Machine status – December 28  Machine status - overview  Blue ring: ramp development  Yellow ring: obstruction update  Set-up and ramp-up.

Slides:



Advertisements
Similar presentations
AGS/Booster Issues Feb. 25, 2014 Time Meeting Haixin Huang.
Advertisements

Run 9 polarized proton Log 9 Jan begin 45 degree cool down from room temp (3 MW-NEW) 2 Feb, Cool-down to 4.5 degrees begins 5 Feb, Blue ring cold but still.
RHIC Status Haixin Huang Time Meeting 02/1/2011. Jan. 26 Ring access for six hours to fix jet and many other jobs. Difficulty to provide 28X28 store overnight.
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
LHC progress Saturday 2 nd May 2015 Coordination: Mike Lamont, Wolfgang Hofle.
LHC 15 April :19: UFO event detected by on BLM 15.R8 and beam dump 8:46: P2 cold compressor trip and recovery during morning shift. Access given.
1 IR Vacuum M. Sullivan MAC Review Jan , 2006 M. Sullivan for the Machine Advisory Committee Review January 18-20, 2006 IR Vacuum.
July 22, 2005Modeling1 Modeling CESR-c D. Rubin. July 22, 2005Modeling2 Simulation Comparison of simulation results with measurements Simulated Dependence.
Injection test? Mike Lamont For initial discussion.
AGS pp Status Feb. 20, 2015 RSC Meeting Haixin Huang.
1 Near-term machine performance — The next 5 years, before e-cooling — Wolfram Fischer Run Coordinator for RHIC Run-4 Open Meeting on RHIC Planning Berkner.
LHC progress with beam & plans. Of note since last time Transverse damper Beta beating in the ramp Collimation set-up at 450 GeV & validation LBDS – systematic.
AGS/Booster PP Setup Plan Jan. 11, 2013 RSC Meeting Haixin Huang.
Y. Ohnishi / KEK KEKB-LER for ILC Damping Ring Study Simulation of low emittance lattice includes machine errors and optics corrections. Y. Ohnishi / KEK.
August 05, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.
Recycler Status and Plans Shekhar Mishra MID/Beams Division Fermilab AAC Review 2/4/03 Introduction to the Recycler Ring Recycler Improvements and status.
Overview Run-6 - RHIC Vadim Ptitsyn C-AD, BNL. V.Ptitsyn RHIC Spin Workshop 2006 RHIC Run-6 Timeline  1 Feb – Start of the Run-6. Start of the cooldown.
RHIC Status Haixin Huang Time Meeting 01/18/2011.
Machine - Experiments January 12, 2005 Machine status.
Machine-Experiments January 19, 2005 Machine status.
Injector PP Setup Plan and Status November 18, 2008 Haixin Huang.
May 17, 2005Wednesday Experiment Meeting BNL, Upton Acceleration beyond 100 GeV  Goal To evaluate the spin dynamics beyond 100 GeV  What’s the impact.
Preparation for RHIC PP Run in 2011 Wednesday 20, 2010 RHIC Machine Planning Meeting Haixin Huang RUN website: RUN.
RHIC Run14 Time Meeting. Run14 Status – Apr. 29 Operations running well, 11 full stores over the past 7 days; setting STAR ZDC rates to 50 khz is now.
AGS pp Status Jan. 13, 2015 Time Meeting Haixin Huang.
RHIC Status: Startup Run 12 V. Schoefer RHIC Spin Collaboration Meeting 1/13/12.
1 BROOKHAVEN SCIENCE ASSOCIATES Storage Ring Commissioning Samuel Krinsky-Accelerator Physics Group Leader NSLS-II ASAC Meeting October 14-15, 2010.
LHC progress Report LHCC Wednesday 23 rd March 2011.
R. Assmann - LHCCWG Two Beam Operation R.W. Aßmann LHCCWG Acknowledgements to W. Herr, V. Previtali, A. Butterworth, P. Baudrenghien, J. Uythoven,
RHIC Run14 Time Meeting. Run14 Status – Apr. 15 Operations running well, 12 stores over the past 7 days with 1 lost to another “super quench”. Testing.
RHIC Run14 Time Meeting. Run14 Status – Apr. 22 Operations running well, 12 stores over the past 7 days with 1 “super store” of 17 hours. Repositioned.
LHC Progress Friday 30 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
Proton Plan PMG 9/27/07 E Prebys 1 Proton Plan Status Eric Prebys.
F All Experimenters' Mtg - 2 Jun 03 Weeks in Review: 05/19/03 –06/02/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
AGS/Booster PP Setup Status Feb. 5, 2013 Time Meeting Haixin/Vincent.
Feb. 23, 2005Wednesday Experiment Meeting BNL, Upton Status on AGS cold snake  Cold mass is now in the cryostat. It is in the phase of wiring, and because.
APEX RUN-14 APEX Schedule April 1, :00am Store Elens commissioning Gu, Fischer, Luo, Simon 10:00am 4:30pm2:00pm AC dipole setup Bai Momentum Aperture.
Preparation Status of pp Run11 Haixin Huang Time Meeting 12/21/
Monday :00 Injection for physics fill # :00 Stable beams fill #1816, luminosity ~1.2x1033 cm-2s-1 11:08 Beams dumped. QPS trigger on detector.
Nuclear Phase Transition Diagram Mar RHIC Monday Meeting T. Satogata DOE NSAC Long Range Plan … a whole page! (one out of 14)
From yesterday LHC status Wednesday 26 th Welcome Verena back on shift 07:08 Access in PM85 for piquet EPC (O.Fournier).  Fuse on RD2.R8 circuit.
RHIC Run14 Time Meeting. Run14 Status – May 27 Operations running well, 11 full stores over the past 7 days. Getting high intensity again from injectors,
RHIC Run14 Time Meeting. Run14 Status – June 24 Run14 He3-Au physics declared on 6/20 with Fill #18460; stochastic cooling is ON for Au beam, longitudinal.
LHC progress Sunday 3rd May 2015 Coordination: Mike Lamont, Wolfgang Hofle.
 Safety  Schedule: Past, Present and Future  RHIC and Experiments Reports  Machine and Systems Reports  AOB.
APEX Schedule April :30am12:30pm5pm IBS suppression lattice Litvinenko, Tepikian +team Back 2 Phys 4pm Nonlinear Chromaticity (Response.
Outline of 2014/2015 plans V. Kain, M. Lamont, J. Wenninger 6/18/2013Optics Measurement and Correction Review
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
RHIC Status April 8, 2011 RSC Meeting Haixin Huang.
Run 10 Start-up Status
APEX Studies: Accelerating w. Near 3 rd Order Resonance Vincent, Al, Michiko, Steve, Don, Yun, Guillaume, Mei, Todd, Wolfram, Greg, …
Workshop on Accelerator R&D for Ultimate Storage Rings – Oct Nov.1 – Huairou, Beijing, China A compact low emittance lattice with superbends for.
Monday 19 th March 07:33 Lost (another) beam in the squeeze, beyond 2 m, B2 hits 1/3 resonance. 08:30 Start (another) ramp  Try to correct coupling and.
Wakefield effect in ATF2 Kiyoshi Kubo
Injector Status Jan. 26, 2016 Time Meeting Haixin Huang.
RHIC Status Haixin Huang Time Meeting 01/25/2011.
ATF2 Status N.Terunuma, KEK
MD2036: UFO dynamics studies and UFO fast detection
Monday :00 Stable beams 9_6_6_6 13:40 Access.
Friday 07:00 Power glitch on the EDF network. Point 8 affected.
LHC Morning Meeting - G. Arduini
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
Thursday morning – optics correction
CASA Collider Design Review Retreat Other Electron-Ion Colliders: eRHIC, ENC & LHeC Yuhong Zhang February 24, 2010.
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
Planning at 5 o’clock meeting Friday
Friday 16/3 08:30 – 10:15 Access for QPS and EPC (BI in point 4)
Wednesday 09 March …:09:00: beta* measurement (1.5 m) by K-modulation and with AC-dipole excitation. 1/17/2019 LHC 8:30 meeting.
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
Summary for LPC (March 7th, Ralph Assmann)
Presentation transcript:

Machine status – December 28  Machine status - overview  Blue ring: ramp development  Yellow ring: obstruction update  Set-up and ramp-up

Hot from the press….

Machine status - overview Yellow ring At operating temperature PS high-current tests and shut-off done yesterday Beam activity during owl shift tuesday  obstruction (more later) Blue ring almost re-commissioned for physics (highlights and yet-to-do’s later) Injectors longitudinal emittance re-establish high intensity (Tandem source change yesterday Tandem, Booster and AGS tuning)

Blue ring – set-up with beam Established ramp with 90%+ transmission key issues  transition and early stone tuning (orbit, chromaticity)  coupling control at beta* squeeze  permit pulls: Artus re-configuring, adjusting slow loss thresholds Increased intensity up to ~4e9/bunch and #bunches (ramped 14, 28, 45, 55 bunch patterns, 68 at injection) (tolerable) pressure rise at bi8, bi12, bo2

Blue ramp 55 bunches – 3-4e9 Transmission of ramps

Blue – yet to do  High bunch intensity development (>4e9/bunch) with interlock on low intensity bunches  Re-bucketing (RF prep work done)  Dispersion in IR8 (2m+)  AC dipole, optics measurements

Operating scenarios Evaluate collision and event rates for possible operating scenarios: Number of bunches Bunch intensity e e e Phobos pressure rise?

Yellow obstruction - chronicle Tuesday 28 (owl  eve)  Beam not circulating - ~250 turns survival – beam loses energy  High losses in Q3-Q4 warm section, sector 4, does not respond to initial aperture scan  Linear energy loss. Calculation (independently by 3 people) indicates that loss is consistent with ~20micron worth of material (SS or Cu) – rules out valves, bellows, RF fingers… (valve in q3-q4 functioning is checked)  Radiation survey done radiation starts from middle of SC tank  Install 4 new BLM’s in Q3-Q4 region  Decide to continue diagnosis with beam to better characterize the obstacle

Yellow obstruction – cont’ Q3Q4 Warm section SC RF systems, vacuum valves Radiation survey New BLM’s Comparison with nov28 data Check new BLM’s, BPMs at SC  confirm cause (SC kicker? Valve? Bellow?)  fix it Radiation survey

Yellow obstruction – cont’ Wednesday 29 (owl  day)  Improve injection and orbit in the machine  Resolve configuration issues in the BLM system that confused analysis of losses, confirm that the BLM downstream SC tank is The One  Move beam +10mm vertical and -10mm horizontal and find hole  circulating beam  Aperture ~few mm, not enough for operating  More work (move SC tank, jaws, etc), no sizeable improvement  OPEN VACUUM AT SC TANK (11am today)  find aluminum

Fixing scenarios Piece of aluminum foil found in the NEG pipe downstream of SC tank From Hseuh – 8:30am today Case 1. remove SC tank, install pipe 2days Case 2. remove obstruction, leave SC in place option 1: close, pump, leak check 2 days (pressure rise) option 2: add N2 flush to option 1 3days Pump down today Beam (blue) at ~6pm Open yellow valve tomorrow ~mid day Hopefully back with yellow beam

Impact of set-up/start-up  Continue work with blue on owl – if possible  Yellow set-up delay by another 2-3 days This is still consistent with end of “2 weeks” set-up by Jan 11 (collisions overnight) But this assumes that repair in Sector 4 goes according to schedule and there NO FURTHER MAJOR SYSTEM PROBLEMS