June 13, 2013 Joy Wiecks Fond du Lac Reservation 1.

Slides:



Advertisements
Similar presentations
Cathy Beahm Technical Assistance Specialist NH DES, Air Resources
Advertisements

METAL COIL SURFACE COATING MACT OVERVIEW 40 CFR PART 63, SUBPART SSSS May CFR PART 63, SUBPART SSSS May 2006.
DRAFT IRON & STEEL FOUNDRY MACT FACILITY INSPECTIONS 40 CFR PART 63, SUBPART EEEEE.
METAL CAN SURFACE COATING MACT COMPLIANCE ASSURANCE 40 CFR PART 63, SUBPART KKKK June 2006 June CFR PART 63, SUBPART KKKK June 2006 June 2006.
METAL COIL SURFACE MACT COMPLIANCE ASSURANCE 40 CFR PART 63, SUBPART SSSS May 2006 May 2006.
Tribal Permit Training Fond du Lac Reservation June 11, 2013.
© Jeffer, Mangels, Butler & Marmaro LLP CAA Title V Regulatory Requirements Malcolm C. Weiss, Esq. (310) Jeffer, Mangels, Butler.
1 Air Quality Impact Analysis and Other PSD Requirements Donald Law U.S. EPA Region 8.
Iowa Title V Operating Permits Lori Hanson, Title V Operating Permit Section Supervisor.
Public Review vs “affected state” Review: advantages of TAS for section 505 Reviewing NSR and Title V Permits Natalene Cummings Forest County Potawatomi.
New Federal Regulations for Internal Combustion Engines Doug Parce.
Overview of the Clean Air Act and the Proposed Petroleum Refinery Sector Risk and Technology Review and New Source Performance Standards Public Outreach.
2015 NCMA EPA Enforcement Policies and How They Affect Your Facility Michael Pjetraj, P.E. DAQ Stationary Source Compliance Branch Supervisor.
NCMA Workshop March 19 and 24, 2015 Betty Gatano, P.E. Permitting Section North Carolina Division of Air Quality, Raleigh, NC (919)
Air Permitting Overview.
Air Construction Permitting Services Sarah Piziali, Construction Permit Section Supervisor.
Clean Air Act and Permits
Air Quality Regulations and Academic Institutions Steve Hall Environmental Engineer II NC DENR – Division of Air Quality Raleigh Regional Office.
December 4, Utility MACT Air & Waste Management Association/EPA Information Exchange December 4, 2002 William H. Maxwell Combustion Group/ESD.
Managing Air Quality Data 101 Presented by: Chris Bellusci & Claire Lund, PE (Sanborn Head) International Conference for Environmental.
Update on EPA Oil and Gas Activities Greg Green, Outreach and Information Division, OAQPS.
IOWA Department of Natural Resources Air Quality Program Development Jim McGraw Environmental Program Supervisor  8 hr Ozone and PM2.5 NAAQS Implementation.
Where to find Information About Facilities. Overview of Title V Permits.
Indiana New Source Review Reform Plantwide Applicability Limitations (PALs) IDEM/Office of Air Quality September 7, 2004.
Air Quality 101 Kansas Air Quality Program overview.
10/1/ Air Quality Permitting Air Quality Committee William D. Willets, P.E. Engineering Supervisor DAQ Permitting Section May 7, 2014.
Compliance Assurance and Title V Monitoring A Summary of the Rules and Applications Peter Westlin, EPA, OAQPS.
CANDACE CARRAWAY OFFICE OF AIR QUALITY PLANNING AND STANDARDS US EPA JUNE 2013 General Permits and Permits by Rule 1.
BART Control Analysis WESTAR August 31, 2005 EPA Office of Air Quality Planning and Standards Todd Hawes
Navajo Nation Operating Permit Program
UTILITY MACT WORKING GROUP STATE AND LOCAL STAKEHOLDER RECOMMENDATIONS.
Distinguishing: Clean Air Act, EPA Rules, Regulations and Guidance David Cole U.S. EPA, OAQPS Research Triangle Park, NC.
Title V Operating Permit Program 1 Section 1: Intro to Title V Laura McKelvey U.S. EPA.
Title V: The Big Picture
Environmental Justice & Air Permitting Training - August 15, 2012 EPA Region IV – Atlanta, Georgia.
Compliance Assurance and Title V Monitoring A Summary of Rules and Permitting Issues Peter Westlin, EPA, OAQPS.
Developing an In-House Air Quality Audit Program March 22, 2006 Judy B. Yorke Yorke Engineering, LLC x25
Best Available Retrofit Technology Rule - Colorado David R. Ouimette Colorado Air Pollution Control Division.
Greenhouse Gas (GHG) Permit Training Other Aspects of PSD Title V Permitting.
Title V Operating Permits: A Compliance and Enforcement Tool Candace Carraway US Environmental Protection Agency Office of Air Quality Planning and Standards.
Jessica Montanez Environmental Protection Agency NEW SOURCE REVIEW (NSR) PROGRAM.
Region 9 Title V Permit Review Guidelines Ray Vogel EPA/OAQPS.
1 Non-Attainment NSR Program Donald Law EPA Region 8.
Minor NSR Program and Highlights of the Proposed Tribal Major Nonattainment and Minor NSR Rules Jessica Montañez U.S. Environmental Protection Agency Office.
Best Available Retrofit Technology (BART) Process November 15, 2006 Eric C. Massey, Manager Air Quality Compliance Section.
Clean Air Act SAFE 210. Purpose Protect public health and regulate air emissions Addresses both stationary and mobile sources.
CAA Program Reporting Clarification Regarding Federally-Reportable Violations for Clean Air Act Stationary Sources (March 2010) (FRV Clarification Memo)
NSR and Title V Activities WESTAR Business Meeting May 2005.
Title 5 Permits The Clean Error Act ©2002 Dr. B. C. Paul.
Carrie Paige – EPA Region 6, Dallas David Cole – EPA OAQPS, RTP, NC Introduction to Air Permits Introduction to Air Permits.
Compliance Assurance Monitoring (CAM) November 24, 2009.
2005 NSR Regulation Changes Dwight Wylie. Old Units vs. New Units  There is a broad disparity between air pollution control requirements and emissions.
Analytical Laboratories - Potential and Restricted Emissions Kevin Tyson, Air Quality Analyst Wednesday, December 10, 2014.
Navajo Nation Air Quality Control Program Operating Permit Program Navajo Nation Environmental Protection Agency Route 112 North/Bldg Fort Defiance,
How to target your review Genevieve Damico U.S. EPA (312)
TAS and TIP Swinomish Tribe and the Incremental Approach.
Nonattainment New Source Review (NA NSR) Program Raj Rao US Environmental Protection Agency Office of Air Quality Planning and Standards ,
Tailoring Rule - Title V Scenarios July 20, 2010 Katherine N. Blue Principal Consultant, Climate Change Services trinityconsultants.com Troutman Sanders/Trinity.
Pulp & Paper Sector Strategy & New Source Performance Standards Strategy Peter Tsirigotis, Director Sector Policies & Programs Division National Association.
Climate: ANPR, SIPs and Section 821 WESTAR October 2, 2008.
Preparing for Permit Review
Introduction to Air Quality Permitting
Clean Air Act Glossary.
Tribal Roles in Minor NSR by: Joy Wiecks, Fond du Lac Band
Overview of New Source Review (NSR)
Major New Source Review (NSR) Part 2
How To Target Your Review
Boiler Sheltered Initiative
Air Quality Permitting
Uinta Basin General Conformity
Presentation transcript:

June 13, 2013 Joy Wiecks Fond du Lac Reservation 1

 Description  Features  Sources they cover  Reviewing them 2

 Air quality goals were not met  Confusion as to what requirements applied to a facility  Existing rules often lacked monitoring  Limited public access and comment  Weak compliance oversight  Purpose of Title V permit: accountability, improved compliance and enforcement for facilities that have started operating 3

 Refers to Title 5 of the CAA  Operating permits, not construction  “Bucket” program  Contains enforceable conditions (federal or state)  Addresses major sources (see next slide)  Grows with the facility  Updated regularly  Addresses criteria pollutants, toxics, and greenhouse gases 4

 Any major source  Any facility with Potential To Emit above: 10 tpy any one toxic; 25 tpy of combination of toxics; 100 tpy any regulated pollutant; lesser amounts if in n/a area.  Any solid waste incineration unit under CAA section 129  See for updated list of non-major sources; most non-majors are exempt from Title 5.  Many facilities took limits to avoid Title 5 (Synthetic Minors) 5

 Covered under Federally Enforceable State Operating Permit (FESOP), minor NSR permits, or state prohibitory rules  Different from a true minor  Needs federally enforceable limits to stay under major source threshold  Sources may choose to be synthetic minor for different reasons 6

 Requires compliance certification from a high-level company official  Adds enhanced monitoring (sometimes), record-keeping, and reporting requirements and schedules for these  Has citizen suit opportunities  Forces a facility-wide look, potential reductions  “Insignificant units” can be left out of the permit application (but not the permit) 7

8 Permit Term PSD PermitTitle V Permit Emission limits2.3 lbs/hr of NOX 1.7 lbs/hr of CO.5 lbs/hr of VOC 2.3 lbs/hr of NOX 1.7 lbs/hr of CO.5 lbs/hr of VOC Monitoring and testing Perform initial compliance test within 30 days of engine retrofit Measure NOX and CO at least once per quarter, using a portable analyzer and monitoring protocols approved by EPA For VOC, conduct a performance test once every 5 years using protocol approved by EPA RecordkeepingRecord initial test resultsKeep records of: Date, place and time of sampling or measurements Date(s) analyses were performed Company or entity that performed the analyses Analytical techniques or methods used Results of such analyses Operating conditions as existing at the time of the sampling Retain records of all required monitoring data and support information for at least 5 years

Periodic Title 5 updates incorporate new requirements  SIP limits that result from updated NAAQS  New requirements such as Maximum Available Control Technology, New Source Performance Standards, National Emissions Standards for Hazardous Air Pollutants  Regional haze requirements (Best Available Retrofit Technology)  Updates to otherwise ensure compliance 9

 Applies to major sources of toxic pollutants (PTE of 10 tpy of single HAP, or 25 tpy of multiple HAP’s)  EPA sets MACT emission levels - offers choices of control options  MACT based on the top-performing 12% of industry sources  EPA required to do an 8 year residual risk review  Source can take limits to stay out of MACT if done before specific regulation passed 10

 Basics (same for most permits), “thou shalt’s/shalt not’s”  For each process line or emissions source, the permit generally has:  Description of process and its stacks and pollution control equipment  Emission limit or other type of limit  Monitoring, recordkeeping and reporting 11

What to doWhy to do it Line 3 may emit no more than 0.3 lbs of NOx/hr Requirement xxx.111 Lines 1, 2, and 3 may emit no more than 52 lbs of NOx/hr Requirement yyy.222 Lines 1, 2, and 3 may emit no more than 245 tons of NOx/yr Requirement zzz.333 Line 3 may burn only solid fuelRequirement xxx.111 Lines 1 and 2 can burn solid and liquid fuel Requirement sss

 Permit limits/requirement come from:  Federal programs (i.e. NSPS, BART, MACT)  NSR permits  State-only requirements  SIP requirements  Enforcement actions  If reason not clear, check with permit engineer  Facility needs to demonstrate how they’re meeting limits 13

 Requirements needed to meet NAAQS and state standards  Requirements needed to meet Class II increment (measure of how much additional pollution is allowed)  Requirements needed to meet Class I increment, visibility, and acid deposition, air toxics programs  Appropriate emission controls  Any required mitigation 14

 For any permit standard or limit, there must be monitoring, reporting, and recordkeeping  Frequency of monitoring depends on: how close to NAAQS emissions are; health effects of pollutant; cumulative emissions; variability of emissions  Semi-annual monitoring reports, plus compliance certification  Records kept on-site for 5 years 15

Operational Restriction or Emission Limitation MonitoringRecordkeeping ReportingTesting 0.3 lbx NOx/hr on Line 3 Stack testKeep on file for 5 years 60 days after final report Test method Opacity CEM’sKeep on file for 5 years Report deviations Certify CEM’s every year 16

 Need to make sure equipment is functioning properly  Do this thru stack testing or parametric testing  Parameters: scrubber water flow rate, ESP voltage, fabric filter pressure drop  Need ranges, and actions to take if parameters outside range  One pollutant can serve as a surrogate for another 17

 Units subject to pre–1990 rules  Units subject to a SIP requirement for which there is no reasonable compliance assurance method specified  Units subject to old NSR permits  Voluntary terms created in the Title V permit 18

 Facilities have operating and maintenance plans for equipment  Inspection frequency, employee training, spare parts kept on-site, etc.  Dust control plans  Monitoring equipment operation plans  All of the above can be incorporated by reference 19

Many items require judgment calls on the part of the permit engineer.  Frequency of testing  Stack testing vs. CEM’s  Permit engineer considers: how close to the NAAQS emissions will be; how reliable the emissions data is; health effects of the pollutant  The permit should retain the ability to change testing frequency, etc. depending on the results obtained 20

Concerns will be different for each Reservation  Standard re-issuance or new items?  Pollutants of concern?  Magnitude of pollutant changes  Reputation of facility  Distance from Reservation  How close to the NAAQS are the emissions?  How complicated is the permit? 21

 The more permits you review, the better you will get at it!  Be sure every requirement has: monitoring, reporting, and recordkeeping associated with it  Make sure permit has “outs” or ways to change the permit if results are unacceptable  Read the TSD first for explanation of processes and limits  EPA doesn’t review all permits, but sometimes “takes requests” from tribes  Call the permit engineer, the FLM, the EPA to ask questions  Attend public hearing, or request one 22

 Check calculations and emission factors  Look up regulations referenced in the permit for understanding and applicability (modeling, monitoring methods, etc)  Can look at permit application  Read any studies referenced  Read appendices 23

 Company submits an application  Permitting agency reviews  Draft permit issued to company to review (sometimes)  Draft permit put on public notice  30 day comment period follows  A 45-day EPA review period usually occurs at the same time 24

Title V Programs Provide the Public with Opportunities to:  Comment on and request a public hearing on draft permits  Appeal Part 70 permits in State court and petition EPA to object to such permits  Appeal EPA-issued permits to the Environmental Appeals Board and federal courts  Track compliance by reviewing reports/certifications submitted by sources  Bring enforcement actions in civil court for permit noncompliance 25

 Title 5 is a “bucket” program  Covers major sources  Comprehensive look at the facility  Many opportunities for public involvement  Make sure that compliance will be demonstrated 26