Dark Energy Survey (DES) (Presenter: Douglas Tucker) DES is observing (Aug. 15 th – Feb. 15 th ) Year 2 Operations Collaboration Meeting in Sussex, UK,

Slides:



Advertisements
Similar presentations
Welcome to the University of Michigan – Dearborn Observatory Founded 2007.
Advertisements

Ramesh Gupta, BNL D1 Dipole Design / IR Magnet Study LARP Collaboration Meeting, Oct 5-6, D1 Dipole Design Task (terminated in 2005) IR Magnet Study.
Brenna Flaugher Sept. 26, The Dark Energy Survey Camera: DECam 1.1 Management 1.2 Focal Plane Detectors 1.3 Front End Electronics 1.4 Optics 1.5.
CMSC 2006 Orlando Active Alignment System for the LSST William J. Gressler LSST Project National Optical Astronomy Observatory (NOAO) Scott Sandwith New.
David James (CTIO) for the Dark Energy Survey Pan-STARRS1: Science Results STScI, Baltimore - 24 June 2014 Dark Energy Camera – DES: YR1 of the Dark Energy.
Dark Energy Camera Observing Strategy James Annis Experimental Astrophysics Group Fermilab.
1 PreCam Analysis Plans Douglas L. Tucker PreCam Observing Run Wrap-up Telecon 27 January 2011.
1 FNAL-ANL PreCam Reductions Douglas L. Tucker (FNAL) DES Collaboration Meeting ICG, Portsmouth PreCam Parallel Session 29 June 2011.
Cost, Schedule & Funding Closeout Jan Joint DOE/NSF CD2/3a Review 1 DOE/NSF Review of the Dark Energy Survey (DES) Project SC 6/7 Cost, Schedule.
1 PreCam Results & Plans (Version: 9 May 2011) Douglas L. Tucker (FNAL) DES Directors’ Council Review May 2010.
H.E.S.S. High Energy Stereoscopic System Jon Cerny Bancroft-Rosalie School August 2002.
1 Virgo Commissioning progress and plans ILIAS, Jan 23 rd 2007 Matteo Barsuglia on behalf of the Commissioning Team.
The Photometric Calibration of the Dark Energy Survey D. L. Tucker 1, S. S. Allam 1, J. T. Annis 1, R. Armstrong 2, J. P. Bernstein 3, E. Bertin 4, D.
The KPNO 4m “Mayall” Telescope Arjun Dey (NOAO). National Optical Astronomy Observatory Mission: provide the best ground-based astronomical capabilities.
PreCam: Lessons Learned, version 0 Kyler Kuehn
2.4m Telescope Group Yunnan Observatory of CAS Status of LiJET Project & The Coude Echelle Spectrograph for the Lijang 1.8m Telescope China-Japan Collaboration.
Michigan/MIKE Fiber System (MMFS) – Update Apr 2005.
Construction of the Dark Energy Camera Brenna Flaugher, DECam Project Manager CTIO Nov John Peoples (1 st DES Director ) Symmetry Magazine.
Douglas L. Tucker (FNAL) SISPI Meeting 22 February 2007 Sky Camera DB Inputs.
SALT Technology Development Lisa Crause India-South Africa Astronomy Workshop – SAAO 6 August 2012.
1 PreCam Data Mini-Workshop Report Douglas L. Tucker DES-Calib/PreCam Telecon 11 February 2011.
Calibration Plan for Early DES Data
CCDs in space: the effects of radiation on Hubble’s Advanced Camera for Surveys (ACS) Max Mutchler, David Golimowski (Space Telescope Science Institute),
March 2, 2007 DESDM Director's Review - Mohr Director’s Review of DESDM NCSA Director’s Review took place at NCSA on February 20, 2007 NCSA Director’s.
The Observations of LAMOST Jianrong Shi NAOC 1/
Office of Science U.S. Department of Energy DOE/NSF Review of DES 2 Science (SC1) Andy Albrecht (UC Davis) & Nicholas Suntzeff (Texas A&M) 2.2 Findings.
Status Report on Advanced Mesospheric Temperature Mapper Activities at ALOMAR Mike Taylor, P.-Dominique Pautet Utah State University ASAC Meeting - Hamburg,
1 PreCam’s Progress Douglas L. Tucker for the PreCam Team FCPA Chalk Talk Notes Fermilab, 10 February 2011.
1 Calibration & PreCam Douglas L. Tucker (FNAL) DES Collaboration Meeting CIEMAT, 6 May 2010 Outline: I.Calibration Plan Overview II.Updates.
FLAO system test plan in solar tower S. Esposito, G. Brusa, L. Busoni FLAO system external review, Florence, 30/31 March 2009.
The KiDS survey. VISTA 4m telescope 0.6 sq.deg. InfraRed camera 16 2kx2k detectors 0.35” pixels VST 2.6m telescope 1 sq.deg. optical camera (OmegaCAM)
John Peoples for the DES Collaboration BIRP Review August 12, 2004 Tucson1 DES Management  Survey Organization  Survey Deliverables  Proposed funding.
SAMS Project David Buckley, Hitesh Gajjar & John Menzies May 2014.
Astronomical Instrumentation at Texas A&M Jennifer Marshall Darren DePoy.
Office of Science U.S. Department of Energy DETF Recommendations I 2.1Science (Charge questions 1, 2, 7) Andy Albrecht & Nicholas Suntzeff 2.1.2Comments.
1 PreCam Update: Simulations Douglas Tucker, DES-Calib Telecon, 28 Jan 2008 Courtesy: NOAO/AURA/NSF UM Curtis-Schmidt SMARTS 1m SMARTS 1.5m SMARTS 0.9m.
Dark Energy Survey Status John Peoples Presentation to the Fermilab PAC 6 March 2009.
Jim Annis for the DES Collaboration BIRP Meeting August 12, 2004 Tucson Design of the Dark Energy Survey James Annis.
The Photometric Calibration of the Dark Energy Survey D. L. Tucker 1, S. S. Allam 1, J. T. Annis 1, R. Armstrong 2, J. P. Bernstein 3, E. Bertin 4, D.
7/26/2006 Wyatt Merritt 1 DECam CD1 Documentation DOE Critical Decision Process Documentation Requirements.
AST3-1 photometry from Dome A Bin Ma, Peng Wei, Yi Hu, Zhaohui Shang NAOC AST3
CTIO and the Dark Energy Camera Prepared for the CD-1 Director’s Review Tuesday, July 25, 2006 Fermilab Alistair R. Walker.
Calibration of the LSST Camera Andy Scacco. LSST Basics Ground based 8.4m triple mirror design Mountaintop in N. Chile Wide 3.5 degree field survey telescope.
Astronomy 1010-H Planetary Astronomy Fall_2015 Day-21.
DES Cluster Simulations and the ClusterSTEP Project M.S.S. Gill (OSU / CBPF / SLAC) In collaboration with: J. Young, T.Eifler, M.Jarvis, P.Melchior and.
Understanding Aperture Overview & Refresher. Choosing Exposure Modes Aperture Priority Mode Lets you choose the aperture needed to obtain the depth of.
1 The DES Calibrations Effort Douglas L. Tucker (DES Calibrations Scientist) DES NSF/DOE Review, 8-9 June 2009 The DES Calibrations Effort has connections.
Meteorological Site Evaluation and Forecasting needs for the Southern African Large Telescope (SALT) D. A. Erasmus Certified Consulting Meteorologist and.
Analysis trains – Status & experience from operation Mihaela Gheata.
Instrumental Surface Temperature Record Current Weather Data Sources Land vs. Ocean Patterns Instrument Siting Concerns Return Exam II For Next Class:
Cosmic Frontier Experiment Status August 25, 2014 ExperimentLocationStatusStart of operations Nominal end of operations Physics SuperCDMSSoudanOperatingMar.
1 Small Telescopes and the Photometric Calibration of the Sloan Digital Sky Survey (SDSS) Douglas Tucker.
Image of M8, taken by the AEOS Burst Camera 1 Heather Swan Physics Department University of Michigan Carl Akerlof, Timothy McKay, Eli Rykoff, Donald Smith,
System Performance Metrics and Current Performance Status George Angeli.
Mountaintop Software for the Dark Energy Camera Jon Thaler 1, T. Abbott 2, I. Karliner 1, T. Qian 1, K. Honscheid 3, W. Merritt 4, L. Buckley-Geer 4 1.
National Center for Supercomputing Applications Dark Energy Survey Collaboration Meeting Data Management Status December 11, 2006 Chicago Cristina Beldica.
1 Douglas L. Tucker DES Calibration Telecon 23 August 2013 Global Calibration Module (GCM) Photometric Zeropoints For SV-A1: Status Report.
1 DES Calibrations: Remaining Loose Ends for Year 1 (Update: 23 March 2012) Douglas L. Tucker.
1 Douglas L. Tucker (FNAL) Cloud Camera Review 3 January 2008 DES Sky Camera (Cloud Camera)
SDSS Stripe 82 and the Photometric Calibration of the Dark Energy Survey (DES) Douglas L. Tucker (FNAL), for the Dark Energy Survey Collaboration DES Collaboration:
Li, Ting Texas A&M University DePoy, Darren Texas A&M University Burke, David SLAC Kessler, Richard University of Chicago Marshall, Jennifer Texas A&M.
Alistair Walker - DECam Instrument Scientist Tim Abbott – Blanco Telescope Scientist CTIO/NOAO DES Collaboration Meeting Oct The Blanco Telescope.
Commissioning Alistair Walker NOAO/CTIO 9/30/ DES Collaboration Meeting October
Blanco Telescope and DECam Alistair Walker ACTR meeting 22 March 2013
Storm Totals Rainfall (water yr. to date) % of normal to date
Alistair Walker Version 3 December
Feb 27 First team just had to practice
Magellan Telescopes Observatory Report
A “Field Guide” to WFPC2 HLA Image Anomalies
FNAL Production Experience
Presentation transcript:

Dark Energy Survey (DES) (Presenter: Douglas Tucker) DES is observing (Aug. 15 th – Feb. 15 th ) Year 2 Operations Collaboration Meeting in Sussex, UK, Oct darkenergydetectives.org Y1A1 tile DES (Stripe 82)

Y2 Observing Summary So far DES has had 47 scheduled observing nights, 10 half- nights and 42 full nights. 2 # Nights Total Hours Observing Lost Camera or Telescope Lost Obs. Error Lost Weather Aug.992 ¾58 ¾0034 Sept ¼122 ¼¾058 ¼ Oct ½165 ½2 ¼¼33 ½ Total47475 ½346 ½30125 ¾ 100%73%½ %½ %0%26% The first 7 half-nights were great and included seeing records in all DES filters Next 6 weeks was among the worst in 31 yrs CTIO Improved since mid-October

Y2 WF Survey Status Individual WF exposures are graded “Good” or “Bad” as part of the DESDM “1 st Cut” output. This informs the “Exposure Table” on the mountain so OBSTAC knows if the exposure needs to be redone. Right: WF tilings after night of Oct. 31 –Lt Blue: last Yr, Dk blue: this Yr, Red: last night Y1 gaps getting filled in nicely Especially in r, i-band 3 # WF Images # WF Good # WF “Bad” Aug (69%)427 Sept (59%)967 Oct (73%)890 Total (70%)2284

Y2 SN Survey Status In Y1 the SN fields had a median # days between revisits of about 6.5 days. The maximums gaps were 11 to 16 nights. Gaps so far in Y2 are 12 to 21+ nights (see right) In Y2, bad weather bracketed a 3 night stretch when DES didn’t have the telescope. Improved somewhat since 4 Oct 31 # Completed Shallow Fields # Completed Deep Fields Aug.127 Sept.3532 Oct.34

New Dome Environmental Controls: 2 large glycol-cooled air- handlers will better maintain the primary mirror at or just below the air-temperature, minimal temperature gradient within the dome, and internal and external air temperatures matched. Finished, now commissioning automatic controls. New Primary Mirror Support Pad air-pressure controls –The present system controls mirror shape depending on gravity vector with an astigmatic correction. 33 of 33 with higher resolution air-pad controls installed. Perhaps some improvement in seeing is already being attained. –New “Hexapod” (Focus ) Default –D0Nut studies indicate that primary mirror aberrations can be better zeroed-out. This new system will need commissioning to achieve the improvement. December 1-5 Engineering. A FNAL Team to –Replace LN2 pump, improve 1 of the LN2 line segments, repair a scroll pump 5 Recent Improvements for DECam/Blanco ✔ ✔ We started keeping image quality records in Y1. This year we have new records in all filters. ✔

DES Observers Y2 DES Observers so far from FNAL, Texas A&M, CTIO, U. Chicago, ANL, BNL, Brazil, SLAC, LBL, U.K., OSU, Barcelona, ETH Zurich – most of the collaboration institutions 6

Year 1 Annual Reprocessing: Calibrations 7 Year 1 Relative Calibrations Goal: 4% rms Achieved: < 2% rms -3.0% 0.0% +2.0% Credit: Eli Rykoff

Summary & Perspective Y2 started great. Then we has 6 weeks of lots of clouds. Lately the weather has improved. It should just get better as it warms up in Chile. When the dome is open we are doing well. Ahead of last year’s pace because the seeing has been better and we’ve been about 5% faster. DECam NEO from TOO: “Working for you to save the planet” (picture from Frank Valdes, NOAO) 8

Gaps 10/30/14 Better View 9