CERN IT Department CH-1211 Genève 23 Switzerland www.cern.ch/i t GT From GD to GT Grid Technology.

Slides:



Advertisements
Similar presentations
OMII-Europe Repository Steven Newhouse Director, OMII-UK.
Advertisements

CERN IT Department CH-1211 Genève 23 Switzerland t IT/DM (Data Management) Group meeting Alberto Pace.
The Middleware Readiness Working Group LHCb Computing Workshop LHCb Computing Workshop Maria Dimou IT/SDC 2014/05/22.
Site report: CERN Helge Meinhard (at) cern ch HEPiX fall SLAC.
Grid Technology CERN IT Department CH-1211 Geneva 23 Switzerland t DBCF GT Simplifying Configuration Ricardo Rocha ( on behalf of the LCGDM.
CERN IT Department CH-1211 Genève 23 Switzerland t Messaging System for the Grid as a core component of the monitoring infrastructure for.
CERN - IT Department CH-1211 Genève 23 Switzerland t Monitoring the ATLAS Distributed Data Management System Ricardo Rocha (CERN) on behalf.
EMI SA2: Quality Assurance (EMI-SA2 Work Package) Alberto Aimar (CERN) WP Leader.
EMI INFSO-RI EMI SA2 Report Quality Assurance Alberto Aimar (CERN) SA2 WP Leader.
EMI INFSO-RI EMI Quality Assurance Processes (PS ) Alberto Aimar (CERN) CERN IT-GT-SL Section Leader EMI SA2 QA Activity Leader.
CERN IT Department CH-1211 Genève 23 Switzerland t Internet Services GS group meeting Monitoring and Dashboards section Activity.
EMI is partially funded by the European Commission under Grant Agreement RI Post EMI Plans and MeDIA Alberto DI MEGLIO, CERN Project Director WLCG.
EMI INFSO-RI SA2 - Quality Assurance Alberto Aimar (CERN) SA2 Leader EMI First EC Review 22 June 2011, Brussels.
CERN IT Department CH-1211 Genève 23 Switzerland t ITIL at CERN Tony Cass HEPiX LBL, 29 th October 2009.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks General relationships with EGEE JRA1 SA3.
CERN IT Department CH-1211 Geneva 23 Switzerland t Open projects in Grid Monitoring IT-GS-MDS Section Meeting 25 th January 2008.
CERN IT Department CH-1211 Genève 23 Switzerland t MSG status update Messaging System for the Grid First experiences
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks GStat 2.0 Joanna Huang (ASGC) Laurence Field.
EMI is partially funded by the European Commission under Grant Agreement RI SA2 – Quality Assurance Alberto AIMAR (CERN) SA2 Leader EMI Second EC.
Impact of end of EMI+EGI-SA3 April 2013: EMI project finishes EGI-Inspire-SA3 finishes (mainly CERN affected) EGI-Inspire continues until April 2014 EGI.eu.
EGEE’06 Conference Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Testing gLite middleware: overview & status Andreas.
CERN IT Department CH-1211 Geneva 23 Switzerland t GDB CERN, 4 th March 2008 James Casey A Strategy for WLCG Monitoring.
CERN IT Department CH-1211 Genève 23 Switzerland CERN IT Department Overview of Activities Frédéric Hemmer IT Department Head CERN 10 February.
Apr 26, 20071/3 OSG Executive Board Meeting Gabriele Garzoglio OSG Executive Board Meeting Gabriele Garzoglio VO Services, PL Computing Division, Fermilab.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Wojciech Lapka SAM Team CERN EGEE’09 Conference,
Andres Abad Rodriguez. What is it? It is a 2 weeks summer computing school open to post graduate students and research workers organized by CERN It is.
CERN IT Department CH-1211 Geneva 23 Switzerland t CCRC’08 Tools for measuring our progress CCRC’08 F2F 5 th February 2008 James Casey, IT-GS-MND.
CERN - 27th May 2013 Welcome to CERN CERN Computer Center IT department Collaboration and Information Services Communication Systems Computing Facilities.
CERN IT Department CH-1211 Genève 23 Switzerland t 24x7 Service Support Tony Cass LCG GDB, 24 th November 2009.
EMI INFSO-RI Guidelines and SQA Process Maria Alandes Pradillo (CERN) SA2.2 Task Leader.
CERN IT Department CH-1211 Genève 23 Switzerland t DM Database Monitoring Tools Database Developers' Workshop CERN, July 8 th, 2008 Dawid.
EMI INFSO-RI SA1 Session Report Francesco Giacomini (INFN) EMI Kick-off Meeting CERN, May 2010.
CERN IT Activities Ian Bird IT Department & WLCG Project Leader
CERN IT Department CH-1211 Geneva 23 Switzerland t A proposal for improving Job Reliability Monitoring GDB 2 nd April 2008.
ATP Future Directions Availability of historical information for grid resources: It is necessary to store the history of grid resources as these resources.
CERN IT Department CH-1211 Genève 23 Switzerland t Bob Jones 28 th November 2012 Preparing for Horizon 2020.
EMI INFSO-RI European Middleware Initiative (EMI) Alberto Di Meglio (CERN)
EMI INFSO-RI Software Quality Assurance in EMI Maria Alandes Pradillo (CERN) SA2.2 Task Leader.
CERN IT Department CH-1211 Genève 23 Switzerland t Experiment Operations Simone Campana.
EMI INFSO-RI EMI Data EMI Data, the unified European Data Management Middleware Patrick Fuhrmann (DESY) EMI Data Area lead.
CERN IT Department CH-1211 Genève 23 Switzerland t CERN IT Monitoring and Data Analytics Pedro Andrade (IT-GT) Openlab Workshop on Data Analytics.
EMI INFSO-RI Technical Overview Balázs Kónya (Lund University) Technical Director 1 st EMI Periodic Review Brussels, 22 June 2011.
Grid Technology CERN IT Department CH-1211 Geneva 23 Switzerland t DBCF GT Grid Technology SL Section Software Lifecycle Duarte Meneses.
CERN - IT Department CH-1211 Genève 23 Switzerland t Service Infrastructure EMI Kickoff Meeting.
GD Plans for 2006 Ian Bird IT-GD IT PoW, November
CERN IT Department CH-1211 Geneva 23 Switzerland t James Casey CCRC’08 April F2F 1 April 2008 Communication with Network Teams/ providers.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Status and outlook for testing in the LCG.
My Jobs at CERN April 2015 My Jobs at CERN2
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Implementing product teams Oliver Keeble.
CERN - IT Department CH-1211 Genève 23 Switzerland t IT-GD-OPS attendance to EGEE’09 IT/GD Group Meeting, 09 October 2009.
EMI is partially funded by the European Commission under Grant Agreement RI EMI SA2 Report Andres ABAD RODRIGUEZ, CERN SA2.4, Task Leader EMI AHM,
Ian Bird LCG Project Leader Status of EGEE  EGI transition WLCG LHCC Referees’ meeting 21 st September 2009.
EMI INFSO-RI SA2: Quality Assurance Status Report Alberto Aimar(SA2) SA2 Leader EMI First EC Review 22 June 2011, Brussels.
EMI INFSO-RI European Middleware Initiative (EMI) Alberto Di Meglio (CERN) Project Director.
Pedro Andrade > IT-GD > D4Science Pedro Andrade CERN European Organization for Nuclear Research GD Group Meeting 27 October 2007 CERN (Switzerland)
Grid Technology CERN IT Department CH-1211 Geneva 23 Switzerland t DBCF GT Our experience with NoSQL and MapReduce technologies Fabio Souto.
CERN IT Department CH-1211 Genève 23 Switzerland t EIS Section input to GLM For GLM attended by Director for Computing.
CERN - IT Department CH-1211 Genève 23 Switzerland t Improving CERN AV Workflow 13 nth December 2010 Thomas Baron, Jacques Fichet, Tim Smith.
Implementation of GLUE 2.0 support in the EMI Data Area Elisabetta Ronchieri on behalf of JRA1’s GLUE 2.0 Working Group INFN-CNAF 13 April 2011, EGI User.
JRA1 Middleware re-engineering
Bob Jones EGEE Technical Director
Helge Meinhard / CERN-IT HEPiX Spring 2010 “LIP Lisbon” 19 April 2010
E-Infrastructure for Testing, Integration and Configuration of Software Alberto Di Meglio CERN, INFN, Engineering, 4D Soft, University of Wisconsin.
SA2: Quality Assurance Status Report
IT-GT meeting, Friday 1st October Maria Alandes Pradillo, CERN
A Messaging Infrastructure for WLCG
Virtualization in the gLite Grid Middleware software process
GLUE 2 Support in gLite Data Management
SL Section Software Lifecycle Duarte Meneses
Presentation transcript:

CERN IT Department CH-1211 Genève 23 Switzerland t GT From GD to GT Grid Technology

Reorganization New Structure –Communication Systems – Jean-Michel Jouanigot –Computing Facilities – Wayne Salter –Database Services – Tony Cass –Desktop and Internet Services – Christian Isnard –Experiment Support – Jamie Shiers –Grid Technology– Markus Schulz –Platform and Engineering Services – Helge Meinhard –Data and Storage Services – Alberto Pace –User and Document Services – Tim Smith –Departmental Infrastructure – Alan Silverman

Reorganization What is new? –Communication Systems – Jean-Michel Jouanigot –Computing Facilities – Wayne Salter –Database Services – Tony Cass –Desktop and Internet Services – Christian Isnard –Experiment Support – Jamie Shiers –Grid Technology– Markus Schulz –Platform and Engineering Services – Helge Meinhard –Data and Storage Services – Alberto Pace –User and Document Services – Tim Smith –Departmental Infrastructure – Alan Silverman

Reorganization Motivation –Transition from ramp up to operation –Over the time some groups “collected” functions on different levels –Some groups have grown, other will shrink –Some duplication of services –End of EGEE X Projects New projects have a different character CERN’s role is very different in new projects –ITIL New structure is intended to match better ITIL concepts

Reorganization Next Steps –New Group Leaders will contact you and discuss new roles –Group Leaders will discuss services and names –At an extra POW ( around December 9 th ) Conflicts resolved Structure agreed –  until then changes are relatively easy –Paperwork…… –1 st January: New IT Structure in place

Grid Technology Grid Data Management –FTS, DPM, LFC, Client Tools, ……… Grid Information Systems –BDII, clients Messaging Services Grid Monitoring Infrastructure, Software and Services –Monitoring for WLCG SAM, Gstat, Gridview….. EMI –Project Director ( Alberto Di Meglio ) –SA2 Activity ( QA ) –Product teams: Several DM components Messaging

Grid Technology Most of the current EU project functions stay with us –SA3 Activity leader –SA1 Activity leader ( moves, but we will contribute) –JRA1 Activity leader –ETICS roles  Transition will require work across group boundaries –And complex prioritization

Grid Technology: Section Structure This is preliminary (most likely incomplete) and will change!!!!! GT –Group Leader: M.Schulz Deputy: Oliver Keeble –Francesco Giacomini ( EGEE JRA1 ) –Alberto Di Meglio ( EMI Director and ETICS Director) –Visitors and external collaborators GT-DMS Data Management Software –Sl: Oliver Keeble GT-SL Software Life-cycle –SL: Alberto Aimar GT-TOM Tools for Operations, Monitoring –SL: James Casey GT-OPS Operations –SL: Nick Thackray

Grid Technology: Section Structure GT-DMS Data Management Software Sl: Oliver Keeble –Jean-Philippe BAUD –Ricardo Manuel BRITO DA ROCHA –Akos FROHNER –Rosa Maria GARCIA RIOJA –Gilbert GROSDIDIER –Lukasz JANYST –Andrey KIRYANOV –Zsolt MOLNAR –David Hugh SMITH –Adam Mikolaj ZABROCKI –Alejandro ALVAREZ AYLLON –Louis PONCET –Andrea MANZI –Pedro Manuel RODRIGUES DE SOUSA ANDRADE

Grid Technology: Section Structure GT-SL Software Life-Cycle SL: Alberto Aimar –Andres ABAD RODRIGUEZ –Maria ALANDES PRADILLO –Lorenzo DINI –Andrew David ELWELL –Victor GALAKTIONOV –Pablo GUERRERO ROSEL –Ricardo MENDES –Gianni PUCCIANI –Alberto RESCO PEREZ –Andreas UNTERKIRCHER –Tomasz WOLAK – Marian Jozef ZUREK

Grid Technology: Section Structure GT-TOM Tools for Operations, Monitoring SL: James Casey –Vinod Kumar BOPPANNA –Phool CHAND –David COLLADOS POLIDURA –Lionel CONS –Karolis EIGELIS –Laurence FIELD –David Jesus HORAT FLOTATS –Hui-Tzu HUANG –Pradyumna Shrikant JOSHI –Wojciech LAPKA –Massimo PALADIN –Konstantin SKABURSKAS –Danica STOJILJKOVIC –Judit NOVAK

Grid Technology: Section Structure GT-OPS Operations SL: Nick Thackray –Diana BOSIO –Farida NAZ –Antonio RETICO