Chapter 16 – Project Management Operations Management by R. Dan Reid & Nada R. Sanders 2nd Edition © Wiley 2005 PowerPoint Presentation by R.B. Clough.

Slides:



Advertisements
Similar presentations
© Wiley 2010 Chapter 16 – Project Management Operations Management by R. Dan Reid & Nada R. Sanders 4th Edition © Wiley 2010.
Advertisements

© Wiley 2007 Chapter 16 – Project Management Operations Management by R. Dan Reid & Nada R. Sanders 3 rd Edition © Wiley 2005 PowerPoint Presentation by.
Chapter 3 – Project Management
Chapter 16 – Project Management
Chapter 17 Project Management McGraw-Hill/Irwin
Prepared by Scott M. Shafer, Updated by William E. Matthews and Thomas G. Roberts, William Patterson University Copyright 2007 John Wiley & Sons, Inc.5-1.
Project Management in Practice, Fourth Edition Prepared by Scott M. Shafer, Updated by William E. Matthews and Thomas G. Roberts, William Paterson University.
F O U R T H E D I T I O N Project Management © The McGraw-Hill Companies, Inc., 2003 supplement 3 DAVIS AQUILANO CHASE PowerPoint Presentation by Charlie.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects…
Scheduling for Low-volume Operations Chapter 15 Operations Management by R. Dan Reid & Nada R. Sanders 2nd Edition © Wiley 2005 PowerPoint Presentation.
2 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Project Management 2.
MEM 612 Project Management Chapter 5 Scheduling the Project.
1 Project Scheduling CP - Chapter 10 Lecture 3. 2 Project Management  How is it different?  Limited time frame  Narrow focus, specific objectives 
Project Management in Practice Fifth Edition Copyright © 2014 John Wiley & Sons, Inc. Chapter 5 Scheduling the Project.
MGMT 483 Week 8 Scheduling.
Chapter 9 Project Management.
1 Operations Management Lesson 5 Project Management.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 17 Project Management.
Chapter 16 – Project Management
Operations and Supply Chain Management, 8th Edition
Chapter 16 – Project Management
Project Management. Introduction What – Project Management Where – Where the success or failure of a project will have major consequences for the company.
© 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Chapter 6 Project Management.
Lecture 4 Project Management Chapter 17.
Copyright 2009 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
OPERATIONS MANAGEMENT for MBAs Fourth Edition
Allocating Resources to the Project
Project Management © Wiley 2007.
Operations Management Contemporary Concepts and Cases Chapter Fourteen Project Planning and Scheduling Copyright © 2011 by The McGraw-Hill Companies,
Project Management Chapter 13 OPS 370. Projects Project Management Five Phases 1. Initiation 2. Planning 3. Execution 4. Control 5. Closure.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
8-1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Project Management Chapter 8.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Project Management: A Managerial Approach
Reid & Sanders, Operations Management © Wiley 2002 Project Management 17 C H A P T E R.
© Wiley 2010 Chapter 16 – PERT, CPM and Critical Chain Operations Management by R. Dan Reid & Nada R. Sanders 4th Edition © Wiley 2010.
Network Planning Techniques Program Evaluation & Review Technique (PERT): Developed to manage the Polaris missile project Many tasks pushed the boundaries.
Chapter 7 The Project Schedule and Budget Copyright 2012 John Wiley & Sons, Inc. 7-1.
Copyright 2009 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 6 th Edition Chapter.
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Chapter 17 Project Management Part.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 17 Project Management.
Project Management (專案管理)
Project Management Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
Irwin/McGraw-Hill © The McGraw-Hill Companies, Inc., 1999 PROJECT MANAGEMENT 18-1 Project Management.
Work Systems and the Methods, Measurement, and Management of Work by Mikell P. Groover, ISBN ©2007 Pearson Education, Inc., Upper Saddle.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
Chapter 8 Scheduling © 2012 John Wiley & Sons Inc.
Scheduling for Low-volume Operations Chapter 15 Operations Management by R. Dan Reid & Nada R. Sanders 2nd Edition © Wiley 2005 PowerPoint Presentation.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
MEM 612 Project Management Chapter 6 Allocating Resources to the Project.
Project Management in Practice
PROJECT MANAGEMENT Outline What is project mean? Examples of projects…
MEM 612 Project Management Chapter 5 Scheduling the Project.
Prepared by Scott M. Shafer, Updated by William E. Matthews and Thomas G. Roberts, William Patterson University Copyright 2007 John Wiley & Sons, Inc.5-1.
Chapter 7 – PERT, CPM and Critical Chain Operations Management by R. Dan Reid & Nada R. Sanders 4th Edition © Wiley 2010.
© 2006 John Wiley and Sons, Inc. Project Management: A Managerial Approach Chapter 8 – Scheduling.
Operations Management Project Management
(M) Chapter 12 MANGT 662 (A): Procurement, Logistics and Supply Chain Design Purchasing and Supply Chain Analysis (1/2)
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
2010© Wiley Chapter 16 – Project Management Operations Management by R. Dan Reid & Nada R. Sanders 4 th Edition © Wiley PowerPoint Presentation by R.B.
Beni Asllani University of Tennessee at Chattanooga
Chapter 16 – Project Management
Project Management (專案管理)
Chapter 17 Project Management McGraw-Hill/Irwin
Project Planning & Scheduling
Information Technology Project Management
PROJECT MANAGEMENT WITH CPM/PERT.
Project Management: A Managerial Approach
Chapter 16 – Project Management
Presentation transcript:

Chapter 16 – Project Management Operations Management by R. Dan Reid & Nada R. Sanders 2nd Edition © Wiley 2005 PowerPoint Presentation by R.B. Clough - UNH

Learning Objectives Describe project management objectives Describe the project life cycle Diagram networks of project activities Estimate the completion time of a project Compute the probability of completing a project by a specific time Determine how to reduce the length of a project effectively Describe the critical chain approach to project management

Project Management Applications What is a project? Any endeavor with objectives With multiple activities With defined precedent relationships With a specific time period for completion Examples? A major event like a wedding Any construction project Designing a political campaign

Five Project Life Cycle Phases Conception: identify the need Feasibility analysis or study: costs benefits, and risks Planning: who, how long, what to do? Execution: doing the project Termination: ending the project

Network Planning Techniques Program Evaluation & Review Technique (PERT): Developed to manage the Polaris missile project Many tasks pushed the boundaries of science & engineering (tasks’ duration = probabilistic) Critical Path Method (CPM): Developed to coordinate maintenance projects in the chemical industry A complex undertaking, but individual tasks are routine (tasks’ duration = deterministic)

Both PERT and CPM Graphically display the precedence relationships & sequence of activities Estimate the project’s duration Identify critical activities that cannot be delayed without delaying the project Estimate the amount of slack associated with non-critical activities

Network Diagrams Activity-on-Node (AON): Uses nodes to represent the activity Uses arrows to represent precedence relationships

Step 1-Define the Project: Cables By Us is bringing a new product on line to be manufactured in their current facility in some existing space. The owners have identified 11 activities and their precedence relationships. Develop an AON for the project.

Step 2- Diagram the Network for Cables By Us

Step 3 (a)- Add Deterministic Time Estimates and Connected Paths

Step 3 (a) ( Continued ): Calculate the Path Completion Times The longest path (ABDEGIJK) limits the project’s duration (project cannot finish in less time than its longest path) ABDEGIJK is the project’s critical path

Some Network Definitions All activities on the critical path have zero slack Slack defines how long non-critical activities can be delayed without delaying the project Slack = the activity’s late finish minus its early finish (or its late start minus its early start) Earliest Start (ES) = the earliest finish of the immediately preceding activity Earliest Finish (EF) = is the ES plus the activity time Latest Start (LS) and Latest Finish (LF) depend on whether or not the activity is on the critical path

ES, EF Network

LS, LF Network

Calculating Slack

Revisiting Cables By Us Using Probabilistic Time Estimates

Using Beta Probability Distribution to Calculate Expected Time Durations A typical beta distribution is shown below, note that it has definite end points The expected time for finishing each activity is a weighted average

Calculating Expected Task Times

Network Diagram with Expected Activity Times

Estimated Path Durations through the Network ABDEGIJK is the expected critical path & the project has an expected duration of weeks

Adding ES and EF to Network

Gantt Chart Showing Each Activity Finished at the Earliest Possible Start Date

Adding LS and LF to Network

Gantt Chart Showing the Latest Possible Start Times if the Project Is to Be Completed in Weeks

Estimating the Probability of Completion Dates Using probabilistic time estimates offers the advantage of predicting the probability of project completion dates We have already calculated the expected time for each activity by making three time estimates Now we need to calculate the variance for each activity The variance of the beta probability distribution is: where p=pessimistic activity time estimate o=optimistic activity time estimate

Project Activity Variance ActivityOptimisticMost LikelyPessimisticVariance A B C D E F G H I J K

Variances of Each Path through the Network Path Number Activities on Path Path Variance (weeks) 1A,B,D,E,G,H,J,k4.82 2A,B,D,E,G,I,J,K4.96 3A,C,F,G,H,J,K2.24 4A,C,F,G,I,J,K2.38

Calculating the Probability of Completing the Project in Less Than a Specified Time When you know: The expected completion time Its variance You can calculate the probability of completing the project in “X” weeks with the following formula: Where DT = the specified completion date EF P = the expected completion time of the path

Example: Calculating the probability of finishing the project in 48 weeks Use the z values in Appendix B to determine probabilities e.g. probability for path 1 is Path Number Activities on PathPath Variance (weeks) z-valueProbability of Completion 1A,B,D,E,G,H,J,k A,B,D,E,G,I,J,K A,C,F,G,H,J,K A,C,F,G,I,J,K

Reducing the Time of a Project (crashing) ActivityNormal Time (wk) Normal Cost ($) Crash Time Crash Cost ($) Max. weeks of reduction Reduce cost per week A48,000311,00013,000 B630,000535,00015,000 C36, D624,000428,00022,000 E1460, ,00026,000 F55,00046, G26, H24, I3 25,00011,000 J44,00026,40021,200 K25,

Crashing Example: Suppose the Cables By Us project manager wants to reduce the new product project from 41 to 36 weeks. Crashing Costs are considered to be linear Look to crash activities on the critical path Crash the least expensive activities on the critical path first (based on cost per week) Crash activity I from 3 weeks to 2 weeks $1000 Crash activity J from 4 weeks to 2 weeks $2400 Crash activity D from 6 weeks to 4 weeks $4000 Recommend Crash Cost $7400 Question: Will crashing 5 weeks return more in benefits than it costs?

Crashed Network Diagram

The Critical Chain Approach The Critical Chain Approach focuses on the project due date rather than on individual activities and the following realities: Project time estimates are uncertain so we add safety time Multi-levels of organization may add additional time to be “safe” Individual activity buffers may be wasted on lower-priority activities A better approach is to place the project safety buffer at the end Original critical path Activity AActivity BActivity CActivity DActivity E Critical path with project buffer Activity AActivity BActivity CActivity DActivity EProject Buffer

Adding Feeder Buffers to Critical Chains The theory of constraints, the basis for critical chains, focuses on keeping bottlenecks busy. Time buffers can be put between bottlenecks in the critical path These feeder buffers protect the critical path from delays in non- critical paths

Chapter 16 Highlights A project is a unique, one time event of some duration that consumes resources and is designed to achieve an objective in a given time period. Each project goes through a five-phase life cycle: concept, feasibility study, planning, execution, and termination. Two network planning techniques are PERT and CPM. Pert uses probabilistic time estimates. CPM uses deterministic time estimates. Pert and CPM determine the critical path of the project and the estimated completion time. On large projects, software programs are available to identify the critical path.

Chapter 16 Highlights (continued) Pert uses probabilistic time estimates to determine the probability that a project will be done by a specific time. To reduce the length of the project (crashing), we need to know the critical path of the project and the cost of reducing individual activity times. The critical chain approach removes excess safety time from individual activities and creates a project buffer at the end of the critical path.

The End Copyright © 2005 John Wiley & Sons, Inc. All rights reserved. Reproduction or translation of this work beyond that permitted in Section 117 of the 1976 United State Copyright Act without the express written permission of the copyright owner is unlawful. Request for further information should be addressed to the Permissions Department, John Wiley & Sons, Inc. The purchaser may make back-up copies for his/her own use only and not for distribution or resale. The Publisher assumes no responsibility for errors, omissions, or damages, caused by the use of these programs or from the use of the information contained herein.