Quick Start Resource – Payment for Start-Up at less than LSL Current NPRR language: ( 8) If a QSGR comes On-Line as a result of a Base Point less than.

Slides:



Advertisements
Similar presentations
IMPACT TO FREQUENCY CONTROL DURING STARTUP AND SHUT DOWN OF UNITS
Advertisements

Ancillary Services and SCED Jeff Gilbertson Market Analyst Congestion Management Working Group 9/4/2013.
ERCOT Draft NPRR Phase 2 ORDC RATF July 8, ERCOT draft NPRR Phase 2 ORDC Draft NPRR will include the following clarifications or additions: Updates.
Unresolved Issues in NPRR 555 Texas Steel Companies July 9, 2013.
RCWG Update to WMS April 9, VCMRR-VC for Cancellation of RUC Committed Resources Paragraph (3) of Nodal Protocol Section regarding Cancellation.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Split Generation Resources (SGRs) (Also known as Jointly Owned.
1 Market Trials Open Market Participant Call Weekly Kick Off Aug 16, 2010.
SBBH Flag Implementation QMWG October 11, SBBH Flag - Background SBBH Flag - Background: –The SBBH acronym stands for “SCED Base Point Below HDL”
March 30, 2015 SCED Event Follow up: Proposed Improvements QMWG, May 08, 2015.
QSE Managers Working Group July 11, 2011 Base Point Deviation – NPRR377 ERCOT Settlement & Billing Group.
1 Generator Telemetry and Market Prices WebEx Training July 28 th, 2015.
ERCOT RMR Deployment and Cost Proposals By: Matt Mereness and Ino Gonzalez.
NPRRs NPRR680 Allow QSEs to Self-Arrange AS Quantities Greater Than Their AS Obligation. This Nodal Protocol Revision Request (NPRR) proposes to allow.
Real Time Mitigation During Exceptional Fuel Cost Events.
Overview of FIP Issues in the RUC, Verifiable Cost, and other Nodal Market Processes January 28, 2009 WMS Meeting.
NPRR 511 and QSGR MOC ERCOT Settlements Meeting Title: WMS Date: March 13, 2013.
1 Settlement Changes R5 (SEP 2015) and R5.5 (OCT 2015) Blake Holt ERCOT COPS 9/14/2015.
August 17, 2011 Reliability Deployments Task Force Meeting Updated Analysis of Non-Spin Deployments and RUC John Dumas Director Wholesale Market Operations.
Guidelines for Verification of Resource Specific Fuel Adders RCWG Paul Vinson.
April, 2008 Maximum Shadow Price. April, 2008 Protocol Requirement: Transmission Constraint Management (2)ERCOT shall establish a maximum Shadow.
Mitigated Offer Cap Presented to: NATF Date: September 29, 2009 By: Mark Patterson, Manager Market Operations Support (ERCOT) 1September 29 NATF Meeting.
Section 5.9 – added export language Each ERS Generator site must have an interconnection agreement with its TDSP prior to submitting an ERS offer and must.
WGR Ramp Rate in Nodal: “As High as Possible” Mike Grimes for QMWG Meeting 10 August 2009.
January 21, 2010 Security Constrained Economic Dispatch Resmi Surendran.
RCWG Update to WMS December 5, General Update Agenda Items for Today: Verifiable Cost Manual clarifications (vote) White Paper on Long Term Fuel.
QMWG – Feb. 26, 2014 Discussion topic: NPRR585 Clarification of Administrative Pricing Requirements for Self-Committed Combined Cycle Combustion Turbines.
Protocol Revision Subcommittee Sandy Morris November 3, 2011.
RCWG Update to WMS May 6, Real-Time Mitigation During Exceptional Fuel Events Option 3 – Increase MOC’s during Cold Weather Events When ERCOT.
1 Reliability Deployment Task Force (RDTF Meeting) December 20 th 2011 December 20, 2011.
RCWG Update to WMS July 11, Alternatives to Address Negative Prices At its June meeting, WMS directed RCWG to bring back something to vote on. RCWG.
Lead from the front Texas Nodal 1 Texas Nodal Startup Eligibility Day-Ahead and RUC Make-Whole Settlements ERCOT Settlements & Billing.
Congestion Management and Ramp Rate for Delivering Ancillary Services Resmi Surendran.
7 August, 2006 TPTF MMS Issues Review Brandon Whittle Lead, Real-Time Market Operations.
Lead from the front Texas Nodal 1 Texas Nodal Day-Ahead CRR Settlements Business Requirements TPTF Presentation ERCOT Settlements.
Appeal of PRS Action NPRR 351, Calculate and Post Projected Non-Binding LMPs for the Next 15 Minutes Floyd Trefny Texas Steel Companies.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Nodal Verifiable Costs Process WMS Meeting May 15, 2007 Ino.
CMWG Update to WMS Report of CMWG Meetings of &
GTBD Forecasting Using SCED to Produce Projections of Future LMPs Floyd J. Trefny February 17, 2011.
1 Tests for Reasonable LMPs & Price Validation Tool Overview October 27, 2009 NATF.
Floyd Trefny, P.E. Director of Wholesale Market Design Nodal Market Tools to Manage Wind Generation January 29, 2009 Presentation to the Renewables Technology.
WMS Meeting, October 10, RCWG Continuing Efforts  NPRR 747 Price Correction No consensus on this issue  RCWG needs additional guidance on the.
QSE Managers Working Group Report to WMS, April 8, 2011 S. Looney, Luminant.
DSWG Update to WMS 2/9/2011. EILS Procurement Results from 1/31 Business Hours 1 HE 0900 through 1300, Monday thru Friday except ERCOT Holidays; 425 hours.
Lead from the front Texas Nodal 1 High-Level Overview of draft NPRR implementing PUCT Rule Posting Requirements January 8,
1 Nodal Stabilization Market Call December 27, 2010.
1/07/2014 QMWG – RUC and AS update QMWG – ERCOT Update ERCOT Market Analysis.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Verifiable Costs for Nodal WMS Meeting.
PDCWG Report to ROS January 13, 2011 Sydney Niemeyer.
© ERCOT and 2004 Fleet Deployment and Settlements WMS Meeting August 19, 2004 Ino Gonzalez ERCOT Settlements
December 2010 Wholesale Market Subcommittee Report to Technical Advisory Committee.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Verifiable Costs Process Settlement and Data Aggregation Working.
NPRR 649 Board Appeal Koch Ag & Energy Solutions February 9,
OOMC and Local RPRS Settlement Alignment January 2007 WMS Meeting Ino Gonzalez ERCOT Settlements.
NPRR 520 Resmi Surendran ERCOT. Current CCT Process Annual CCT (ACCT) is run every year to feed the results to Monthly CCT (MCCT) MCCT is run every month.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Reliability Unit Commitment (RUC) Settlements Business Requirements.
July 15, 2011 Reliability Deployments Task Force Meeting ERCOT Studies and Proposal on Reliability Energy Pricing John Dumas Director Wholesale Market.
Lead from the front Texas Nodal 1 Texas Nodal Market Management System Update on TPTF Comments on MMS Clarification Notes May 21,
Overview of FIP Issues in the RUC, Verifiable Cost, and other Nodal Market Processes November 12, 2008 VCWG Meeting.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Real Time Voltage Support Settlements Business Requirements.
1 February, 2012 QMWG S&B Protocol Clarifications QSE-Requested Decommitment of a DAM Commitment ERCOT Mandy Bauld.
IMM alternate framework for Look-Ahead SCED November 21, 2011.
Lead from the front Texas Nodal 1 Texas Nodal Energy & Market Management System EMS/MMS Projects Requirement Documents November.
WRUC – Long Lead Time Commitments QSE Manager’s Working Group ERCOT Operations March 23, 2016.
Use of ONTEST Resource Status over Telemetry: – ERCOT protocol permits the use of telemetered Resource Status code “ONTEST” during periods of start-up.
ERCOT Market Education Market Role in Emergency Operations OTS 2016.
Exceptional Fuel Costs in LMP
Current FRRS Language & Explanation of Posted Data
General Overview Of Resource Costs
RTDF Overview of Data Analysis & Status of “Consesus Items”
Congestion Management and Ramp Rate for Delivering Ancillary Services
Presentation transcript:

Quick Start Resource – Payment for Start-Up at less than LSL Current NPRR language: ( 8) If a QSGR comes On-Line as a result of a Base Point less than its COP LSL, the QSE representing the QSGR may request a manual override from the ERCOT operator to set the LDL to a level greater than or equal to the COP LSL; the energy shall be settled pursuant to Section , Payment for Emergency Power Increase Directed by ERCOT. The first x consecutive Settlement Intervals after the manual override shall be settled pursuant to Section The value of x shall initially be set at two and shall be reviewed at least annually by TAC. The value of x shall be provided via Market Notice within three Business Days after a TAC approval of a change in value and the new value shall be effective on the first day of the next month. Following a SCED QSGR deployment, the QSGR is expected to follow the SCED Base Points.

Quick Start Resource – Payment for Start-Up at less than LSL 15 min intervalSCED y1SCED y2SCED y3SCED y4 EMREAMT (-1 * EMREPR * EMRE)-$1, EMRE (Max (0,(min(AEBP, RTMG) - BP 1 * 1/4) EMREPR (Max(0, EBPWAPR -RTSPP)$ EBPWAPR (weighted average price)$ TLMP (time of SCED interval in seconds) AEBP (sum(BP * TLMP/3600)) RTSPP$30.36 RTMG11.87 EBPPR output on EOC)$0.00$119.51$ (1)Previous Base Point = zero EOC QTY11 MW PR1$ QTY275 MW PR2$ NOTE: Example of curve is comparable to what was seen in Mkt Trials. To minimize getting dispatched below physical LSL, QSEs will have to submit their EOC as a flat curve between 0MW & Physical LSL MW. Even if they do that, they might get dispatched below the physical LSL if they are marginal and we don’t need up to their physical LSL to meet the load.

Quick Start Resource – Suggested DRAFT Settlement Language for STARTUP at less than LSL 6.6.9Emergency Operations Settlement (3) In accordance with paragraph (8) of Section Quick Start Generation resources, QSE’s that receive a manual override from the ERCOT operator may be considered for additional compensation utilizing the formula as stated in Section , Payment for Emergency Power Increase Directed by ERCOT. If the Resource’s Settlement Point Price at the Resource Node is lower than the QSGR’s Energy Offer Curve price at the aggregated base point during the 15 minute settlement interval, ERCOT shall pay the QSE additional compensation for the amount of energy from the offline zero base point to the aggregated output level. For the purpose of this settlement, and limited to the first x Settlement Intervals inclusive of the manual override, SCED Base Points will be used in place of the Emergency Base Point.

Quick Start Resource – Payment for HOLD Current NPRR language: (9) If the QSGR’s SCED Base Point equals the QSGR’s physical LSL telemetry and the QSE desires to disconnect the QSGR from the ERCOT Grid, the QSE must obtain the approval of the ERCOT Operator before it removes the QSGR from the ERCOT System. After completing the normal shutdown process, the QSE may place the QSGR in an OFF Resource Status or restore the QSGR to the conditions described in this Section (Resource Status = ON; Output Breaker Status = OPEN; LSL = 0). [WMS Comment: If ERCOT desires the QSGR to remain On-Line, the QSGR will be able to recover its energy costs.]

Quick Start Resource – Payment for HOLD pricing options Option A: Average Heat Rate (AHR) Holding is not an incremental change so the Incremental Heat Rate values do not seem appropriate. Holding can occur anywhere along the EOC for several settlement intervals, so average heat rate seems more appropriate. Average Heat Rate times Fuel price, or the average fuel cost, allows the Resource to recover the cost of fuel. Requires Resource to submit Heat Rate Coefficients to ERCOT. Typical AHR for QS Units = 8-12 MMBtu/MWh Option B: Average Incremental Energy Cost (AIEC) Based on EOC prices and may include more than actual cost of fuel; however, capped at the Energy Offer Curve Caps for the specific technology type. This may cap the EOC at a point that does not allow the Resource to recover its fuel cost or the cap may be higher, allowing the Resource to recover more than its fuel cost. Does not require Resource to submit Heat Rate Coefficients to ERCOT

Quick Start Resource – Payment for HOLD 15 min intervalAIECAVG EMREAMT (-1 * EMREPR * EMRE)-$ $ EMRE (Max (0,(min(AEBP, RTMG) - BP 1 * 1/4)13.75 EMREPR (Max(0, EBPWAPR -RTSPP)$29.64$9.64 EBPWAPR (Option A or B)$60.00$40.00 AEBP (HELD 55 MW BP/ 4)13.75 RTSPP$30.36 RTMG (55 MW/4)13.75 EMBPPR (HR * FIP)$60.00$40.00 AIEC 2 HR (MMBTU)15 AVG HR (MMBTU)10 FIP$4.00 (1) Previous Base Point = zero (2) Simple Cycle < 90 type Heat Rate per Protocol

Quick Start Resource – Suggested DRAFT Settlement Language for HOLD 6.6.9Emergency Operations Settlement (4)In accordance with paragraph (9) of Section Quick Start Generation resources, QSE’s that receive a manual override from the ERCOT operator may be considered for additional compensation utilizing the formula as stated in Section , Payment for Emergency Power Increase Directed by ERCOT. If the Resource’s Settlement Point Price at the Resource Node is lower than the QSGR’s average heat rate ( Or could be AIEC price as determined by the Market) multiplied times the fuel index price (FIP) at the held base point during the 15 minute settlement interval, ERCOT shall pay the QSE additional compensation for the amount of energy from a zero base point to the held output level. For the purpose of this settlement, and limited to the first x Settlement Intervals inclusive of the manual override, SCED Base Points will be used in place of the Emergency Base Point.

ERCOT’s Take-Away… Treatment for any resource that is held via a manual override: “Previous BP” = 0 Applies for all intervals of the hold Existing Emergency settlement language has flaws for handling “holds” in that it assumes that the current RTSPP was economical for the dispatch up to the previous BP If BP is = override value, it triggers settlements to evaluate for compensation through the emergency energy charge type Modification to the calculation of the emergency energy price (applies in all circumstances): “Cap it” using the RTM mitigated offer cap curve (sent to settlements from Operations) Pay the minimum of the difference in the mitigated price and RTSPP, vs. the difference between the EOC price and the RTSPP For resources on OS, will use the difference between the mitigated price and RTSPP