14 November 2006 UNFCCC Side Event, COP/MOP, Nairobi Development and Implementation of a JI Track 2 project Manfred Stockmayer Director Camco International.

Slides:



Advertisements
Similar presentations
GIS links to the voluntary market: CO2 mitigation potential of agriculture manure management Csaba Fogarassy – Akos Lukacs – Bence Huba Szent Istvan University.
Advertisements

Perspective of JI in Hungary József Feiler Climate Change Unit.
Development and Prospects for JI UNFCCC Side Event November 30, 2005 Hiroshi YAMAGATA Ministry of Economy, Trade and Industry JAPAN.
James Grabert Manager, Joint Implementation, UNFCCC secretariat Joint Implementation Overview & Status Kyoto Protocol and Carbon Market.
Click to edit Master title style Climate Change and the Carbon Market October 2010 Ciska Terblanche TAPPSA 2010 Conference Durban, South Africa TAPPSA.
Renewable Energy and Carbon Credits Heath Norrick Manager of Renewable Energy Hoosier Energy REC, Inc.
1 Joint Implementation: A Credit Blueprint for Europe? Dr. Moritz von Unger Roundtable: Domestic Offsets under Article 24a EU ETS Brussels, 1 March 2010.
Joint Implementation & Gas Flaring Reduction Projects Alexandrina Platonova-Oquab Carbon Finance Unit, World Bank.
1 Georg B ø rsting Chair of the JI Supervisory Committee Joint Implementation 1-3 April 2008 Bangkok, Thailand AWG-KP 5 In-session workshop on means to.
Green Investment Scheme (GIS) in the Czech Republic Petr Jan Kalaš Moscow Carbon Market Forum 2008 Ministry of Environment Vršovická Praha 10.
The Hungarian Green Investment Scheme Gyorgy Lazi THE WORLD BANK Energy and Infrastructure Unit, Europe and Central Asia Region.
GIS in Hungary Context and architecture József Feiler.
Domestic Offsets - first experiences POLAND Brussels, 1 March 2010 Roundtable: Domestic Offsets under Article 24 (a) Izabela Zborowska, KASHUE-KOBiZE.
Green investment scheme and climate change mitigation policy in Ukraine Stavchuk Iryna Climate change program coordinator National ecological centre of.
UNDP, Bangkok, 1 April 2008 AWG on Further Commitments In-session workshop on means to reach emission reduction targets CDM Experiences and Lessons.
Nairobi Framework Enhancing Regional Distribution of CDM projects, especially in Africa UNFCCC/CDM media training workshop - Tuesday 6 December John Christensen.
Энергетический Углеродный Фонд JI Projects in the Russian Power Industry Mikhail Rogankov Chief Executive Officer acting Energy Carbon Fund Tel.: +7 (095)
EcoSecurities Group Ltd All Rights Reserved EcoSecurities is the leading global GHG advisor (selected by Readers of Environmental Finance.
The Learning Process and Technological Change through International Collaboration: Evidence from China’s CDM Wind Projects Tian Tang David Popp Maxwell.
Introduction to Climate Change: - global warming - basis steps in a clean development project - connection of CDM with European Trading Scheme Wim Maaskant.
UNIDO Vietnam Support for CDM projects in the Industrial sector: Pilot Project in Co-operation with the Austrian Industry Training Sessions on the Kyoto.
State, Trends and Barriers to Carbon Finance in RBEC Marina Olshanskaya Regional Energy/Kyoto Protocol Specialist RBEC Energy and Environment Practice.
Carbon markets An international tool for cost-effective GHG mitigation.
GERMAN SUPPORT for CDM CAPACITY BUILDING Marrakesh, Morocco 22. April 2004 Holger Liptow Climate Protection Programme (CaPP) CaPP.
Experiences as a ER buyer and a general outlook Olle Björk Swedish Ministry of Sustainable Development Washington
JOINT IMPLEMENTATION MECHANISM IN BULGARIA J I MINISTRY OF ENVIRONMENT AND WATER 26 May 2004 Daniela Stoycheva – National Focal Point on CC, BULGARIA.
Status of Joint Implementation and Green Investment Scheme Vlad Trusca Ministry of Environment and Sustainable Development Romania - Annual meeting of.
Dr. I.Purica Ministry of Environment Romania Kyoto Protocol and its implementation in Romania.
Relationship between the EU ETS and the Kyoto Protocol Flexible Mechanisms, from the Perspective of Bioenergy and C Sequestration Relationship between.
TÜV SÜD Industrie Service GmbH Determinations with regard to a JI track 2 Nairobi, 14 th November 2006 JI-SC side event at COP/MOP Thomas Kleiser TÜV SÜD.
Overview and Introduction to Technology Transfer Report Final TETRIS Workshop Brussels Dirk Forrister Natsource Europe Ltd 30 November 2006 Some new thinking.
Overview of Carbon Markets Voluntary & Compliance Markets: Existing Carbon Reduction Units Vladimir Litvak RBEC Energy and Environment Practice Leader.
Pilot Project on the Use of Flexible Instruments for Climate Policy in Baden-Wuerttemberg: A Manual to Facilitate Companies Participation Fraunhofer Institute.
© 2006 UNDP. All Rights Reserved Worldwide. Proprietary and Confidential. Not For Distribution Without Prior Written Permission. State and Trends of the.
Carbon credits - origination to commercialisation© 2006 EcoSecurities Group plc CleanTech and Carbon in the Pacific Northwest Seattle, WA November 8, 2007.
EU ETS & European Energy Market Dr Bill Kyte OBE Advisor, Sustainable Development, E.ON AG Chairman, UK Emissions Trading Group Ltd Chairman, Eurelectric.
Green Investment Scheme in Bulgaria Christo Christov, Energy Institute, Bulgaria Workshop Facilitation Green Investment Scheme: first lessons learnt and.
Latest on Bioenergy in the EU Emissions Trading System and in the CDM Latest on Bioenergy in the EU Emissions Trading System and in the CDM B. Schlamadinger.
The Danish JI Program UNFCCC Workshop on the Implementation of Article 6 projects under the Kyoto Protocol Moscow, May 2004 by Ulla Blatt Bendtsen,
3 – Clean Development Mechanism Introduction to Climate Change Wim Maaskant BGP Engineers – The Netherlands
Swedish Energy Policy. Relative Energy Supply coal hydro wood oil nuclear new RES.
Energy Efficiency in District Heating and Joint Implementation Mark van Wees CAP SD Energy and Climate Consultants Moscow, August 2006.
Green Investment Schemes: Maximizing their benefits for climate and society Diana Urge-Vorsatz 24th. April.2008.
GIS Development in Romania Vlad Trusca Head of Climate Change Unit Ministry of Environment and Sustainable Development “REC Workshop “Facilitating GIS:
Joint Implementation in the Czech Republic - building on our own experience Climate Change Department Tomas Chmelik Pavel Zamyslicky Climate Change Department.
Joint Implementation by the Netherlands Maurits Henkemans Ministry of Economic Affairs Netherlands Moscow.
1 Technology Transfer and Investment Risk in International Emissions Trading FP6 – Priority 8 - Policy-oriented Research Funded by: European Commission,
Meeting the challenge is not a choice between growth and climate change… a climate smart world is within reach if we act now, act together and act differently…
Markets & Mechanisms Developments inside and outside the UNFCCC negotiations. Building and Urban Methodologies Workshop UNFCCC, Bonn, March 2014.
Standardized national/sectoral baselines UNFCCC Technical Workshop on Joint Implementation Bonn, 16 October 2007 Manfred Stockmayer Managing Director Camco.
Portfolio of Biomass Projects in the Czech Republic David Viduna BTG Central Europe s.r.o. San Salvador, March 28, 2003.
New Government Policy on Energy Efficiency By Subodh Kumar Scientist Central Road Research Institute New Delhi ,
Introduction of Regional Environmental Center for Central and Eastern Europe November, 2007 Zsuzsanna Ivanyi Head of Climate Change Department.
1 Jorund Buen Partner/Director, Point Carbon UNFCCC Technical Workshop on Joint Implementation 10 March 2006 Early mover JI projects.
Seite Hier steht ein thematisches Foto Demand side perspective on JI UNFCCC Side event on Joint Implementation Gertraud Wollansky Federal Ministry.
Environmental Industries Sector Unit CDM Opportunities in South Korea Greg Dunne, Director, ICECAP Ltd. Seoul, 25 th September 2006 EISU Seminar Mission.
EBRD and Emissions Trading Financing GHG emission reduction projects 29 September 2009, Sofia Friso de Jong Carbon Finance Analyst Energy Efficiency and.
UNFCCC JI workshop 14th February 2007 ENDESA´s Strategy regarding Joint Implementation David Corregidor Sanz Deputy Director of the Environment and Climate.
Francisco Arango UNFCCC secretariat JI section Joint Implementation State of Play UNFCCC Technical Workshop on.
Clean Development Mechanism in China Song Yanqin National Coordinator NDRC/UNDP/UNF/ NORAD/IMET Supported Building Capacity for CDM in China Feb 22, 2007.
Clean Technology (PB386) Click to edit Master title style Numfon Eaktasang, Ph.D.
September 29, 2009 Sagacarbon seminar, sofia.
Green Investment Schemes - Concepts, Ideas, Challenges
UNFCCC Technical Workshop on Joint Implementation
Implementation of the Kyoto protocol mechanisms in the Czech Republic
German Emissions Trading Authority (DEHSt)
UNFCCC JI Workshop, Bonn
Joint Implementation A Parties and Buyers Perspective
Baseline setting and monitoring under JI compared to the CDM approach
Carbon Finance at EBRD: IGOs’ perspectives
Presentation transcript:

14 November 2006 UNFCCC Side Event, COP/MOP, Nairobi Development and Implementation of a JI Track 2 project Manfred Stockmayer Director Camco International Ltd

1 Camco International  Leading developer of carbon assets in JI and CDM projects  Camco works with industrial companies and utilities  Camco helps to maximise the volume and to facilitate placement  Main markets: China Russia Africa Central and Eastern Europe (CEE)  Listed on the London Stock Exchange  Current portfolio of more than 100 million tons of CO2

2 JI in CEE: Lots of questions….. …. Which impacts does the EU Emissions Trading Scheme have? …. How will the issue of double counting be interpreted and be dealt with? …. What is the JI project potential in various sectors? …. How easy is it to develop the project documents and get them approved? …. How much time is left to develop JI projects? …. What is the view of buyers on ERUs?

3 The Linking Directive – a bit of background Links the project-based mechanisms (JI and CDM) to the EU Emissions Trading Scheme  National Allocation Plans shall determine the maximum percentage of CERs and ERUs to be used by installations  Application of criteria and guidelines from World Commission on Dams for hydro power projects  No CERs and ERUs from nuclear facilities and LULUCF activities  Avoidance of double counting (direct and indirect)

4 The Linking Directive – basis for headache Direct double counting No (serious) problems as emission reductions lead to financial benefits => projects will be implemented Indirect double counting Potential for projects in the following categories is reduced:  Renewables (wind, small hydro, biomass CHP)  CHP  Energy efficiency (electricity, district heating)

5 Challenges in developing baselines and monitoring plans  Based on CDM methodologies  Flexibility – take the best and leave the rest  Develop own approaches if no methodology existing  Need for well-experienced project developer/consultant

6 … and even more questions… …. How will countries react on potential limitations? …. Are Green Investment Schemes (GIS) the solution? …. How will the JISC further define the framework for JI? Limited timeline for many project categories Focus on project categories with no (minor) impact on EU ETS  Energy projects up to 20 MW  Methane  Biofuels

7 Thank You Manfred Stockmayer Director Camco International