Adjusting Supply and Demand: Technical Analysis to Support the ESPA Management Plan Idaho Water Resource Board Meeting May 17, 2007.

Slides:



Advertisements
Similar presentations
J2 Regulating Reservoir Project
Advertisements

May 18, 2005 Oakdale Irrigation District Water Resources Plan.
LOGO Bangkok, May 2009 Water Resources Management in Ba River Basin under Future Development and Climate Scenarios Presented by: Nguyen Thi Thu Ha Examination.
Active Water Resource Management in the Lower Rio Grande TOOLS FOR A NEW ERA IN WATER MANAGEMENT presented by Peggy Barroll, Hydrologist New Mexico Office.
Henry's Fork Watershed Council Annual Watershed Conference Jon Bowling, P.E. December 9, 2014.
Hydrologic Analysis for CAMP Environment, Fish and Wildlife Working Group Briefing for ESHMC May 6, 2008.
Responses to the New Normal Creative Partnerships for Innovative Water Solutions Colorado Water Workshop – July 17, 2013.
2010 Water Supply Summary Liz Cresto Water Suppy Impacts to Water Management –Power Generation –Payette River Flooding –Boise River Irrigation –Snake.
Idaho Water Supply Committee Meeting Southwest Idaho Report March 8, 2012.
WRWSA Water Supply Plan Update Progress Report – (April 1- May 15) >Project Tasks 1.Water Demand Estimates 2.Availability of Ground- and Surface Water.
Comprehensive Aquifer Management and Planning Program Helen Harrington Idaho Department of Water Resources/ Idaho Water Resource Board October 16, 2008.
2007 Water Supply Summary Idaho Department of Water Resources.
Modeling the Snake River Basin Future Streamflow Scenarios and System Response for the Snake River Basin Update- Nathan VanRheenen Richard N. Palmer.
2007 Idaho Water and Climate Forecasts October 17, 2006 Hosted By Climate Impacts Group And Idaho Department of Water Resources.
WHY DAM THE COLORADO RIVER? BROUGHT TO YOU BY BRANDON DOZIER.
2001 April-July Runoff Bear Lake inflow 16.5 kaf 9 % of avg 8th lowest/ 75 years Snake R. nr Heise* % 4 / 91 Big Wood at Hailey % 5 / 74.
2005 Idaho Climate and Water Resource Forecast Sponsored by: Climate Impacts Group at the University of Washington and the Idaho Department of Water Resources.
2006 Idaho Climate and Water Resource Forecast Sponsored by: Climate Impacts Group at the University of Washington and the Idaho Department of Water Resources.
Comprehensive Aquifer Planning Program Status Update Helen Harrington October 22, 2009.
Idaho Water Resources Research Institute
Review of the 2009 Snowmelt and Rain Streamflow Forecasts & Snow Survey Advisory Team Ron Abramovich, Hydrologist Water Supply Specialist USDA Natural.
ESPA Comprehensive Aquifer Management Plan Presentation to the Governor’s Water Summit April 17, 2007 Idaho Water Resource Board Jonathan Bartsch and Diane.
SNAKE RIVER GROUND WATER TRANSFERS Climate Impacts Group May 13, 2003 Don Reading Richard Slaughter.
April 9, 2002 PNW Water Institutional Development Richard Slaughter, Ph.D. Don Reading, Ph.D. Climate Impacts Group University of Washington.
Nathan VanRheenen Richard N. Palmer Civil and Environmental Engineering University of Washington Recasting the Future Developing.
2007 Idaho Climate and Water Forecast Workshop Sponsored by: Climate Impacts Group at the University of Washington and the Idaho Department of Water Resources.
Yellowstone River Compact Commission Technical Committee Discussions Sheridan County Courthouse Sheridan, WY April 24, 2007 Bighorn Reservoir operations.
Hydropower Dams © The GlobalEd 2 Project Photo credit: Noodle snacks, Wikimedia Gordan Dam, a dammed hydro facility in Tasmania.
Eastern Snake Plain Comprehensive Aquifer Management Plan A Positive Path Forward Hal N. Anderson June 11, 2009.
Capacity Building in Analytical Tools for Estimating and Comparing Costs and Benefits of Adaptation Projects in the Berg River Basin, South Africa AIACC.
1 Regional Report San Joaquin River Hydrologic Region.
WaterSMART Basin Study Program. SECURE Water Act Section 9503 Directs the Secretary to establish a climate change adaptation program which includes –Assess.
Department of Natural Resources and Conservation, Water Resources Division State Water Projects Bureau Kevin B. Smith, P.E., Chief
Integrated Water Management Modeling Framework in Nebraska Association of Western State Engineers Spring Workshop Salt Lake City, Utah June 9, 2015 Mahesh.
Columbia River Water Management Program (CRWMP) Review of Year One Upper Crab Creek Planning Unit Meeting April 17, 2007.
2010 Yakima Basin Science & Management Conference Yakima River Basin Study June 16, 2010 Joel Hubble, Technical Projects Biologist Columbia-Cascades Area.
Honorable Eric J. Wildman, SRBA District Court Chris M. Bromley, Deputy Attorney General* * All opinions expressed herein are those of the presenter and.
Water Supply Reallocation Workshop Determining Yield and Space Requirement.
Colorado River Sustainability, Drought Response & Central Arizona Project Urban Water Institute August 27, 2015.
ESPA Comprehensive Aquifer Management Plan Public Meetings December 2, 4, Idaho Water Resource Board Jonathan Bartsch--CDR Associates.
Western Water Issues: The Challenges of Growth NARUC Water Committee Summer Meetings July 2008, Portland, Oregon Walton Hill, United Water.
Understanding Ground Water Modeling Gary Johnson Donna Cosgrove Idaho Water Resources Research Institute University of Idaho Idaho Falls.
Eastern Snake River Plain Comprehensive Aquifer Management Plan (CAMP) Progress Report ESHMC January 13, 2009.
 These slides were presented to the Hood River Basin Water Planning Group on May 1, 2013 by Jon Rocha and Jennifer Johnson.  Slides contain animations.
Chapter 33 Dam Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Give reasons why.
Short and Long Range Water Supply Planning and Aquifer Performance Test (APT)
Idaho Water Supply Committee Meeting Southwest Idaho Report March 14, 2014.
Presented By: David Richards Idaho Falls Water Superintendent MUNICIPAL WATER RIGHTS A LOOK AT HOW THE CONJUCTIVE MANAGEMENT RULING IMPACTS TODAY’S MUNICPAL.
SOUTH METRO WATER SUPPLY STUDY DECEMBER 2003 Stretching our Water Supplies South Metro Denver Area Gunnison Water Conference July 28, 2004.
HISTORICAL OVERVIEW OF CONJUNCTIVE ADMINISTRATION OF ESPA WATER SOURCES PREPARED BY CLIVE J. STRONG FOR GOVERNOR’S WATER SUMMIT APRIL 17, 2007.
Assign Annual Demand for a Purpose CALSIM Simulation Compare the Long-term Average Annual Friant Unit Delivery to Benchmark Study CALSIM Simulation Completed.
South Platte Decision Support System Colorado Water Conservation Board and Division of Water Resources.
Mountain Home Plateau Ground Water Conditions and Management Activities Presented to the Idaho Legislature Natural Resources Interim Committee By Helen.
February SNOTEL Precipitation as % of Average Idaho SNOTEL Precipitation March 1-14 compared to normal March Total are: 130% in Weiser % north,
Jeff Raybould, Idaho Water Resource Board December 9,2014 Idaho Council on Industry & Environment Statewide Trends for Water Supply State Water Plan Henrys.
US Army Corps of Engineers BUILDING STRONG ® Boise River Feasibility Study Ellen Berggren, PMP Outreach Coordinator/ Project Manager Idaho Governor’s Roadless.
March 21, 2006 Engrossed Second Substitute House Bill 2860 Columbia River Basin – Water Supply Keith Holliday Watershed Lead Washington State Dept. of.
Withlacoochee Regional Water Supply Authority Final Water Supply Plan Update July 2014.
Water Supply Planning in Hampton Roads: Options for an Uncertain Future The State of Virginia’s Water Resources October 28, 2015 Whitney S. Katchmark,
BASIN SCALE WATER INFRASTRUCTURE INVESTMENT EVALUATION CONSIDERING CLIMATE RISK Yasir Kaheil Upmanu Lall C OLUMBIA W ATER C ENTER : Global Water Sustainability.
ESPA Comprehensive Management Plan Framework Development Natural Resource Interim Legislative Committee July 12, 2006 Jerry Rigby Chairman Idaho Water.
Hydrology and Water Resources Engineering ( ) Government Engineering College Rajkot Civil Engineering Department Faculty Guide: Prof V.G.Yadav DROUGHT.
Climate Change Threat Reduced Snowpack 1. Potential Impacts Related to Reduced Snowpack How might our community be impacted by reduced snowpack? 2.
Idaho's Complex Water Issues in the Eastern Snake River Plain Aquifer: Underground Rivers, Increasing and Decreasing Groundwater and Spring Levels, Human.
Tom Buschatzke Director Arizona Department of Water Resources
2017 Llano Estacado Regional Water Plan Planning Group Meeting
Potholes Supplemental Feed Route Project
10.3 Ground water supply.
Status after Second Year of Work Implementing the Recommendations of the Santa Cruz Water Supply Advisory Committee Joint Meeting Santa Cruz City Council.
Gathering Background Information and the Role of Technicians
Presentation transcript:

Adjusting Supply and Demand: Technical Analysis to Support the ESPA Management Plan Idaho Water Resource Board Meeting May 17, 2007

Technical Study Tasks Staff has identified 18 technical tasks to be undertaken in support of the ESPA Comprehensive Aquifer Management Plan. Additional tasks could be added if needed. The tasks are not listed in any preferred order.

Task No. 1 - High Lift Exchange Water Availability This would involve acquiring “high-lift” water rights below Milner Dam and using this water to exchange with water being released from Upper Snake reservoirs by the Bureau of Reclamation for flow augmentation. The exchanged water could then be delivered to recharge or to conversion projects.

Task No. 2 – Quantify Excess Flow Past Milner Dam This would quantify the excess flow past Milner Dam that is not being delivered for a specific purpose. This would be done both constrained and unconstrained by the Milner Dam hydropower water right. Currently, aquifer recharge would be junior to the Milner hydropower right, but new surface storage would be senior to the Milner hydropower right.

Task No. 3 – Quantify Excess Flow in Wood Rivers Basin This would quantify the excess flow in the Wood Rivers Basin available for aquifer recharge.

This would involve acquiring surface water (high-lift exchange, new storage, rental pool, etc.) and delivering it into canal systems with large numbers of supplemental wells. This added supply could then offset the use of the supplemental wells. Task No. 4 – Soft Conversion Projects

Task No. 5 – Hard Conversion Projects This would involve acquiring surface water but would require construction of new infrastructure to deliver the surface water into areas that only have ground water supplies, such as the A&B Irrigation District.

Task No. 6 – Surface Water Storage Alternatives in Upper Snake Basin Review past studies of potential reservoir sites in the Upper Snake Basin, index the costs to current levels, and identify any fatal flaws. The stored water could be delivered to conversion projects or to offset shortages.

Task No. 7 – Additional Payette Rental Pool Use Evaluate making additional use of the Payette Basin Rental Pool to supply flow augmentation, reducing the burden of the Upper Snake Rental Pool to provide flow augmentation. This could free up water in the Upper Snake that could be delivered to conversions, recharge, or shortages.

Task No. 8 – Surface Water Storage in Southwest Idaho Basins Review past studies of potential reservoir sites in the Boise, Payette, and Weiser Basins, index the costs to current levels, and identify any fatal flaws. The stored water could be used to reduce the burden of the Upper Snake Rental Pool to provide flow augmentation, freeing up water to be delivered to conversions, recharge, or shortages. Could also provide local benefits within these basins.

Task No. 9 – Aquifer Recharge Evaluate the amount of recharge that can be accomplished and the costs of facilities needed to accomplish recharge.

Task No. 10 – Thousand Springs Water Management Projects A number of potential projects in the Thousand Springs have been identified. Evaluate these projects, index costs to current levels, determine amount of water that could be gained, and willingness of owners to participate. Evaluate feasibility of constructing flowing artesian wells.

Task No CREP CREP is underway but will be part of the overall plan. Evaluate effects of CREP on aquifer. Task No. 12 – Evaluation of Crop Mix Changes on Consumptive Use of Water Analyze changes to ESPA water budget from changes in cropping patterns on Eastern Snake Plain.

Task No. 13 – Evaluate Potential Impacts of Climate Change on timing and Magnitude of Surface Flows in Upper Snake Basin Climate change may impact the amount and the timing of surface runoff in the Upper Snake. Task No. 14 – Weather Modification Evaluate the potential for weather modification (cloud seeding) to be a part of the overall plan.

Task No. 15 – Evaluate Water Right Purchases in Upper Snake Evaluate costs and willingness of owners to sell existing surface water and ground water rights in the Upper Snake Basin.

Task No. 16 – Generate Alternatives Combine various options into several alternatives based on cost effectiveness, water budget response, and political acceptance Task No. 17 – Economic Analysis Analyze benefits and costs of alternative plans Task No. 18 – Preferred Plan Select preferred plan based on economic analysis of alternatives, water budget response, and advisory committee recommendations

Questions ?