Dale E. Gary Professor, Physics, Center for Solar-Terrestrial Research New Jersey Institute of Technology 1 9/25/2012Prototype Review Meeting.

Slides:



Advertisements
Similar presentations
Hardware Integration of the Prototype Wes Grammer NRAO September 24-26, 2012EOVSA Prototype Review1.
Advertisements

SVN-49 Signal Anomaly Presented by Tom Stansell GPSW POC: Lt. Col. James Lake, Ph.D.
Digital FX Correlator Nimish Sane Center for Solar-Terrestrial Research New Jersey Institute of Technology, Newark, NJ EOVSA Technical Design Meeting.
Dale E. Gary Professor, Physics, Center for Solar-Terrestrial Research New Jersey Institute of Technology 1 9/25/2012Prototype Review Meeting.
Software Defined Radio Testbed Team may11-18 Members: Alex Dolan, Mohammad Khan, Ahmet Unsal Adviser: Dr. Aditya Ramamoorthy.
Dale E. Gary Professor, Physics, Center for Solar-Terrestrial Research New Jersey Institute of Technology 1 9/24/2012Prototype Review Meeting.
Implement a 2x2 MIMO OFDM-based channel measurement system (no data yet) at 2.4 GHz Perform baseband processing and digital up and down conversion on Nallatech.
OVSA Expansion Software Overview Gordon Hurford Kickoff Meeting NJIT 25-Oct-2010.
Dale E. Gary Professor, Physics, Center for Solar-Terrestrial Research New Jersey Institute of Technology 1 3/15/2012OVSA Preliminary Design Review Meeting.
Dale E. Gary Professor, Physics, Center for Solar-Terrestrial Research New Jersey Institute of Technology 1 3/16/2012OVSA Preliminary Design Review.
Bill SahrEVLA M&C Transition System Software CDR December 5-6, EVLA Monitor & Control Transition System Software Overview.
Dale E. Gary Professor, Physics, Center for Solar-Terrestrial Research New Jersey Institute of Technology 1 11/7/2011OVSA Technical Design Meeting.
Dale E. Gary Professor, Physics, Center for Solar-Terrestrial Research New Jersey Institute of Technology 1 11/7/2011OVSA Technical Design Meeting.
Gelu M. Nita NJIT. Noise Diode Control Day/Night Attn. Ctrl. Solar Burst Attn. Ctrl. V/H RF Power Out Attn. Ctrl. Temperature Sensors.
Prospects for High-Frequency Calibration with the SMA Dual-IF/Receiver System Todd R. Hunter, Jun-Hui Zhao (CfA) Sheng-Yuan Liu, Yu-Nung Su, Vivien Chen.
Dale E. Gary Professor, Physics, Center for Solar-Terrestrial Research New Jersey Institute of Technology 1 03/16/2012OVSA Preliminary Design Review.
Dale E. Gary Professor, Physics, Center for Solar-Terrestrial Research New Jersey Institute of Technology 1 09/24/2012Prototype Review Meeting.
1PPS Timing and Reference Distribution Subsystem Wes Grammer NRAO March 15-17, 2012EOVSA Preliminary Design Review1.
C. ChandlerEVLA Advisory Committee Meeting September 6-7, Scientific Commissioning Plan Claire Chandler.
Hunt for Molecules, Paris, 2005-Sep-20 Software Development for ALMA Robert LUCAS IRAM Grenoble France.
ADASS XI Sept30-Oct3, 2001 The ALMA Common Software (ACS) as a basis for a distributed software development G.Raffi, G.Chiozzi (ESO), B.Glendenning (NRAO)
Dale E. Gary Professor, Physics, Center for Solar-Terrestrial Research New Jersey Institute of Technology 1 09/24/2012Prototype Review Meeting.
Dale E. Gary Professor, Physics, Center for Solar-Terrestrial Research New Jersey Institute of Technology 1 03/15/2012Preliminary Design Review.
2005 Jan 28Meudon FASR Meeting 1 / 25 FASR Subsystem Testbed (FST) Overview Meudon Meeting 28 Jan 2005.
Basic concepts of radio interferometric (VLBI) observations Hiroshi Imai Department of Physics and Astronomy Graduate School of Science and Engineering.
THEMIS-SCM THM – SCM – CDR – 08-April-2004 in Velizy
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array Emmanuel Momjian (NRAO)
Dale E. Gary Professor, Physics, Center for Solar-Terrestrial Research New Jersey Institute of Technology 1 9/25/2012Prototype Review Meeting.
Dale E. Gary Professor, Physics, Center for Solar-Terrestrial Research New Jersey Institute of Technology 1 9/26/2012Prototype Review Meeting.
TOW 2007: Correlator Theory Kerry Kingham - U.S. Naval Observatory Roger Cappallo – Haystack Observatory Mike Titus - Haystack Observatory.
Dale E. Gary Professor, Physics, Center for Solar-Terrestrial Research New Jersey Institute of Technology 1 03/16/2012OVSA Preliminary Design Review.
8/12/201514th RHESSI Workshop 1 Dale E. Gary, Center for Solar-Terrestrial Research, Physics Department, NJIT.
Digital Packaging Processor Gordon Hurford Jim McTiernan EOVSA PDR 15-March-2012.
EOVSA Data and Database System Gordon Hurford and Jim McTiernan EOVSA Prototype Readiness Review 24-Sept-2012.
Correlator Growth Path EVLA Advisory Committee Meeting, March 19-20, 2009 Michael P. Rupen Project Scientist for WIDAR.
1 EVLA System Commissioning Results EVLA Advisory Committee Meeting, March 19-20, 2009 Rick Perley EVLA Project Scientist.
Abstract The purpose of this project is to create a fully functional 8.5 meter radio telescope which can receive signals at a frequency of 1.42 GHz. The.
Long Term Transition Plan Gareth Hunt EVLA M&C PDR 2002 May 15.
Dale E. Gary Professor, Physics, Center for Solar-Terrestrial Research New Jersey Institute of Technology 1 9/25/2012Prototype Review Meeting.
Observing Modes from a Software viewpoint Robert Lucas and Philippe Salomé (SSR)
FASR Software Considerations Gordon Hurford SSL AUI – August 2007.
Jason Manley, Aaron Parsons, Don Backer, Henry Chen, Terry Filiba, David MacMahon, Peter McMahon, Arash Parsa, Andrew Siemion, Dan Werthimer, Mel Wright.
EOVSA STATE FRAME ASSEMBLY, DISTRIBUTION, AND SYNCHRONIZATION Gelu Nita NJIT MARCH 2012 EOVSA PDR MEETING 1.
EOVSA Data and Database System J. McTiernan EOVSA CoDR 25-April-2011.
1 KFPA Critical Design Review – Fri., Jan. 30, 2009 KFPA Data Pipeline Bob Garwood- NRAO-CV.
14 June, 2004 EVLA Overall Design Subsystems II Tom Morgan 1 EVLA Overall Software Design Final Internal Review Subsystems II by Tom Morgan.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array Observing Scripts Basic.
Station Board Testing EVLA Correlator S/W F2F 3-4 April 2006 D. Fort.
Digital Packaging Processor - Overview Gordon Hurford Nov 7, 2011 EOVSA Technical Design Meeting - NJIT.
1 Synthesis Imaging Workshop Sept 24-28, 2001, ATCA Narrabri Calibration & Flagging Mark Wieringa  Theory of calibration  Practice - RFI & malfunctions.
EOVSA Pipeline Processing System J. McTiernan EOVSA Prototype Review 24-Sep-2012.
M.P. RupenEVLA Advisory Committee Meeting September 6-7, Correlator Test Plan Michael P. Rupen.
Observations with AMBER  General overview  P2VM  OB preparation with P2PP P2PP / OB / templates Available templates for observation procedure Typical.
Software Requirements for the Testing of Prototype Correlator Sonja Vrcic Socorro, December 11, 2007.
EOVSA Data and Database System J. McTiernan EOVSA Technical DesignMeeting 7-Nov-2011.
Introduction to Multichannel Image Reconstruction, Image Analysis and Display (MIRIAD)
Scenario use cases Szymon Mueller PSNC. Agenda 1.General description of experiment use case. 2.Detailed description of use cases: 1.Preparation for observation.
ASKAP status and commissioning Astronomy and Space Science Max Voronkov | ASKAP Software scientist Kiama - 3 March 2014 Some pictures from Ben Humphreys,
European Pre-AAVS1 Update AADC all-hands, Bologna, 9-13 May 2016 Nima Razavi-Ghods.
What’s New with EOVSA 2017 January What's New with EOVSA 01/10/2017.
Receive Data in Zurich, CZ
EVLA Prototype Correlator (PTC)
EVLA System PDR System Overview
EVLA M/C Software PDR, 14 May 2002
Observational Astronomy
Observational Astronomy
Correlator Growth Path
EVLA Advisory Panel Mtg. System Overview
Drift Chamber Monitoring
Presentation transcript:

Dale E. Gary Professor, Physics, Center for Solar-Terrestrial Research New Jersey Institute of Technology 1 9/25/2012Prototype Review Meeting

 Initial Setup in Electronics Room  Analog hardware assembly  Correlator setup  Computer control and communication  Initial Setup at Antenna  Front end operation  Antenna pointing (optical/radio)  Feed focus  First Fringes  Source tracking (satellite, Sun?)  Receiving/recording data + plotting  Spectral continuity, leveling  Array Configuration  uvw coordinates, delay tracking, etc.  Miriad interfacing  Baseline determination  Schedule 2 9/25/2012Prototype Review Meeting

 Analog hardware assembly  Kjell and Dan will assemble packages as they are completed and shipped (mid-Oct through Nov.)  Cabling, basic interconnectivity, and power levels can be tested with test signals (e.g. Noise Diode, swept CW), by phone/  Correlator setup  After assembly at NJIT and basic testing, the correlator will be shipped to OVRO for integration (mid-November)  Check clock, 1 pps, output of packets, operation via snap blocks (remotely via internet). Do we need LabVIEW test pgm?  Computer control and communication  ACC control of analog hardware (test Modbus over RS-485 as soon as possible, so that final integration is possible remotely via internet)  Schedule control of correlator (initiation, set delays)  Sharing of state frame among computers 9/25/2012Prototype Review Meeting 3

 Front end operation (December—Wes, Gelu, Dale on site)  Hardware connections, verification of power levels.  Develop and verify cRIO control/monitoring of front end  Antenna pointing (optical/radio)  Optical pointing will be done early Oct, for initial pointing corrections (except zero-order offsets)  Radio pointing requires peak-up (or drift scans) on Sun. Can we use raw 1-18 GHz power levels? RFI may limit => require end-to-end signal through correlator. When will DPP be ready—do we need a LabVIEW test program based on EST?  Feed focus  The focus adjustment is manual—what is the procedure?  Should be done at high frequency—what source? Is Sun okay?  Isolating IF band requires end-to-end signal through correlator, possibly also DPP? 9/25/2012Prototype Review Meeting 4

 Source tracking (satellite, Sun?)  Tracking the Sun will be needed for pointing anyway.  Tracking on GPS, XM, etc., will need to be developed.  Receiving/recording data + plotting  DPP will be needed for creating valid Miriad databases.  Plotting can be done without Miriad itself (e.g. on Schedule computer via Aipy), or with Miriad by installing it on the Schedule computer => Pipeline computer not essential.  Correct delays/fringe stopping are not needed, but it would be nice to demonstrate those and get stable phases.  Spectral continuity, leveling  Test DPP operation for untangling spectra.  Test correlator operation for leveling the bandpass. 9/25/2012Prototype Review Meeting 5

 uvw coordinates, delay tracking, etc.  Test generation of uvw coordinates and delays  Seek to get flat phases without phase jumps in DPP output  Miriad interfacing  Verify that Miriad scripts work  Be able to create a working data file with averaging for calibration and science bands  Baseline determination  Source? Test sensitivity on a calibrator (e.g. 3C84). May have to use satellites for rough first determination.  Be able to set up a schedule for observing a calibrator list.  Verify control of all subsystems for a complete observation.  Create a valid baseline calibration file.  Develop Miriad script for analyzing the baseline. 9/25/2012Prototype Review Meeting 6

 2012 Oct-Nov:  Dale & Gelu get ACC/cRIO control of antennas working + rudamentary schedule and stateframe.  Wes sends hardware as it is completed to OVRO, where Kjell and Dan set it up with phone/ support.  Toward end of period, correlator is shipped and set up with phone/ support.  2012 Early Dec:  Wes, Dale & Gelu get front end installed and under control. Fix any problems with rest of system (may require Nimish).  Initial attempt to determine feed best focus.  2012 Late Dec:  Dale, Gelu, Nimish, Gordon, Jim set up DPP, attempt to get first fringes  2013 Jan.:  Dale, Gelu, Nimish, Gordon, Jim, Stephen attempt to determine baseline corrections.  Initial attempt to get calibrated data—evaluation of phase and amplitude stability 9/25/2012Prototype Review Meeting 7