Capacity Planning. How much long-range capacity is needed When more capacity is needed Where facilities should be located (location) How facilities should.
Advertisements

PRODUCTION AND OPERATIONS MANAGEMENT
Capacity Planning For Products and Services
4. Capacity Planning. Basic Organizational Structures in a Production Plant: Functional Line Continuous Process Group Organization.
Chapter 5 Strategic Capacity Planning
MBA 570 Summer How much long-range capacity is needed When more capacity is needed Where facilities should be located (location) How facilities.
Capacity and Constraint Management
© 2004 by Prentice Hall, Inc., Upper Saddle River, N.J S 7-1 Operations Management Capacity Planning Supplement 7.
Operations Management Contemporary Concepts and Cases Chapter Twelve Capacity Planning Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights.
© 2007 Pearson Education Constraint Management Chapter 7.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 5 Capacity Planning For Products and Services.
CAPACITY MANAGEMENT CHAPTER 10 DAVID A. COLLIER AND JAMES R. EVANS.
CAPACITY LOAD OUTPUT.
Aggregate Planning in a Supply Chain
7 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Constraint Management (Short-term Capacity Planning) 7.
Operations Management
Pricing and Revenue Management in a Supply Chain
S7 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall S7 Capacity and Constraint Management PowerPoint presentation to accompany Heizer and.
Operations Management Capacity Planning Supplement 7
7 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Constraint Management 7 For Operations Management, 9e by Krajewski/Ritzman/Malhotra.
Operations Management Capacity Planning Supplement 7
Operations Management
For Products and Services
capacity planning and control
Operations Management
Operations Planning Horizons
20 Variable Costing for Management Analysis
CAPACITY MANAGEMENT CHAPTER 10 DAVID A. COLLIER AND JAMES R. EVANS.
OM2 CHAPTER 10 CAPACITY MANAGEMENT DAVID A. COLLIER AND JAMES R. EVANS.
Pricing and Revenue Management in a Supply Chain
1 Copyright ©2016 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole.
© 2012 Prentice Hall Inc Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall. 1-1 Copyright ©2013 Pearson Education, Inc. publishing.
PowerPoint presentation to accompany Heizer/Render - Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.,
© 2008 Prentice Hall, Inc.S7 – 1 Operations Management Supplement 7 – Capacity Planning PowerPoint presentation to accompany Heizer/Render Principles of.
Capacity Planning Production Planning and Control.
S7 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall Process Strategies ( process, repetitive, product) The objective of the process strategy.
LSM733-PRODUCTION OPERATIONS MANAGEMENT By: OSMAN BIN SAIF LECTURE 29 1.
1 OM3 Chapter 10 Capacity Management © 2012 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible.
© 2006 Prentice Hall, Inc.S7 – 1 Operations Management Capacity Planning © 2006 Prentice Hall, Inc.
DO NOT COPY Chapter 10 Capacity Management in service operations.
1 Differential Cost Analysis for Operating Decisions CHAPTER 7 © 2012 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated,
S7 - 1© 2014 Pearson Education, Inc. Capacity and Constraint Management PowerPoint presentation to accompany Heizer and Render Operations Management, Eleventh.
9 Differential Analysis and Product Pricing Managerial Accounting 13e
7 Capacity Planning PowerPoint presentation to accompany
S7 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall S7 Capacity and Constraint Management yl.
S7 - 1© 2014 Pearson Education Capacity Planning PowerPoint presentation to accompany Heizer and Render Operations Management, Global Edition, Eleventh.
© 2006 Prentice Hall, Inc.S7 – 1 Capacity Planning © 2006 Prentice Hall, Inc.
Lecture 11 Capacity Management and Planning Books Introduction to Materials Management, Sixth Edition, J. R. Tony Arnold, P.E., CFPIM, CIRM, Fleming College,
Capacity Planning Pertemuan 04
3-1Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall. Course Code MGT 561 Supply Chain Management Book: Supply Chain Management Strategy,
S7 - 1 Course Title: Production and Operations Management Course Code: MGT 362 Course Book: Operations Management 10 th Edition. By Jay Heizer & Barry.
Constraint Management Students should be able to: 1.Assess the capacity of a process 2.Define the Theory of Constraints and explain how to use it. 3.Identify.
© 2008 Prentice Hall, Inc.S7 – 1 Operations Management Supplement 7 – Capacity Planning PowerPoint presentation to accompany Heizer/Render Principles of.
McGraw-Hill/Irwin  The McGraw-Hill Companies, Inc. 2007, All Rights Reserved Facilities and Aggregate Planning Chapter 12 Due Date!
S7 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall S7 Capacity and Constraint Management PowerPoint presentation to accompany Heizer and.
 Capacity is the ability of a process or system to hold, receive, store or accommodate.  In business terms, it is the amount of output that a system.
© 2006 Prentice Hall, Inc.S7 – 1 Operations Management Supplement 7 – Capacity Planning © 2006 Prentice Hall, Inc. PowerPoint presentation to accompany.
Copyright ©2009 Pearson Education, Inc. Publishing as Prentice Hall 22-1 Operations Management 10.
© 2008 Prentice Hall, Inc.S7 – 1 Operations Management Supplement 7 – Capacity Planning PowerPoint presentation to accompany Heizer/Render Principles of.
Strategic Capacity Management
An Integrated Goods and Services Approach
Facilities and Aggregate Planning
Constraint Management
Capacity Planning For Products and Services
Capacity Planning For Products and Services
Operations Management
CAPACITY MANAGEMENT CHAPTER 10 DAVID A. COLLIER AND JAMES R. EVANS.
Capacity Planning For Products and Services
Copyright ©2016 Cengage Learning. All Rights Reserved
Presentation transcript:

Copyright ©2016 Cengage Learning. All Rights Reserved Copyright ©2016 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.

Explain the concept of capacity Describe how to compute and use capacity measures Describe long-term capacity expansion strategies Describe short-term capacity adjustment strategies Explain the principles and logic of the Theory of Constraints

Capacity Capability of a manufacturing or service resource to accomplish its purpose over a specified time period Viewed in two ways Maximum rate of output per unit of time or Units of resource availability

10.1 Examples of Short- and Long-Term Capacity Decisions

Economies and Diseconomies of Scale Achieved when the average unit cost of a good or service decreases as the capacity and/or volume of throughput increases Economies of scale Occur when the average unit cost of the good or service begins to increase as the capacity and/or volume of throughput increases Diseconomies of scale

(dollars per room per night) Economies and Diseconomies of Scale in capacity investments. Number of Rooms 25 50 75 (dollars per room per night) Average unit cost Many rooms -must have some variety, FC/75 Cheap, basic no variety, FC/25 Cheaper, basic no variety, FC/50 25 - room roadside motel 75 - room roadside motel 50 - room roadside motel Economies of scale Diseconomies of scale Figure S7.2 © 2011 Pearson Education, Inc. publishing as Prentice Hall

Focused Factory Way to achieve economies of scale without extensive investments in facilities and capacity by focusing on: Narrow range of goods or services Target market segments Dedicated processes to maximize efficiency and effectiveness

Steel mini mills in USA = focused factory Only one product (means no reheating and casting cost). Only open when there is demand for the product. Flexible labour plan Work = $22/hr all the overtime you want No work = $8 /hr 20hrs max maintenance

Safety Capacity (Capacity Cushion) Amount of capacity reserved for unanticipated events Demand surges Materials shortages Equipment breakdowns Average safety capacity(%) = 100% - Average resource utilization(%)

10.2 The Demand Versus Capacity Problem Structure

Capacity Measurement Work order: Specification of work to be performed for a customer or a client For any production situation, setup time can be a substantial part of total system capacity

Capacity Measurement Capacity required (Ci) = Setup time (Si) + [Processing time (Pi) x Order size (Qi)] Where Ci = Capacity requirements in units of time for work order i Si = Setup or changeover time for work order i as a fixed amount that does not vary with volume Pi = Processing time for each unit of work order Qi = Size of order i in number of units ΣCi = Σ[Si + (Pi x Qi)]

Design capacity (measured as utilisation) Capacity Definitions Design capacity (measured as utilisation) is the maximum theoretical output of a system normally expressed as a rate (output/time) Effective capacity (measured as efficiency) is the actual output expects to achieve given current operating constraints (e.g. downtime for maintenance) Often lower than design capacity

Utilization and Efficiency Utilization is the percent of design capacity achieved Utilization = Actual output/Design capacity (as %) Efficiency is the percent of effective capacity achieved Efficiency = Actual output/Effective capacity (as %)

Capacity Calculations A house painting business can (in theory) paint 100 houses per year. The boss has set a target of 90 houses per year to allow time for maintenance of the equipment, breakdowns etc. The business records show that over the last ten years they only paint 85 houses per year on average.

Long-Term Capacity Strategies Long-term capacity planning is closely tied to the strategic direction of the organization Complementary goods and services Produced or delivered using the same resources available to the firm Balance seasonal demand cycles and use the excess capacity available

Main Strategies for capacity management CHASE – change capacity to ‘chase’ demand changes. LEVEL – Keep capacity constant , try to manage demand. Level Capacity Chase Demand Size of variation Small Large Speed of change Slow Fast Predictability Predictable Unpredictable Costs Structure Fixed cost high Variable cost high Cost of complaints High Low Cost of lost business © 2011 Pearson Education, Inc. publishing as Prentice Hall

10.5 Seasonal Demand and Complementary Goods or Services

Snow mobiles and jetskis Same components and technology Snow mobiles and jetskis Same components and technology. Opposite seasonal peaks (summer & winter).

10.6 Capacity Expansion Options

Short-Term Capacity Management Done by adjusting short-term capacity levels Add or share equipment Sell unused capacity Change labor capacity and schedules Change labor skill mix Shift work to slack periods

Short-Term Capacity Management Shift and stimulate demand Vary the price of goods or services Provide customers with information Advertising and promotion Add peripheral goods and/or services Provide reservations

Short-Term Capacity Management Revenue management system(RMS) Dynamic methods to: Forecast demand Allocate perishable assets across market segments Decide when to overbook and by how much Determine what price to charge different customer (price) classes

Demand & Capacity Management in Services Demand management Appointment, reservations, FCFS rule Capacity management Staffing levels & scheduling full-time part-time Temporary/casual © 2011 Pearson Education, Inc. publishing as Prentice Hall

Set of principles that focuses on increasing total process throughput Theory of Constraints Set of principles that focuses on increasing total process throughput By maximizing the utilization of all bottleneck work activities and workstations Throughput: Amount of money generated per time period through actual sales

Constraint Anything that limits an organization from moving toward or achieving its goal Physical constraint: Associated with the capacity of a resource Bottleneck work activity: Effectively limits capacity of the entire process Nonbottleneck work activity: One in which idle capacity exists Nonphysical constraint: Associated with environmental or organizational capacity

Capability of a manufacturing or service resource to accomplish its purpose over a specified time period is known as capacity Capacity measurement ΣCi = Σ[Si + (Pi x Qi)] In developing a long-range capacity, a firm makes an economic trade-off between: Cost of capacity Opportunity cost of not having adequate capacity

If short-term demand is stable and sufficient capacity is available then, managing operations to ensure that demand satisfaction is easy Anything that limits an organization from moving toward or achieving its goal is known as constraint

Bottleneck work activity Capacity Complementary goods and services Constraint Diseconomies of scale Economies of scale Focused Factory Nonbottleneck work activity Nonphysical constraint

Physical constraint Revenue management system (RMS) Safety Capacity Theory of Constraints Throughput Work order