CMWG Update to WMS 7-15-12 Report of CMWG Meeting of 8-13-12 M Wagner Edison Mission Marketing & Trading.

Slides:



Advertisements
Similar presentations
Additional CREs to address Stability Limits Beth Garza TAC June 26, 2008.
Advertisements

Ancillary Services and SCED Jeff Gilbertson Market Analyst Congestion Management Working Group 9/4/2013.
Discussion: Use of RAPs in system operations Kris Dixit 1.
RCWG Update to WMS April 9, VCMRR-VC for Cancellation of RUC Committed Resources Paragraph (3) of Nodal Protocol Section regarding Cancellation.
February 2012 CMWG Constraints Competitiveness Tests (CCT)
NPRRs NPRR680 Allow QSEs to Self-Arrange AS Quantities Greater Than Their AS Obligation. This Nodal Protocol Revision Request (NPRR) proposes to allow.
May 29, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott June 3, 2014 TAC Update to RMS 1.
Congestion Revenue Rights Activity Calendar Update Donald House CMWG September 19, 2014.
December 2, 2011 QMWG Summary of Potential Issues with NPRR385 Price Floor ERCOT.
July 30, 2015 TAC Meeting Update to COPS Michelle Trenary August 12, 2015.
COMMUNICATIONS AND SETTLEMENTS WORKING GROUP (CSWG) April 2015 Update to COPS.
January 14, New logic and invoices used in January 2015 when closing out December 2014 New Bill Determinants: CRRBAFA- CRR Balancing Account Fund.
Market Mitigation Concept Group Update Jim Galvin April 26, 2004.
SPS policy – Information Presentation Presentation to ROS June 16, 2004.
April, 2008 Maximum Shadow Price. April, 2008 Protocol Requirement: Transmission Constraint Management (2)ERCOT shall establish a maximum Shadow.
John Dumas Director of Wholesale Market Operations Jeff Billo Manager of Mid Term Planning Dan Jones Director with Potomac Economics, the ERCOT IMM Board.
March 26, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott April 7, 2015 TAC Update to RMS 1.
NPRR385, Security Violation Analysis and Reporting and Negative Price Floor WMS Meeting February 15, 2012.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee August 7, 2008.
April 28, 2008 Constraint Competitiveness Tests, an Overview Congestion Management Working Group.
Lead from the front Texas Nodal 1 TPTF Update for TAC March 8, 2007 Trip Doggett.
September 2012 Wholesale Market Subcommittee Report to Technical Advisory Committee.
Quick Start Resource – Payment for Start-Up at less than LSL Current NPRR language: ( 8) If a QSGR comes On-Line as a result of a Base Point less than.
1 Reliability Deployment Task Force (RDTF Meeting) December 20 th 2011 December 20, 2011.
RCWG Update to WMS July 11, Alternatives to Address Negative Prices At its June meeting, WMS directed RCWG to bring back something to vote on. RCWG.
ERCOT, Market Analysis 2013 Annual Constraint Competitiveness Test (CCT) Study Results – Update for 8/27/12 CMWG 8/27/2012 ERCOT Public.
Competitive Constraints/ Protocols 3.19 Presented to CMWG 10/14/2011 Steve Reedy, Manager, CRR.
Congestion Management Working Group WMS update 11/7/2012.
Resource Cost Working Group October 7, 2015 WMS Update.
July 30, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott August 4, 2015 TAC Update to RMS 1.
2% Shift Factor rule and associated price discrepancies Kris Dixit 1.
Commercial Operations Subcommittee Update to TAC September 7, 2012 Harika Basaran, COPS Chair 2012 Jim Lee, COPS Vice Chair 2012.
CMWG Update to WMS Report of CMWG Meetings of &
Item 3: PRS Report John Varnell 2013 PRS Chair Technical Advisory Committee (TAC) Meeting ERCOT Public November 7, 2013.
Wholesale Market Subcommittee Update May 2 nd, 2013 Technical Advisory Committee.
Report to TAC July In Brief Working Group Reports Working Group Reports CMWG CMWG DSWG DSWG MCWG MCWG MWG MWG QMWG QMWG VCWG VCWG Task Forces Task.
CMWG NATF 11/02/2010- CCT/DME update + Outages in the CRR Model follow-up Steve Reedy – Market Design and Analysis 1.
ERCOT Guideline for Interim Updates to the Network Operations Model Excerpted from the “Modeling Expectations” whitepaper D.W. Rickerson.
Congestion Management Work Group Update WMS I Flores, S Reedy—ERCOT M Wagner--PSEG TX.
ROS July 10, 2008 Meeting WOTF Update on ROS Action Plan Summary: EECP Step #2 (Feb.26 th, 2008) Mark Garrott WOTF Chair.
Protocol Revision Subcommittee Rob Bevill January 5, 2012.
1 WMS Report TO TAC April 2007 (which is in March)
Technical Advisory Committee Presentation to the ERCOT Board of Directors September 16, 2008.
CMWG Update to WMS Report of CMWG Meeting of M. Wagner Edison Mission Marketing & Trading Thanks to ERCOT Staff for Graphics See ERCOT.
Constraints Competitiveness Tests (CCT) Results Analysis of 2010 SSWG Peak Summer Case Presented to CMWG 1/27/2010.
August 2012 Wholesale Market Operations Constraints Competitiveness Tests (CCT) – Annual CCT 2013 Study Result with New Approach Market Support and Analysis.
CMWG Update to WMS M Wagner Edison Mission Marketing & Trading.
Discussion on FGR Settlement Protocol Language David Maggio CMWG February 17, 2014.
Joint PLWG/CMWG Assignment Update to ROS September 15, 2011.
WMS 1/9/20131 Priority Power Management, LLC Proposed Changes to Holistic Solution WMS January 9, 2013 James Z. Brazell Law Office of James Z. Brazell.
December 2010 Wholesale Market Subcommittee Report to Technical Advisory Committee.
2% Shift Factor dispatchable rule discussion and alternatives for the 2% rule Kris Dixit 1.
CMWG Update to WMS Report of CMWG Meeting of
June 26 and July 31, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott August 5, 2014 TAC Update to RMS 1.
11/3/2011 Technical Advisory Committee TAC Update Kyle Patrick.
NPRR 520 Resmi Surendran ERCOT. Current CCT Process Annual CCT (ACCT) is run every year to feed the results to Monthly CCT (MCCT) MCCT is run every month.
RCWG Update to WMS March 7, Draft NPRR, Caps and Floors for Energy Storage Resources Chair of ETWG gave high level overview ERCOT had questions.
Day-Ahead Market Discussion/Clarification TPTF April 24, 2006.
Proposal for Consideration Regarding Holistic Solution to Congestion Irresolvable in SCED Issue:How do you identify when constraint is irresolvable Proposal:Adopt.
TPTF Update Trip Doggett TAC March 9, TPTF Update Meetings February 6 & 7, February 20 Attendance approximately 40 Completed review of ERCOT’s clarification.
Congestion Management Work Group 2008 Overview CMWG Marguerite Wagner, Reliant Energy Inc.
Texas Congestion Management Work Group Update For WMS Marguerite Wagner, PSEG Texas.
TAC Update Kyle Patrick. 2 Nodal ERCOT Program Update –Nodal Market Go-Live (Vote)- vote passed in which TAC certified full nodal systems for Dec 1, 2010.
NPRR784 Mitigated Offer Caps for RMR Units Protocol Revision Subcommittee June 16,
Reliability Must Run Workshop RMR Study Process May 24, 2016.
Market Trials Update NATF March 2,
Exceptional Fuel Costs in LMP
Southern Cross Directives Planning Items
ERCOT CRR Update to CMWG
Load Distribution Factor Calculation for Market Applications and Studies a Presentation for NATF 9/21/ NATF 1 Texas Nodal.
Presentation transcript:

CMWG Update to WMS Report of CMWG Meeting of M Wagner Edison Mission Marketing & Trading

2% Shift Factor Cut Off – WMS Directive Modified Section 3.3 of Shadow Price Cap OB Document—added a sentence: “ERCOT shall not employ a shift factor cutoff in dispatch which is greater than ” CMWG recommends forwarding document to TAC for endorsement (and sending to BOD for approval).

Issues Raised in 2011 State of Mkt Rept Overmitigation in SCED (P 30 of Exec Summ) – Short Term—stakeholders will work on Draft NPRR incorporating IMM proposal/IMM presentation to be developed for discussion at CMWG next month Based on changing mitigated curve of affected resources to what was called “capped and bounded prime”: Max (MOC, Ref1 + MOC * 0.01) – Long Term—send issue to METF Constraint Activiation (P 51 ) – Still going on (loading above 100% but not active and no RAPs, etc.) but less frequent in 2012 than 2011 – Implementation of NPRR 393 posting in mid 2013 will allow ERCOT Operators to put in reasons in for not activating – ERCOT working on NPRR to eliminate constraint relaxation requirement in EEA

Is ERCOT Using RAPs to Control Outside Contingency/Constraint Pair for which Defined? Remedial Action Plans (RAPs) defined for specific constraint/contingency pair(s) Allows ERCOT to run system at higher loading than would w/o RAP because RAP institutionalizes plan of action for contingency if loading reaches 15 min level If RAPs are used to control outside of definition (is this occurring?)—market has limited insight into what is going on

RAP Discussion Ct’d Communication Issue Pricing issue—when RAPs are used, constraints may not be activated—yet Transmission Planning tries to come up with upgrades to eliminate RAPs Upgrades are not reliability driven—because RAP solves loading issue Without pricing history, how can projects be justified economically? Even though there are RAPs, should constraint be activated, to create market solution?

W—N DA Limit Aug 5-7 DA limit dropped (relative to RT) noticeably – There was a calculation error in process for developing DA limits—has been fixed – Process: Some averaging of 30 day lookback of RT management level of W—N relative to actual limit used to develop DA limits for 2 days forward Discussion on fact that W—N is derated DA but N—H is not, ERCOT committed to developing data on W—N capability vs actual flows

Does WMS need a list for 2013 developed before the updated protocol language can be implemented which may not be until Q1 2013? – If yes, need to develop alternative methodology – If yes and want in time for annual CRR auction— needs to have WMS recommendation for 9/6 TAC – If no, do we want to designate any constraints competitive for 2013 prior to implementation of new language? – If no, potentially could sync up definitions with new CRR auction methodology in Q Constraint Competitiveness Test for 2013—WMS Decision Points

Constraint Competitiveness Test for 2013 ERCOT not able to implement revised CCT by end of year. Does WMS want a list of Competitive Constraints for 2013 based on “alternative method”? 3.19 Constraint Competitiveness Tests (1) The Technical Advisory Committee (TAC) shall consider the results of the Constraint Competitiveness Tests (CCTs) and other relevant factors in reaching its determination as to whether or not a Transmission Element pair should be determined to be a Competitive Constraint. Any contingency/limiting Transmission Element pair not designated as a Competitive Constraint shall be deemed to be a Non-Competitive Constraint. (2) The appropriate TAC subcommittee may develop an alternative list through the analysis described below for determining Competitive Constraints.

ERCOT developed an interim method – CMWG discussed options for ECI threshold—support for keeping annual threshold same as existing values in protocols Model to use for test—should it be multiple models or single model? SSWG or CRR Model (CMWG did not oppose using CRR Model) – Gray boxed recommends 12 monthly models vs. interim proposal to use single peak monthly case (WMS decision point) Overloadability test– should line that cannot be overloaded be deemed automatically competitive or noncompetitive— or should the Pivotal Player tests be done first and then overloadability test? Constraint Competitiveness Test for 2013