1 New York State Reliability Council …….. Promoting Electric System Reliability in New York State Presentation to the MEUA Annual Meeting - 2000 September.

Slides:



Advertisements
Similar presentations
2004 NERC, NPCC & New England Compliance Programs John Norden Manager, Operations Training, Documentation & Compliance August 31, 2003 RC Meeting.
Advertisements

NERC Policies Introduction
Prepared by the North American Energy Standards Board 1 North American Energy Standards Board NAESB Overview Presented to: Data Privacy Task Force February.
2007 Goals. Introduction Western Electricity Coordinating Council (WECC) will be primarily defined throughout the 2007 year by Electric Reliability.
Document Categorization Steve Ashbaker Director of Operations Joint Guidance Committee WECC Leadership Annual Training Session Salt Lake City, UT May 6-7,
NERC Orientation Joint Guidance Committee WECC Leadership
Order 2000 and PJM: A Natural Match Craig Glazer Manager of Regulatory Affairs PJM Interconnection, LLC.
PRESENTATION ON MONDAY 7 TH AUGUST, 2006 BY SUDHIR VARMA FCA; CIA(USA) FOR THE INSTITUTE OF INTERNAL AUDITORS – INDIA, DELHI CHAPTER.
Auditing, Assurance and Governance in Local Government
WP4 – Task 4.4 LCA Activities
Key Reliability Standard Spot Check Frank Vick Compliance Team Lead.
COM Operating Personnel Communications Protocols
Chapter 43 An Act Relative to Improving Accountability and Oversight of Education Collaboratives Presentation to Board of Elementary and Secondary Education.
Standards Development: Update to IMO Regulatory Standing Committee May 14, 2003.
Date Texas RE Board Update to TAC November 5, 2009 Susan Vincent Director, Legal Affairs.
Purpose of the Standards
R OLES AND R ESPONSIBILITIES Your Role as Area President  Represent the area on the KEHA Board of Directors  Preside at all area meetings.
ELIGIBILITY PROCEDURES FOR SPECIAL EDUCATION SERVICES Chapter Seventeen.
1 The Effects of Integrating Wind Power on Transmission System Planning, Reliability, and Operations Phase 1 Preliminary Overall Reliability Assessment.
1 FRCC Compliance Organization and Entity Registration 2008 FRCC Compliance Workshop.
Procurement Engineering and Review Team (PERT) PEER REVIEW PROGRAM Patrick Marmo 2/7/2012 Independent Peer Review Program for Contractor’s Purchasing Systems.
Current Status Of The ERO Transition Activities To Comply With The 2005 EPAC ERCOT Board Meeting February 21, 2006 Sam Jones, COO.
Ontario Overview Dave Short Senior Regulatory Analyst, Regulatory Affairs IESO’s ERO Workshop – June 28, 2006.
3 Dec 2003Market Operations Standing Committee1 Market Rule and Change Management Consultation Process John MacKenzie / Darren Finkbeiner / Ella Kokotsis,
Integration of Variable Generation Task Force Preliminary Conclusions and Actions.
Update On The ERO Transition Activities To Comply With The 2005 EPAC ERCOT TAC Meeting March 9, 2006 Sam Jones, COO.
Procedures and Forms 2008 FRCC Compliance Workshop April 8-9, 2008.
Compliance Monitoring and Enforcement Audit Program Background Information.
Texas Regional Entity Update Sam Jones Interim CEO and President Board of Directors July 18, 2006.
NAESB MEASUREMENT AND VERIFICATION MODEL BUSINESS PRACTICE RETAIL ELECTRIC DEMAND RESPONSE NARUC update 9/14/09.
Project Definition of Bulk Electric System Presenter: Peter Heidrich – Drafting Team Chair Date: March 1, 2011.
May 16, 2007 Board of Directors Texas Regional Entity Division Update Sam R. Jones ERCOT President & CEO.
Actions Affecting ERCOT Resulting From The Northeast Blackout ERCOT Board Of Directors Meeting April 20, 2004 Sam Jones, COO.
Item 5d Texas RE 2011 Budget Assumptions April 19, Texas RE Preliminary Budget Assumptions Board of Directors and Advisory Committee April 19,
Project Real-time Monitoring and Analysis Capabilities Mark Olson, Senior Standards Developer Texas RE NSRS October 5, 2015.
NERC Reliability Standards - Development Process: Involvement & Needs Presentation to MOSC January 14, 2004 Khaqan Khan Independent Electricity Market.
The Electric Reliability Organization: Getting from here to there. Gerry Cauley Director, Standards ERO Project Manager ERO Slippery Slope NERC Today Uphill.
Integration of Variable Generation Task Force (IVGTF) Mark Lauby Manager, Reliability Assessments
DOE Integrated Safety Management (ISM) Conference Knoxville, TN August 24-27, 2009 Colette Broussard, DOE-HQ Office of Quality Assurance Policy.
Transmission Owners and Operators Forum NERC Stakeholders Meeting 8/1/06 Ad-Hoc T. O. O. Forum Group.
1 Session 5. Balancing Act: Reliability & Commercial Use.
Business Practices Subcommittee Update Executive Committee Meeting October 20, 2015.
Compliance Audit Subcommittee Reporting Work Plan Copenhagen, Denmark 6th of May 2010.
Congestion Management in a Market Environment David Nevius Senior Vice President North American Electric Reliability Council.
Introduction This presentation is intended as an introduction to the audit process for employees of entities being audited by MACD. Please refer to the.
Standards Review Subcommittee Update August 17, 2010.
FERC Staff’s Report on Demand Response and Advanced Metering.
Outage Planning Subcommittee Mark Wilson. Outage Planning Subcommittee Created to address Market Participant concerns with existing rules and procedures.
SAR 001 DT Presentation Texas RE Presentation to SAR-001 Drafting Team Farzaneh Tafreshi Manager, Reliability Standards Texas Regional Entity.
Business Practices Subcommittee Update Executive Committee Meeting August 18, 2015.
1 NPCC – A-2 Dr. Mayer Sasson Transmission Planning Consolidated Edison of New York June 1, 2006 Presented to the NYSRC-RRS.
ANNUAL PRODUCT REVIEW Patchara Kootiratrakarn Independent consultant.
Winning with KEHA Roles and Responsibilities
Interchange Scheduling & Accounting Subcommittee
Implementation Strategy July 2002
MAC Board Effectiveness Survey
MIC Committee Discussion
GMD Data Request NERC Rules of Procedure Section 1600
Planning Coordinator - Gap Resolution Team (GRT)
Integration of Variable Generation Task Force (IVGTF)
The Electric Reliability Organization: Getting from here to there.
Coordinate Operations Standard
Project Definition of Bulk Electric System
Integration of Variable Generation Task Force (IVGTF)
Reliability Assurance Initiative (RAI) 101
MAC Board Effectiveness Survey
Proposal to Revise Appendix D of NYSRC Policy 5
MIC Committee Discussion
Standards Development Process
Standards Review Subcommittee Update
Presentation transcript:

1 New York State Reliability Council …….. Promoting Electric System Reliability in New York State Presentation to the MEUA Annual Meeting September 19-21, 2000 Richard J. Bolbrock, P.E. Chairman - New York State Reliability Council

2 NYSRC Mission To Promote and Preserve the Reliability of Electric Service on the Bulk Power System in New York State

3 General Responsibilities Establish and maintain Reliability Rules for use by the NYISO and all entities engaging in electric power transactions on the Bulk Power System Along with NPCC and the ISO, monitor compliance with the Reliability Rules Establish State-Wide Installed Capacity Requirements consistent with NPCC Standards

4 NYSRC Executive Committee Reliability Rules Subcommittee Reliability Compliance Monitoring Subcommittee ICAP Working Group NYSRC Organizational Structure

5 7 - Affiliated Members from the Transmission Providers 1 - Member from the Electric Suppliers 1 - Member from the Municipalities 1 - Member from the Large Customers 3 - Non-Affiliated Members 3 - Observers ISO PSC NPCC NYSRC Membership

6 NYSRC Responsibility Topics NYSRC Rule Development NYSRC Compliance Monitoring NYCA ICAP Requirements

7 NYSRC Rule Development 1. Elements of NYSRC Rules 2. Process for Updating NYSRC Rules 3. Rule Development Program for 2000

8 Elements of the NYSRC Rules NERC Standards NPCC Standards Local Reliability Rules Other more restrictive or stringent criteria than NPCC Standards, recognizing special NYS system characteristics or reliability needs

Procedure for Reviewing, Developing, Modifying, and Disseminating NYSRC Reliability Rules NYSRC Rule Change Request EC Assigns to RRS RRS Recommendation to Accept or Reject Rule Change Notification EC Action Notify MPs Implement Rule Dispute Resolution Post Notify FERC & PSC Final New or Modified Rule To RRS for Revision RRS Final Draft Rule Post RRS 1st Draft Rule ISO Reviews Rule (Agrees with Rule) (Disagrees with Rule) (Return) (Reject Rule Change) (Accept Rule Change) RRS Reviews Comments (Approve) (45 Day Comment Period) Post Request ISOMPs EC Action

10 Rule Development Program for 2000 Preparing new NYSRC Rules Merging NERC/NPCC Standards into NYSRC Rules

11 NYSRC Compliance Monitoring 1. NYSRC Compliance Review Process NY Reliability Compliance Program [2000 NYRCP]

12 Compliance Review Process Develop reporting procedures Collect data, documentation, and assessments to demonstrate compliance Evaluate compliance Report conclusions regarding full compliance or levels of non-compliance

13 Types of NYSRC Rule Assessments

14 Compliance Review - Type A NYSRC Rule: NPCC Criteria Responsible Reporting Entity: ISO Compliance Monitoring Entity: NPCC Oversight Review Entity: NYSRC Examples: Transmission System Performance ( ) NERC/NPCC Pilot Program Standards ISO Prepares Compliance Report NYSRC Provides Oversight Review and Comments to ISO NPCC Monitors ISO Compliance 1 2 3

15 Compliance Review - Type B NYSRC Rule: NPCC Criteria Responsible Reporting Entity: MPs Compliance Monitoring Entity: ISO Oversight Review Entity: NYSRC/NPCC Examples: NERC/NPCC Pilot Program Standards MPs Prepares Compliance Report NYSRC Provides Oversight Review and Comments to ISO NPCC Provides Oversight Review ISO Monitors MP Compliance

16 Compliance Review - Type C NYSRC Rule: Not Covered by NPCC/NERC Criteria Responsible Reporting Entity: ISO Compliance Monitoring Entity: NYSRC Examples: Locational ICAP Responsibility (3.1.2) Restoration Procedures (4.1.6) DMNC Testing Procedure ( ) ISO Prepares Compliance Report NYSRC Monitors ISO Compliance 1 2

17 Compliance Review - Type D NYSRC Rule: Not Covered by NPCC/NERC Criteria Responsible Reporting Entity: MPs Compliance Monitoring Entity: ISO Oversight Review Entity: NYSRC Rule Examples: Local Rules LSE Capacity Responsibility (3.1.4) DMNC Testing - Test Results ( ) MPs Prepare Compliance Report ISO Monitors MP Compliance NYSRC Provides Oversight Review 1 2 3

18 Summary 2000 NY Reliability Compliance Program (NYRCP) Assessments

NYRCP Summary

NYRCP Objectives To Monitor Compliance with NYSRC Rules To Test Effectiveness of the Compliance Review Process and Procedures To Assess Communication between NYSRC, NYISO, Market Participants, and NPCC Concerning Reliability Assurance

21 NYCA IRM Requirements NYSRC Study Process Study Assumptions Multi-Area Reliability Model NYCA Results IRM - 18% NYISO Study LSE IRM Requirements Locational Capacity Requirements ISONE Ontario PJM H-Q 11 NYCA Zones

22 New York Model NYISO/NYSRC Relationship NY State Reliability Council (NYSRC) Independent System Operator (NYISO) Dispute Resolution Reliability Rules / Criteria Compliance Data

23 NYSRC Relationship to NYISO NYSRC and the NYISO will function as two separate and distinct entities but work cooperatively NYSRC defines the reliability rules for operating the system NYISO responsible for short term reliability of NYS power system NYSRC and NYISO will both participate at NPCC and NERC/NAERO NYSRC assesses and monitors NYISO's compliance with reliability rules

24 NYSRC Relationship to NYISO Cont’d NYISO provides NYSRC with data, reports, and assistance NYISO provides reports to NYSRC describing performance of NYS Power System NYSRC reviews and approves triennial reviews and other reliability reports prepared by the NYISO for submittal to NPCC/NERC

25 Functional Relationships Between NYSRC & NYISO

26 Functional Relationships Between NYSRC & NYISO

27 Functional Relationships Between NYSRC & NYISO