1 Material Management Class Note # 3-B ~ Multiple product EPQ analysis ~ Prof. Yuan-Shyi Peter Chiu Feb. 2012.

Slides:



Advertisements
Similar presentations
Module C6 Other EOQ Type Models.
Advertisements

1 Prof. Yuan-Shyi Peter Chiu Feb Material Management Class Note # 1-A MRP – Capacity Constraints.
“Make to order or Make to Stock Model: and Application” S.Rajagopalan By: ÖNCÜ HAZIR.
Types of scheduling problems Project scheduling - Chapter 4 Job shop - Chapter 5 (shifting bottle neck) Flow shop - Chapter 5 Flexible assembly - Chapter.
Operations Management Dr. Ron Tibben-Lembke
6 | 1 Copyright © Cengage Learning. All rights reserved. Independent Demand Inventory Materials Management OPS 370.
Inventory Management for Independent Demand Chapter 12, Part 2.
Murat Kaya, Sabancı Üniversitesi 1 MS 401 Production and Service Systems Operations Spring Inventory Control – IV Multiperiod Probabilistic Demand:
Inventory Control IME 451, Lecture 3.
Chapter 13 Inventory Systems for Independent Demand
Chapter 11, Part A Inventory Models: Deterministic Demand
Chapter 9 Inventory Management.
1 By: Prof. Y. Peter Chiu By: Prof. Y. Peter Chiu 9 / 1 / / 1 / 2010 Advanced P.O.M. Chap. 3 Aggregate Planning.
ISE 216 – Production Systems Analysis
Operations Management
1 Material Management Class Note # 3-A ( In review ) ~ Inventory control, analysis, and management ~ Prof. Yuan-Shyi Peter Chiu Feb
Lecture 5 Project Management Chapter 17.
Operations Management Inventory Management Chapter 12 - Part 2
1 ANALYSIS OF INVENTORY MODEL Notes 1 of 2 By: Prof. Y.P. Chiu 2011 / 09 / 01.
Dynamic lot sizing and tool management in automated manufacturing systems M. Selim Aktürk, Siraceddin Önen presented by Zümbül Bulut.
1 Prof. Yuan-Shyi Peter Chiu Feb Material Management Class Note # 1-A MRP – Capacity Constraints.
1 By: Prof. Y. Peter Chiu Materials Management Inventory Management ~ HOMEWORK SOLUTION ~ Xtra 4.29, 4.30, 4.45.
1 Analysis of Inventory Models Special topic # 1 ~ Multiple products EPQ analysis ~
Chapter 5 Inventory Control Subject to Uncertain Demand
1 Wagner – Whitin Algorithm Prof. Yuan-Shyi Peter Chiu Feb Material Management Class Note #1-B.
Lot sizing and scheduling
Chapter 12 – Independent Demand Inventory Management
Inventory Management for Independent Demand
Chapter 12: Inventory Control Models
Inventory control models EOQ Model. Learning objective After this class the students should be able to: calculate the order quantity that minimize the.
CHAPTER 19 Scheduling Operations Management, Eighth Edition, by William J. Stevenson Copyright © 2005 by The McGraw-Hill Companies, Inc. All rights reserved.
Inventory Decisions with Certain Factors Chapter 15
Ise 216 Chapter 4 question hour
Scheduling.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 16 Scheduling.
Inventory Control Subject to Deterministic Demand Operations Analysis and Improvement 2015 Spring Dr. Tai-Yue Wang Industrial and Information Management.
BA 301 Operations Management Spring 2003 Inventory Management Chapter 12 Continued.
Inventory. The amount of material, a company has in stock at a specific time is known as inventory or in terms of money it can be defined as the total.
Independent Demand Inventory Management
Production and Service Systems Operations
15-1Scheduling William J. Stevenson Operations Management 8 th edition.
13-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
5-1 ISE 315 – Production Planning, Design and Control Chapter 5 – Inventory Control Subject to Unknown Demand McGraw-Hill/Irwin Copyright © 2005 by The.
15-1Scheduling William J. Stevenson Operations Management 8 th edition.
3-1 Chapter 3 Aggregate Planning McGraw-Hill/Irwin Copyright © 2005 by The McGraw-Hill Companies, Inc. All rights reserved.
Economic Order Quantity The economic order quantity (EOQ) is the fixed order quantity (Q) that minimizes the total annual costs of placing orders and holding.
Inventory Management MD707 Operations Management Professor Joy Field.
Chapter 4 Inventory Control Subject to Known Demand
1 Inventory Theory – Part II Quantity Discounts Constrained Inventory Management Single Facility EOQ A quantity of commodity held for some time to satisfy.
Scheduling Process and Production Management.
1 1 Slide © 2011 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole.
CHAPTER 5 Inventory Control Subject to Uncertain Demand McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved.
1 Chapter 6 –Inventory Management Policies Operations Management by R. Dan Reid & Nada R. Sanders 4th Edition © Wiley 2010.
The Economic Production Quantity (EPQ) Model
MBA 8452 Systems and Operations Management
Operational Research & ManagementOperations Scheduling Economic Lot Scheduling 1.Summary Machine Scheduling 2.ELSP (one item, multiple items) 3.Arbitrary.
Project Chiron SMU TEAM ALCON
Inventory Management for Independent Demand Chapter 12.
1 Resource-Constrained Multiple Product System & Stochastic Inventory Model Prof. Yuan-Shyi Peter Chiu Feb Material Management Class Note #4.
Prof. Yuan-Shyi Peter Chiu
Lecture 23 Order Quantities
Chapter 14 Aggregate Planning.
Chapter 13 - Inventory Management
Inventory Control Subject to Deterministic Demand
Managing Short-Term Assets
Project Chiron SMU TEAM ALCON
Chap 11 Learning Objectives
8 Job Sequencing & Operations Scheduling CHAPTER Arranged by
Project Chiron SMU TEAM ALCON
PRODUCTION PLANNING AND PROCESS PLANNING
Presentation transcript:

1 Material Management Class Note # 3-B ~ Multiple product EPQ analysis ~ Prof. Yuan-Shyi Peter Chiu Feb. 2012

2 §. Inventory Management for Finite Production Rate Inventory Levels for Finite Production Rate Model Slope=P- λ Slope= - λ

3 P : production rate (per unit time) λ: demand rate (per unit time) P > λ

4 ………... [Eq.1] §. Finite Production Rate Model

5 ~ EPQ (Finite Production Rate ) Models for Production Planning ~ ◆ Producing n products on a single machine (or line) ◆ Goals : (1) To determine the optimal procedure for producing n products on the machine to minimize the cost of holding & setups. (2) To guarantee that no stock-outs occur during the production cycle. Demand rate for product j Production rate for product j Holding cost per unit per unit time for product j Cost of setting up the production facility to produce product j ‧

6 ◆ Assumption (required) ◇ To ensure that the facility has sufficient capacity to satisfy the demand for all products. ~ Multiple items production planning ~ ………... [Eq.2]

7 ◆ Rotation cycle policy assumption : means that in each cycle there is exactly one setup for each product, and products are produced in the same sequence in each production cycle. ◇ Recall “the finite production rate “ solution where H T ~ Multiple items production planning ~

8 ◆ Let T be the cycle time ( new, for the rotation cycle policy) During time T, we assume that exactly one lot of each product is produced. ◇ In order that the lot for product j be large enough to meet the demand occurring during time T, it follows that the lot size should be ◇ The average annual cost ( of setup & holding costs only ) (e.g. if T=0.5 year, =12,000 then =6,000) ………... [Eq.3]

9 ◇ The average annual cost for all products ◇ The avg. annual cost for n products in terms of the cycle time T ◇ To find T, minimize G(T) ; (check G”(T)>0 for minimal) ………... [Eq.4]

10 where ………... [Eq.5]

11 ◆ If setup times are a factor, we must check that if there is enough time each cycle to account for both setup times and production time of the n products. Let be the setup time for product j T1 year 0 Idle time fits into idle time ~ Multiple items production planning ~ ………... [Eq.6]

12 then [Eq.6] become (or )  ◆ The optimal solution is to choose the cycle time T ( Let ) T = max { T*, } if considering   ………... [Eq.7]

13 Example 4.7 Bali produces several styles of men’s and women’s shoes at a single facility near Bergamo, Italy. The leather for both the uppers and the soles of the shoes is cut on a single machine, This Bergamo plant is responsible for seven styles and several colors in each style. (The colors are not considered different products for our purposes, because no setup is required when switching colors.) Bali would like to schedule cutting for the shoes using a rotation policy that meets all demand and minimizes setup and holding costs. Setup costs are proportional to setup times. The firm estimates that setup costs amount to an average of $110 per hour, based on the cost of worker time and the cost of forced machine idle time during setups. Holding costs are based on a 22% annual interest charge. The relevant data for this problem appear in Table 4-1.

14 ◆ Example 4.7 # Style Production Rate Setup Time (hr) Variable Cost Assuming $110 per hr Assuming ί =22% 1WP4,52035, ,759 2WL6,60062, ,792 3WB2,34041, ,249 4WS2,60071, ,906 5MW8,80046, ,752 6ML6,20071, ,844 7MO5,20056, ,188 ∵ $110 * (Setup Time) Holding Cost = ί*c =(22%)*c Σ= [Eq.2]

15 ◆ Assuming 250 working days a year ( year ) * 250 = 38.2 days #style 1WP WL WB WS MW ML MO ◆ Example 4.7

Original – by EPQ single item  Not feasible ◆ Example 4.7 in SPT ?

17 #style 1WP WL WB WS MW ML MO Σ=26.1 Σ=26.5 ◆ 1 year = 250 days ◆ Example 4.7 Original by Rotation cycle policy

Original ◆ Example 4.7 in SPT

19 ◆ Example 4.7 by Rotation cycle policy T* = 38.2 in SPT # 1 # 2 # 3 # 4 # 5 # 6 # 7

20 ◆ The optimal solution is to choose the cycle time T ( Let ) T = max { T*, } if considering   ………... [Eq.7] If including setup time s j : T = max { , } = Setup Time (hr)

21 Class Note# 3b Class Note # 3b §. I.4.9: Home Work Problems Chapter 4 : ( # 29, 30 ) pp (a) using Rotation Cycle (a) using Rotation Cycle ( # 45 ) pp.227 Preparation Time : 15 ~ 20 minutes Discussion : 10 ~ 15 minutes ■

22 §. I.eg.4.7.1: Class Exercise “IF there are only 2 products” Holding costs are based on a 22% annual interest charge Preparation Time : 15 ~ 20 minutes Discussion : 10 ~ 15 minutes Setup Time #2WL6,60062, *4* WS2,60071,

23 Setup Time #2WL6,60062, $ *4* WS2,60071, year = 250 days ◆ Example “IF there are only 2 products” Original by Rotation cycle policy #2WL = , , *4* WS = , * Data being modified

24 By rotation cycle policy T* Costs - when using T* = ( ) + ( ) = (4529) + (3129) = $7,658 ◆ Example “IF there are only 2 products”

25 #2WL = , , *4* WS = , To Think about - when producing 2 products ◆ To Think about - when producing 2 products Item “WL” has T 1 = 31.9 days Item “WS” has T 2 = 70.6 days Why using R-C-P ? To allow producing 1 run per item per period ?

26 Class Note# 3b Class Note # 3b §. I.eg A: Class Exercise From eg Preparation Time : 15 ~ 20 minutes Discussion : 10 ~ 15 minutes Setup Time #2WL6,60062, *4* WS2,60071, If we producing 2 runs of item “WL” and 1 run of item “WS” in a period of 70.6 days (or years) (a) What will the annual costs be? (b) Draw a chart for production schedule.

27 A Solution to eg A : When producing 2 runs of item “WL” and 1 run of item “WS” in a period of 70.6 days (or years)(a) ∴ T 1 = / 2 = years = 35.3 days ∴ Q 1 = (λ 1 ) ( T 1 ) = (6600) (0.1412) ≒ 932 ∴ T 11 = Q 1 / P 1 = 932 / 62,600 ≒ years ≒ 3.72 days [ up-time] = ( ) + ( ) = $4,333 = $2,805

28 = $4,333 + $2,805 = $7,138 A Solution to eg A : Comparing to R-C-P: $7658 There are ($ $7138) / $7658 = 6.8 % cost saved.

T* = 70.6 days #WL-1 # WS A Solution to eg A :(b) 6.31 #WL

30 Class Note# 3b Class Note # 3b §. I.eg B: Class Exercise From eg Preparation Time : 15 ~ 20 minutes Discussion : 10 ~ 15 minutes Setup Time #2WL6,60062, *4* WS2,60071, If we producing 2 runs of item “WL” and 1 run of item “WS” in a period of 63.8 days (or 2* = years) (a) What will the annual costs be? (b) Draw a chart for production schedule. ◆ G-s-32 G-s-32

31 Class Note# 3b Class Note # 3b §. I.eg C: Class Exercise From eg Setup Time #2WL6,60062, *4* WS2,60071, – i.e. the optimal length for period If we producing 2 runs of item “WL” and 1 run of item “WS” in a period of 66.4 days (or years) – i.e. the optimal length for period What will the annual costs be? ◆ G-s-35