Calculating Risk of Cost Using Monte Carlo Simulation with Fuzzy Parameters in Civil Engineering Michał Bętkowski Andrzej Pownuk Silesian University of.

Slides:



Advertisements
Similar presentations
Tests of Hypotheses Based on a Single Sample
Advertisements

Design of Experiments Lecture I
Structural reliability analysis with probability- boxes Hao Zhang School of Civil Engineering, University of Sydney, NSW 2006, Australia Michael Beer Institute.
Reliable Dynamic Analysis of Structures Using Imprecise Probability Mehdi Modares and Joshua Bergerson DEPARTMENT OF CIVIL, ARCHITECTURAL AND EVIRONMENTAL.
SE503 Advanced Project Management Dr. Ahmed Sameh, Ph.D. Professor, CS & IS Project Uncertainty Management.
CmpE 104 SOFTWARE STATISTICAL TOOLS & METHODS MEASURING & ESTIMATING SOFTWARE SIZE AND RESOURCE & SCHEDULE ESTIMATING.
Sensitivity Analysis In deterministic analysis, single fixed values (typically, mean values) of representative samples or strength parameters or slope.
Fundamentals of Data Analysis Lecture 12 Methods of parametric estimation.
1 1 Slide © 2008 Thomson South-Western. All Rights Reserved Chapter 9 Hypothesis Testing Developing Null and Alternative Hypotheses Developing Null and.
Uncertainty in Engineering The presence of uncertainty in engineering is unavoidable. Incomplete or insufficient data Design must rely on predictions or.
Chapter 11- Confidence Intervals for Univariate Data Math 22 Introductory Statistics.
Structural Reliability Analysis – Basics
Engineering Economic Analysis Canadian Edition
Approaches to Data Acquisition The LCA depends upon data acquisition Qualitative vs. Quantitative –While some quantitative analysis is appropriate, inappropriate.
Visual Recognition Tutorial
Maximum likelihood (ML) and likelihood ratio (LR) test
ENBIS/1 © Chris Hicks University of Newcastle upon Tyne An analysis of the use of the Beta distribution for planning large complex projects Chris Hicks,
Maximum likelihood Conditional distribution and likelihood Maximum likelihood estimations Information in the data and likelihood Observed and Fisher’s.
Maximum likelihood (ML) and likelihood ratio (LR) test
CSE 221: Probabilistic Analysis of Computer Systems Topics covered: Confidence intervals.
Simulation.
Statistics and Probability Theory Prof. Dr. Michael Havbro Faber
3-1 Introduction Experiment Random Random experiment.
- 1 - Summary of P-box Probability bound analysis (PBA) PBA can be implemented by nested Monte Carlo simulation. –Generate CDF for different instances.
Inferences About Process Quality
Copyright (c) 2004 Brooks/Cole, a division of Thomson Learning, Inc. Chapter 7 Statistical Intervals Based on a Single Sample.
Lecture II-2: Probability Review
Monté Carlo Simulation MGS 3100 – Chapter 9. Simulation Defined A computer-based model used to run experiments on a real system.  Typically done on a.
1 Assessment of Imprecise Reliability Using Efficient Probabilistic Reanalysis Farizal Efstratios Nikolaidis SAE 2007 World Congress.
Component Reliability Analysis
Dr.M.V.Rama Rao Department of Civil Engineering,
Error Analysis Accuracy Closeness to the true value Measurement Accuracy – determines the closeness of the measured value to the true value Instrument.
Sullivan – Fundamentals of Statistics – 2 nd Edition – Chapter 9 Section 1 – Slide 1 of 39 Chapter 9 Section 1 The Logic in Constructing Confidence Intervals.
Statistical Decision Theory
Copyright © 2010, 2007, 2004 Pearson Education, Inc. Review and Preview This chapter combines the methods of descriptive statistics presented in.
Lecture 12 Statistical Inference (Estimation) Point and Interval estimation By Aziza Munir.
Probabilistic Mechanism Analysis. Outline Uncertainty in mechanisms Why consider uncertainty Basics of uncertainty Probabilistic mechanism analysis Examples.
Section 8.1 Estimating  When  is Known In this section, we develop techniques for estimating the population mean μ using sample data. We assume that.
Geo597 Geostatistics Ch9 Random Function Models.
Reliability Models & Applications Leadership in Engineering
AMERICA’S ARMY: THE STRENGTH OF THE NATION Mort Anvari 1 Cost Risk and Uncertainty Analysis MORS Special Meeting | September.
Uses of Statistics: 1)Descriptive : To describe or summarize a collection of data points The data set in hand = the population of interest 2)Inferential.
Neumaier Clouds Yan Bulgak October 30, MAR550, Challenger 165.
Two Main Uses of Statistics: 1)Descriptive : To describe or summarize a collection of data points The data set in hand = the population of interest 2)Inferential.
5-1 ANSYS, Inc. Proprietary © 2009 ANSYS, Inc. All rights reserved. May 28, 2009 Inventory # Chapter 5 Six Sigma.
Statistical Decision Theory Bayes’ theorem: For discrete events For probability density functions.
1 / 12 Michael Beer, Vladik Kreinovich COMPARING INTERVALS AND MOMENTS FOR THE QUANTIFICATION OF COARSE INFORMATION M. Beer University of Liverpool V.
Machine Design Under Uncertainty. Outline Uncertainty in mechanical components Why consider uncertainty Basics of uncertainty Uncertainty analysis for.
Sampling and estimation Petter Mostad
Lab for Remote Sensing Hydrology and Spatial Modeling Dept of Bioenvironmental Systems Engineering National Taiwan University 1/45 GEOSTATISTICS INTRODUCTION.
- 1 - Computer model under uncertainty In previous lecture on accuracy assessment –We considered mostly deterministic models. – We did not distinguish.
STATIC ANALYSIS OF UNCERTAIN STRUCTURES USING INTERVAL EIGENVALUE DECOMPOSITION Mehdi Modares Tufts University Robert L. Mullen Case Western Reserve University.
Efficient Method of Solution of Large Scale Engineering Problems with Interval Parameters Based on Sensitivity Analysis Andrzej Pownuk Silesian University.
MEGN 537 – Probabilistic Biomechanics Ch.4 – Common Probability Distributions Anthony J Petrella, PhD.
+ The Practice of Statistics, 4 th edition – For AP* STARNES, YATES, MOORE Chapter 8: Estimating with Confidence Section 8.1 Confidence Intervals: The.
Copyright (c) 2004 Brooks/Cole, a division of Thomson Learning, Inc. Chapter 7 Inferences Concerning Means.
Fundamentals of Data Analysis Lecture 11 Methods of parametric estimation.
Dr.Theingi Community Medicine
Computer Simulation Henry C. Co Technology and Operations Management,
Estimating the Value of a Parameter Using Confidence Intervals
ESTIMATION.
Chapter 3 Component Reliability Analysis of Structures.
Statistical Methods For Engineers
CONCEPTS OF ESTIMATION
More about Posterior Distributions
Simulation Modeling.
Lecture 2 – Monte Carlo method in finance
Ch13 Empirical Methods.
Sampling Distributions
Optimization under Uncertainty
Presentation transcript:

Calculating Risk of Cost Using Monte Carlo Simulation with Fuzzy Parameters in Civil Engineering Michał Bętkowski Andrzej Pownuk Silesian University of Technology, Poland

2/56 Risk of cost overruns We can define risk as possibility of occurrence of loss. There is always the difference between the planned costs and real costs.

3/56 Direct costs (DC) Indirect costs (IC) Direct costs are expenses that are directly linked to the project For example: materials, labour, equipment etc. Other costs. For example: management costs, cost of insurance etc. Calculating of cost

4/56 Estimating of direct cost (DC) The project can be decomposed into elements

5/56 Direct cost (DC) DC = Cost 1 + Cost 2+ Cost 3 Cost 1Cost 2Cost 3 MaterialsLabourEquipment

6/56 Methods of calculating of directional cost Deterministic Probabilistic

7/56 Deterministic methods of calculating costs - appearance of task is deterministic - cost of each task is deterministic

8/56 Calculating Risk in deterministic methods Risk in deterministic methods is taken into account as additional constant component of cost. (It is possible to express the risk in percent)

9/56 Typical problems with deterministic methods of calculating of costs Unknown characteristics of costs (labour, whether), - Alternative tasks, - Additional tasks.

10/56 Probabilistic methods Alternative tasks Additional task Changeable costs of tasks

11/56 Alternative tasks hamburger ColaBeer Begin End

12/56 Additional task hamburger ColaBeer chips End Begin

13/56 Changeable costs of tasks Old car is cheaper than the new one

14/56 Probabilistic definition of risk - real cost (random variable) - fixed cost

15/56 Probabilistic definition of risk Probability density function Cumulative distribution function Risk of cost

16/56 Beta Pert distribution

17/56 Beta Pert distribution

18/56 Beta Pert distribution

19/56 Alternative tasks Cost 1 Cost 2Cost 3 Total cost = Cost 1 + Cost 2 or Total cost = Cost 1 + Cost 3

20/56 Existing software - Pert Master, - Risk, - MS Project Etc.

21/56 Advantages of probabilistic methods - Express realistic character of the realization of the process. - Using probabilistic methods it is possible describe random parameters (unpredictable weather, material cost, inaccurate materials estimates)

22/56 Limitation of pure probabilistic methods - unique character of many civil engineering project - different conditions of the realization (weather, geological conditions, geographical region etc.) Because of that we do not know reliable statistical data

23/56 Main problem It is very difficult to obtain exact values of probabilistic characteristics of the structure For example: m, σ etc.

24/56 Basic assumption According to many experiments parameters of the system can be characterized by typical probability distribution of cost (if we know the data): - Normal distribution - Beta-Pert distribution - Lognormal distribution etc.

25/56 However we do not know the parameters Probability density function of costs

26/56 What we know? We know deterministic values of costs from the catalogue We have expert knowledge about particular cost (i.e. what happened usually) Sometimes we have some experimental data

27/56 Information from experts Lower bound Upper bound Most probable cost

28/56 If we have many experts then we can get more information Lower bound Upper bound Most probable cost

29/56 Fuzzy numbers (clouds) We can also ask experts about confidence intervals for different probability levels (alpha-cuts, degree of membership)

30/56 Confidence intervals

31/56 Calculation of fuzzy numbers using the data

32/56 Advantages of fuzzy sets description (clouds) In order to define the worst case (intervals) we do not need many information Confidence intervals can be defined for set valued data (random sets)

33/56 Dependency problem It is not a good idea to convert interval probability density function to interval cumulative distribution function (overestimation problem)

34/56 Dependency problem P-box method consider all possible probability distribution i.e. some of them do not corresponds to any parameters a, b

35/56 Dependency problem Envelop does not correspond to any combination of parameters

36/56 Probability density function with fuzzy parameters

37/56 Application of extension principle

38/56 - Risk for particular cost - Cumulative distribution function - vector of uncertain parameters

39/56 Modified extension principle (clouds)

40/56 Discretization of α-cuts

41/56 Monte Carlo simulations

42/56 Advantages of Monte Carlo method - it is possible to get full description of probability density function of the results - the method is able to take into account any type of uncertainty and dependency

43/56 Graph description of the system

44/56 Numerical results

45/56 Numerical results

46/56 Numerical results

47/56 Numerical results

48/56 Computer implementation of the algorithm Algorithm was implemented in C++ language. GSL library was also applied.

49/56 Numerical data for node 0

50/56 Description of the node Node NumberOfNode 0, NumberOfChildren 2, Children 1 3, Probability 0.415, IntervalProbability 0.088, xMinMin , xMinMax , xMidMin , xMidMax , xMaxMin , xMaxMax , ProbabilityGrids 3 NumberOfGrid 3 End

51/56 Types of nodes - Normal distribution (with uncertain parameters) - Beta Pert distribution (with uncertain parameters) - constant value - intervals (not implemented) - fuzzy numbers (not implemented)

52/56 Sum of fuzzy number and probability density function Using presented algorithm it is possible to calculate sum of probability density function and fuzzy number (clouds). In calculation one can apply: - min-max extension principle (classical solution - controversial) - new extension principle (recommended, has clear interpretation based on clouds)

53/56 Results: Classic extension principle: - fuzzy probability New extension principle: - fuzzy probability - fuzzy number (confidence intervals, clouds)

54/56 One more remark about dependency problem Due to nonlinearity alpha cat method is not always good method of transformation of confidence intervals. Because of that we have to check some additional conditions before using this method.

55/56 Additional information necessary for computation Results Xmin 820, Xmax 1120, NumberOfSimulations 10000, NumberOfClasses 20, NumberOfGrids 3, DistributionType 2 End

56/56 Conclusions Presented method allows estimating the direct cost risk of civil engineering projects in the case when there are no credible data. In presented algorithm the costs can be deterministic, probabilistic, fuzzy number. It is also possible to take into account the cost which is modeled by probability density function with fuzzy parameters. The method shows the relation between the assumed maximal direct costs, the risk of overrun and the uncertainty of the statistical data.