summary of simulations Joint ASAS-TN2/IATA/AEA workshop NLR, Amsterdam, 8 th October 2007 Chris Shaw.
USE OF INTENT INFORMATION IN AIRCRAFT CONFORMANCE MONITORING
1 Controller feedback from the CoSpace / NUP II TMA experiment ASAS-TN, April 2004, Toulouse Liz Jordan, NATS, U.K. Gatwick approach controller.
ASAS Crossing and Passing Applications in Radar Airspace (operational concept and operational procedure) Jean-Marc Loscos, Bernard Hasquenoph, Claude Chamayou.
ASSTAR Airborne Separation Operations in Oceanic Airspace Bob McPike, NATS ASAS-TN2 Conference Glasgow, September 2006.
ASAS TN Third Workshop, April 2004, Toulouse Session 1 Use of the System by pilots and controllers Tony Henley.
MFF is a EC Co-funded Programme  MEDITERRANEAN FREE FLIGHT Flight Trials Report ASAS TN2 1st Workshop | September 2005, Malmö Gennaro GRAZIANO 1/32.
Alberto Pasquini – Deep Blue Safety Assessment in MFF ASAS TN2 3-5 April 2006, Rome MENU: COVER | SUMMARY | OVERVIEW | TASKS | ALLOCATIONSCOVER SUMMARY.
4 th Workshop, Amsterdam, 23 rd -25 th April 2007 ASAS-SEP Applications Airborne Implementation Overall Architectural Considerations.
1 Roma, 3-5 April 2006 – ASAS TN2, 2 nd Workshop, Session 1 – When ASAS meets ACAS When ASAS meets ACAS Thierry Arino (Sofréavia, IAPA Project Manager)
ADVANCED AIR TRANSPORTATION TECHNOLOGIES DISTRIBUTED AIR/GROUND-TRAFFIC MANAGEMENT 5 th USA/Europe Air Traffic Management R&D Seminar Budapest June 2003.
5th USA/Europe ATM 2003 R&D Seminar, Budapest, Hungary Paper 59: Common Trajectory Prediction Capability for Decision Support Tools 1 Common Trajectory.
A traffic complexity approach through cluster analysis
ASSTAR Overview Jean-Marc Loscos, DSNA
Chris Shaw, EUROCONTROL Experimental Centre
Continuous Climb Operations (CCO) Saulo Da Silva
ASSTAR Oceanic Session Summary
Chris Shaw, EUROCONTROL Experimental Centre
Ground System implication for ASAS implementation
Karim Zeghal EUROCONTROL Experimental Centre
Crossing and Passing MA-AFAS
ASSTAR Project Overview & User Forum Objectives
Continuous Climb Operations (CCO) Saulo Da Silva
FAA and JPDO ASAS Activities
Environmentally Friendly Airport Systems (EFAS)
Presentation transcript:

Algorithm Design for Crossing and Passing Applications John Anderson and Colin Goodchild University of Glasgow, UK Thierry Miquel DSNA, Toulouse, France ASAS-TN2 2 nd Workshop Rome 3-5 April 2006

page 2 ASAS-TN2 2 nd Workshop, Rome 3-5 April 2006 Contents  Description of selected ASAS C&P applications –ASAS manoeuvre types –ASAS airborne operational logic –ASAS implementation and data sources  Synthesis of ASAS resolution manoeuvres –Approaches to conflict detection and resolution –Sources of uncertainty –Robust ASAS manoeuvres  Current status and planned activities

page 3 ASAS-TN2 2 nd Workshop, Rome 3-5 April 2006 ASAS C&P Applications in Radar Airspace  Selective C&P applications and operational procedures in radar airspace are defined in deliverables D1.1 and D1.3: ASAS C&P ApplicationASAS Manoeuvre Class  Co-altitude pass behind  Co-aItitude pass in-front  Climbing pass behind  Descending pass behind  Turning point route  Offset route

page 4 ASAS-TN2 2 nd Workshop, Rome 3-5 April 2006 Co-altitude Applications Turning Point RouteOffset Route

page 5 ASAS-TN2 2 nd Workshop, Rome 3-5 April 2006 Climb/Descent Applications

page 6 ASAS-TN2 2 nd Workshop, Rome 3-5 April 2006 Generic Features of ASAS C&P Applications

page 7 ASAS-TN2 2 nd Workshop, Rome 3-5 April 2006 Generic Features of ASAS C&P Applications  Finite time-horizon (lookahead time 5-10 minutes)  Fixed topology manoeuvre classes  Manoeuvre envelope constraints  Lateral manoeuvre requirement only  A priori specification of resolution manoeuvres via FMS/Autopilot with scope for limited adaptation following initiation of manoeuvre  Third-party aircraft assumed isolated from ASAS designated pair

page 8 ASAS-TN2 2 nd Workshop, Rome 3-5 April 2006 ASAS C&P Operational Phases Set-up Phase Identification Phase Clearance Phase Execution Phase Termination Phase Controller Flight Crew

page 9 ASAS-TN2 2 nd Workshop, Rome 3-5 April 2006 ASAS Airborne Operational Logic test conflict test resolution feasibility review delegation update resolution manoeuvre execute resolution manoeuvre test lateral separation test clear of traffic test deviation resume own navigation feasible not_feasible commit conflict no_commit no_conflict continue_delegation return_delegation clearance_issued conformance non_conformance clear no_deviation deviation not_clear separation no_separation clear_of_traffic_acknowledged Clearance Execution Termination ATCo responsible for separation Abort phase

page 10 ASAS-TN2 2 nd Workshop, Rome 3-5 April 2006 ASAS Resolution Implementation  Resolution control: –Point based (FMS) –Velocity based (Autopilot) NavigationControl Parameters FMS2D TCP’s AutopilotTV’s (Speed, Heading)

page 11 ASAS-TN2 2 nd Workshop, Rome 3-5 April 2006 ASAS Data Sources ADS-B messages from other aircraft ASAS algorithms Flight plan ASAS resolution controls Ownship navigation data and dynamics Aircraft performance Wind ASAS performance metrics Target ID ASAS application type ASAS manoeuvre class

page 12 ASAS-TN2 2 nd Workshop, Rome 3-5 April 2006 ASAS C&P Conflict Resolution Problem Given:  the initial/current conflict geometry and broadcast aircraft states  the clearance aircraft performance and manoeuvre envelope  a time-horizon dependent on the manoeuvre envelope Find:  the ‘best’ nominal resolution manoeuvre compliant with the required separation criterion, acceptable deviation constraints and acceptable level of operational performance. Given:  the initial/current conflict geometry and broadcast aircraft states  the clearance aircraft performance and manoeuvre envelope  a time-horizon dependent on the manoeuvre envelope Find:  the ‘best’ nominal resolution manoeuvre compliant with the required separation criterion, acceptable deviation constraints and acceptable level of operational performance. ‘Best’ = Safe + Efficient + Robust

page 13 ASAS-TN2 2 nd Workshop, Rome 3-5 April 2006 Synthesis of ASAS Resolution Manoeuvres  Conflict resolution algorithms (state-based) –Geometric (NLR/NASA FreeFlight, MA-AFAS, INTENT, MFF, DAG-TM) –Graph-based search –Simulation-based optimisation (HYBRIDGE)  Nominal trajectory models –Piecewise-linear (constant velocity) segments –Physical trajectory segments (eg co-ordinated turn segments, constant Mach/CAS segments)  Uncertainty models/Conflict metrics –Nominal/Minimum separation –Worst-case/Minimum separation of extremal bound –Probabilistic/Probability of conflict

page 14 ASAS-TN2 2 nd Workshop, Rome 3-5 April 2006 ASAS Manoeuvre Parameterisation I  Resolution manoeuvre parameterised by: –heading change α (discrete values) –heading change start time t 0 –heading change end time t 1

page 15 ASAS-TN2 2 nd Workshop, Rome 3-5 April 2006 ASAS Manoeuvre Parameterisation II S - Straight Line Segment T – Constant Radius Turn Segment  Resolution manoeuvre parameterised by (Vilaplana (2002)): –discrete mode sequence and switch times

page 16 ASAS-TN2 2 nd Workshop, Rome 3-5 April 2006 Sources of Uncertainty  Trajectory prediction errors resulting from: –Flight mode errors/uncertainty in climb/descent –Wind and (vertical) wind gradient uncertainty –Aircraft performance errors –Aircraft weight errors –Aircraft turn dynamics omission –Flight crew response latency –(Post-COT) intent errors –ADS-B failures and data anomalies

page 17 ASAS-TN2 2 nd Workshop, Rome 3-5 April 2006 Robust Resolution Manoeuvres  Robustness to uncertainty in environmental parameters and processes –Attempt to design ‘tolerance’ to uncertain environmental parameters in ASAS resolution manoeuvres while satisfying safety and efficiency criteria. –Minimise ‘false alarms’ and unnecessary manoeuvres –Maximise safety

page 18 ASAS-TN2 2 nd Workshop, Rome 3-5 April 2006 Features of Robust Resolution Environmental Parameters Cost Function Variation Feasible Infeasible Feasible Infeasible Optimal Robust

page 19 ASAS-TN2 2 nd Workshop, Rome 3-5 April 2006 Candidate ASAS CR Algorithms  Geometric and graph-based search methods fulfil the dual requirements of simplicity and transparancy in the real-time synthesis of ASAS resolution manoeuvres.  The additional requirement of robustness to uncertainties in environmental and flight mode parameters can be incorporated implicitly in a search-based approach to resolution synthesis.  Both geometric and search-based resolution methods offer scope for limited real-time adaptation of the ASAS manoeuvre.  Search-based resolution methods can be modified to accommodate trajectory segment models in both co-altitude and climb/descent applications.

page 20 ASAS-TN2 2 nd Workshop, Rome 3-5 April 2006 Planned Activities and Deliverables ActivityDeliverablePlanned Date Survey of candidate CD&R processes and algortihms. (UoG) D2.123/12/05 Implementation of geometric and graph-based search methods in ASAS test-bed. (DSNA/UoG) D2.212/01/07 Development of the ‘robust’ manoeuvre concept (with particular emphasis on climb/ descent applications). (UoG) D2.312/01/07 Preparation of algorithms for advanced simulation. (DSNA/UoG) D2.409/03/07