IEFC WS 21-24 March 2011 Middle-Long Term Needs for Ion Beams S. Maury 111 Middle-Long Term Needs for Ion Beams S.Maury Thanks to T. Bohl, C. Carli, D.

Slides:



Advertisements
Similar presentations
Masahito TOMIZAWA and Satoshi MIHARA Accelerator and proton beam.
Advertisements

Accelerator Schedules LHC and LHC Injectors Schedules MSWG meeting 16 January 2015 SPSC - 13 January 2015 Rende Steerenberg, BE/OP2 Rende Steerenberg,
Patrick Robbe, LAL Orsay, for the LHCb Collaboration, 16 December 2014
Lot’s of time lost due to cryo problem in IR8. Major impact, therefore review of MD program… Start discussion here, please let us know your input. Will.
LINAC4 STATUS Alessandra M. Lombardi for the LINAC4 team 1.Motivation and goals 2.Status of Linac4 2 years after official start of the project ( )
1 Luminosity monitor and LHC operation H. Burkhardt AB/ABP, TAN integration workshop, 10/3/2006 Thanks for discussions and input from Enrico Bravin, Ralph.
Ion Programme of LHC Hans-H. Braun Miniworkshop on Machine and Physics Aspects of CLIC based future Collider Option, Ion Programme of LHC Hans-H.
CONTENT: Beam characteristics and parameters Filling schemes Operational settings OP procedure and COLL setting Planning Shift breakdown To define the.
R Scrivens, D Kuchler, IEFC Workshop  Schedule and Performance  The Source  Other Linac Issues (not exhaustive)  New ions  Final remarks 1.
ION COMMISSIONING REVISITED 1 Thanks to: John Jowett, Walter Venturini. Matteo Solfaroli.
Linac2 Review  L2 operated with 99 % uptime in 2010 and 98% in the last 10 years  Systems review: all under control even for L2 till LS2 if ‘nightmare’
1 Tunnel implementations (laser straight) Central Injector complex.
Luminosity expectations for the first years of CLIC operation CTC MJ.
0 1 Alternative Options in the Injectors – Preliminary Summary H. Damerau LIU-TM#8 18 October 2013 Many thanks for discussions and input to T. Argyropoulos,
Preparation of Review R. Assmann et al CWG, CWG R. Assmann.
Production of bunch doublets for scrubbing of the LHC J. Esteban Muller (simulations), E. Shaposhnikova 3 December 2013 LBOC Thanks to H. Bartosik, T.
Results of the argon beam test at Linac3 D. Küchler BE/ABP/HSL Including feedback from R. Scrivens and M. Bodendorfer.
Machine development - results and plans – critical results, what’s to be done? R. Assmann 15/07/2011 R. Assmann for the LHC MD coordination team (R. Assmann,
Workshop Objectives & Highlights from Daresbury Meeting Erk Jensen, CERN.
NA61 11 October 2010Light Ion for NA61/ S. Maury1 Light Ion in SPS Foreseen to have primary Ar beam physics in 2012 Nothing runs in 2012 NA61 duty cycle.
Session 7: I-LHC Organization: Chamonix Summary Session7; Oliver Brüning 1 -session organized in collaboration with D. Manglunki and all speakers.
The SPS as a Damping Ring Test Facility for CLIC March 6 th, 2013 Yannis PAPAPHILIPPOU CERN CLIC Collaboration Working meeting.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
LINAC4 and the Upgrade of the LHC Injector Complex R. Garoby 26 February, 2013.
J.M. Jowett, S. Maury, PANIC05 HI Satellite meeting, 23/11/ LHC as a Heavy-Ion Collider An update John M. Jowett, Stephan Maury I-LHC Project CERN.
LHC Injectors Upgrade Project 1/12/2010 R. Garoby.
Filling Schemes for the 2010 Heavy Ion Run Updated (3 rd iteration) version of BCWG presentation initially on 28 September, updated after discussions with.
Final Report – Injector Re- Commissioning Working Group (IRWG) Working group to find strategy for more efficient start-up of injectors and associated facilities.
EU accelerator contributions to the IDS … R. Garoby ISS meeting RAL 28/04/2006.
CONTENT: Beam characteristics and MP concerns BI configuration Operational settings Collimators Planning Shift breakdown Thanks to: P.Baudrenghien, G.Bellodi,
Linac4 Project Meeting 1/2011 3/3/2011 M. Vretenar Update on schedule and structure 1.
H. Matis, S. Hedges, M. Placidi, A. Ratti, W. Turner [+several students] (LBNL) R. Miyamoto (now at ESSS) H. Matis - LARP CM18 - May 8, Fluka Modeling.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Summary of ions measurements in 2015 and priorities for 2016 studies E. Shaposhnikova 3/02/2016 Based on input from H. Bartosik, T. Bohl, B. Goddard, V.
Optics considerations for PS2 October 4 th, 2007 CARE-HHH-APD BEAM’07 W. Bartmann, M. Benedikt, C. Carli, B. Goddard, S. Hancock, J.M. Jowett, A. Koschik,
Optics solutions for the PS2 ring February 11 th, 2008 LIS Section Meeting Y. Papaphilippou.
HP-PS beam acceleration and machine circumference A.LachaizeLAGUNA-LBNO General meeting Paris 18/09/13 On behalf of HP-PS design team.
1. Baseline – from LMC  Presentation by F. Bordry at LHC Machine Committee 5.10 on LS1 Organisation: 1. Linac4 is not going to be connected.
A RHIC Low-Energy Test Run With Protons Todd Satogata (W. Fischer, T. Roser, J. DeLong, M. Brennan, D. Bruno, and others) April 11, 2006 Driven by discussions.
LHC Injectors Upgrade Project 11/11/2010 R. Garoby.
1 NA61/SHINE Collaboration Metting, Dubna, April 7-11, 2014 NA61/SHINE news and plans (October 2013-February 2014) Published papers: Measurements of production.
NA61/SHINE run schedule/plans:
Luminosity monitor and LHC operation
Ion Commissioning: Thursday & Friday
NA61 news and plans (May 2013-October 2013) Publications:
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
MPI-ATL Calor Meeting 7-Sep-2009 H. Oberlack MPI für Physik, Munich
30 May 2017, FCC-Week, Berlin, Germany
Plans for ions in the injector complex D
LINAC4 Vacuum Control System Review
NA61 news and plans News from other labs/experiments
of secondary light ion beams
of secondary light ion beams
How to run ions in the future?
LHC status Benoit Salvant (Beams department, Accelerator and Beam Physics group) for the LHC complex teams With many thanks for their inputs to J. Boyd,
LHC Morning Meeting - G. Arduini
LHC Morning Meeting - G. Arduini
CSP Meeting CERN CERN Accelerators in th November 2010
Progress towards Pulsed Multi-MW CERN Proton Drivers
J. Uythoven, W. Venturini Delsolaro, CERN, Geneva
LHC (SSC) Byung Yunn CASA.
Friday :00 machine setup for luminosity run. Better b-to-b stability from injectors. 01:58 stable run with 228 bunches 11:00 luminosity leveling.
LHC Beam Operations Past, Present and Future
Generation of Higher Brightness Beams for LHC
SLHC-PP kick-off meeting, CERN 9 April 2008
Lecture II.
Saturday :42 stable beams fill 3541
LHC Morning Meeting - G. Arduini
LS 1 start date 12th June Schedule Extension 2012 run Extension of 2012 run approved by the DG on 3rd July 2012.
Presentation transcript:

IEFC WS March 2011 Middle-Long Term Needs for Ion Beams S. Maury 111 Middle-Long Term Needs for Ion Beams S.Maury Thanks to T. Bohl, C. Carli, D. Kuchler, J. Jowett, S. Hancock, D. Manglunki for their help. Plan for LHC and SPS Heavy Ion Programmes Plan for Medical Application Programme Plan from 2011 to 2021

IEFC WS March 2011 Middle-Long Term Needs for Ion Beams S. Maury 2IEFC WS March Middle-Long Term Needs for Ion Beams: 2011 LHC: - Increase the number of bunches with intermediate (200ns) or nominal (100ns) bunch spacing, energy 3.5 Z TeV, projected luminosity (= cm -2 s -1 ) - In order to reduce the Pb source reloading time, a study of the cost and benefits of an extra source should be recommended. - Study and feasibility test of p-Pb collisions. NA61: - Physics with fragmented Pb ion beam - Scheme with 2(3) injections to be compatible with LHC filling. - Prepare tunes for all requested energies and optimize the spill structure - Improve the H2-Beam instrumentation (calibration of the transformer on T2?) and beam extraction Note: Proton and ion beams are not compatible in the North Area To make physics with fragmented ion beam (weeks 47-50), 2 weeks of tests and commissioning are needed (weeks 45 and 46). UA9: - Test in the North Area and in the SPS with Pb ion beam ITHEMBA: Preparation of the collaboration work started

IEFC WS March 2011 Middle-Long Term Needs for Ion Beams S. Maury 3 NA61 History 2010: test TEST 2011: test Frag Frag 2012: Ar shutd Frag 2013: Frag Ar Shutd 2014: Xe Xe my presentation

IEFC WS March 2011 Middle-Long Term Needs for Ion Beams S. Maury 444 Middle-Long Term Needs for Ion Beams: 2012 LHC: Either physics with p-Pb (and Pb-p) ion collisions (depending on the test in 2011 and physics requirements) or Pb-Pb collisions with Nominal beam. The matching 100 ns filling scheme needs to be set-up for the proton beam. NA61: Physics with fragmented Pb ion beam – Prepare tunes in advance for all requested energies (not done in 2011) (20, 40, 158 AGeV/c ?) NA63: Physics with primary Pb ion beam – needs debunching – can it be done with an LHC beam type or should it be a new beam? – Should be done in a Pb ion period only UA9: Test in the North Area and in the SPS with Pb ion beam ITHEMBA: Preparation of the settings for Ar and Xe ions.

IEFC WS March 2011 Middle-Long Term Needs for Ion Beams S. Maury 55 CERN – NA61 – iThembaLABS iThembaLABS have acquired an identical ECR ion source. The source is being installed and connected. Testing starts now! CERN – iThembaLABS collaboration: CERN provides input on operation of the source to speed up commissioning at iThembaLABS. A CERN staff is in Cape Town now! iThembaLABS will investigate producing argon and xenon ions from this source, and investigate the long term stability of the charge states CERN needs. This speeds up CERN’s tests in 2013.

IEFC WS March 2011 Middle-Long Term Needs for Ion Beams S. Maury 666 Middle-Long Term Needs for Ion Beams: 2013 General Shutdown: installation of: – dispersion suppressor collimators in LHC-IR3 (?) (should improve ion intensity limits) – the safety hardware in the SPS for the light ions programme with primary beam in the North Area NA61: Commissioning of the source+RFQ with Ar and Xe ions. A short period to run the Linac3 is requested. As the South Africa collaboration should already have produced Ar and Xe the year before, the CERN commissioning will have a head start and take less time.

IEFC WS March 2011 Middle-Long Term Needs for Ion Beams S. Maury 777 Middle-Long Term Needs for Ion Beams: 2014 This year will not be a normal year of operation LHC: Physics with Pb-Pb ion beam collision at top energy, performance depending on limits, projected luminosity ( cm -2 s -1 ) NA63: Physics with primary Pb ion beam (depending of the 2012 run) The SPS light ion (Ar) could be scheduled only if LHC Pb beam is not requested (should be known by June 2014). The safety hardware and the debunching are needed.

IEFC WS March 2011 Middle-Long Term Needs for Ion Beams S. Maury 8IEFC WS March Middle-Long Term Needs for Ion Beams: : LHC: - Physics with Pb-Pb ion beam collision with the nominal beam at top energy at the end of the year. Continue to integrate Pb- Pb luminosity. NA63 continues(?) NA61: - Ar ion or Xe ion physics with primary beam depending whether Ar ion physics took place in The accelerators should start in March; 2016: LHC: - Physics with p-Pb (if requested) or Pb-Pb collisions at top energy with maximum luminosity, scheduled at the end of the year. NA61: - If Xe ion physics was not done in 2015, then it could be done during the first part of the year. The accelerators should start in March;

IEFC WS March 2011 Middle-Long Term Needs for Ion Beams S. Maury 9IEFC WS March Middle-Long Term Needs for Ion Beams: : Shutdown: installation of dispersion suppressor collimators in LHC-IR2 in order to increase the BFPP (Bound Free Pair Production) limit on luminosity. Installation and beam commissioning for a Medical Application programme can only start in 2017 (The light ions requested should be defined 5 years in advance for the study of new source and RFQ (Oxygen and lighter ions?). 2018: LHC: Physics with Pb-Pb at full energy with higher luminosity (larger than in 2015) thanks to IR2 modifications. NA61: Primary Pb beam at 3 energies with the upgraded experiment (high statistics) Medical Application programme could take place.

IEFC WS March 2011 Middle-Long Term Needs for Ion Beams S. Maury 10IEFC WS March IEFC WS March Middle-Long Term Needs for Ion Beams: : LHC: Physics with p-Pb or, possibly, d-Pb collisions. The latter would need a second source to produce deuterons, a second RFQ, a LEBT and a switchyard (to be decided more than 5 years earlier if needed but decision best made at the same time as medical light ions). The commissioning of the new source, RFQ, LEBT, Linac3 should be done during the 2017 shutdown. Medical Application programme could take place. 2020: LHC: Physics with Ar-Ar collisions. Already commissioned in the injectors, Ar ion beam is ready Medical Application programme could take place. 2021: Shutdown

IEFC WS March 2011 Middle-Long Term Needs for Ion Beams S. Maury 11IEFC WS March IEFC WS March Conclusion A road-map for the ALICE heavy-ion physics programme in the LHC has been prepared for the medium term (to 2020). A compatible schedule for other users of ion beams has been proposed. The ion injectors have a very tight programme up to For the physics programme in 2017, some decisions are needed during Official projects only exist(ed) for Pb LHC and NA61. The LHC has priority as the principal user of ion beams from the injectors. However the ion injector complex must also support a diverse physics programme (NA61, NA63, possible medical applications) whose needs should not be forgotten. Good planning and communication, for both day-to-day and longer- term scheduling, are essential.