Drive Beam Status and Issues Drive beam quality Dispersion tuning Emittance Combination issues Piotr Skowroński Ben Constance Javier Barranco … 10 October.

Slides:



Advertisements
Similar presentations
Matching Injector To Linac. Caveats This is all loose and fuzzy – sort of religion We dont have real tight control over and knowledge of the machine –
Advertisements

R. Miyamoto, Beam Physics Design of MEBT, ESS AD Retreat 1 Beam Physics Design of MEBT Ryoichi Miyamoto (ESS) November 29th, 2012 ESS AD Retreat On behalf.
5/3/2015J-PARC1 Transverse Matching Using Transverse Profiles and Longitudinal Beam arrival Times.
S TEERING ALGORITHM EXPERIENCE AT CTF3 Davide Gamba 14 November 2013 The International Workshop on Future Linear Colliders LCWS13.
Commissioning August & September. 2 Agenda 11:20 Coffee 11:30 Introduction Sue S 11:35 Controls (an overview) Brian M 10:55 Controls & Data Acquisition.
P. Emma, SLACLCLS Commissioning – Sep. 22, 2004 Linac Commissioning P. Emma LCLS Commissioning Workshop, SLAC Sep , 2004 LCLS.
General improvements Upgrades Loose collection of items Changed – being changed – to be changed CTF3 working meeting10/02/121.
R. Corsini, CLIC Project Meeting - 24 th May 2013 CTF3 1 CTF3: Highlights of the 1 st run R. Corsini for the CTF3 Team 1.
CTF3 commissioning status R. Corsini - CTF3 committee 17 th September 2009 Update on CTF3 Operations and schedule This time I will try to give a more complete.
Bruno Muratori STFC, Daresbury Laboratory Commissioning EMMA 02/07/09 PRISM workshop – Imperial College.
March A. Chancé, J. Payet DAPNIA/SACM / Beta-beam ECFA/BENE Workshop The Decay Ring -First Design- A. Chancé, J.Payet CEA/DSM/DAPNIA/SACM.
CTF3 ORBIT : TOOLS AND AUTOMATIC TUNING Davide Gamba 4 February 2014 CLIC Workshop CERN.
Injector Setup/Mini-phase  Description of injector setup  sources of drift  Mini-phase procedure for injector  Checking the rest of the machine. Stephen.
Transfer Line -2 Optics Design For CTF3 Amalendu Sharma, Abdurrahim, A.D.Ghodke, Gurnam Singh and V.C. Sahni Raja Ramanna Centre for Advanced Technology.
Details of space charge calculations for J-PARC rings.
CTF Operations & Plans Piotr Skowroński for the CLIC Collaboration 27 January 2015 CLIC Workshop
Simulation of direct space charge in Booster by using MAD program Y.Alexahin, A.Drozhdin, N.Kazarinov.
B EAM STEERING EXPERIENCE AT CTF3 Davide Gamba 14 June 2014 Americas Workshop on Linear Colliders Fermilab.
R. Corsini, CLIC Project Meeting October 24, 2012 CTF3 Experimental program for end 2012 R. Corsini for the CTF3 Team 1.
1 BROOKHAVEN SCIENCE ASSOCIATES Storage Ring Commissioning Samuel Krinsky-Accelerator Physics Group Leader NSLS-II ASAC Meeting October 14-15, 2010.
1 FFAG Role as Muon Accelerators Shinji Machida ASTeC/STFC/RAL 15 November, /machida/doc/othertalks/machida_ pdf/machida/doc/othertalks/machida_ pdf.
J. Pfingstner Jitter studies February 12, 2014 Optics corrections in the ATF damping ring Jürgen Pfingstner, Yves Renier.
Optics considerations for ERL test facilities Bruno Muratori ASTeC Daresbury Laboratory (M. Bowler, C. Gerth, F. Hannon, H. Owen, B. Shepherd, S. Smith,
BPMs period General BPM Tasks/Projects New single bunch BPM electronics on ALICE AR1 + ST2 They had been tested already last year by Alex and Ian.
Low emittance tuning in ATF Damping Ring - Experience and plan Sendai GDE Meeting Kiyoshi Kubo.
Bruno Muratori (for the EMMA team) STFC, Daresbury Laboratory EMMA commissioning 02/09/08.
Design of the Turnaround Loops for the Drive Beam Decelerators R. Apsimon, J. Esberg CERN, Switzerland.
Beam stability in damping ring - for stable extracted beam for ATF K. Kubo.
Beam Dynamics WG K. Kubo, N. Solyak, D. Schulte. Presentations –N. Solyak Coupler kick simulations update –N. Solyak CLIC BPM –A. Latina: Update on the.
15 Oct 2008CLIC Workshop1 CTF3 Commissioning and Operation Simona Bettoni, Caterina Biscari, Roberto Corsini, Anne Dabrowski, Steffen Doebert, Andrea Ghigo,
1 General Status of Commissioning Piotr Krzysztof Skowroński CTF3 Collaboration Technical Meeting 27 January 2009.
ATF2 Tuning Summary Nov & Dec 2010 Glen White, SLAC 11 th ATF2 Project Meeting, SLAC Jan
1 R. Corsini – CLIC Project Meeting CTF3 Update CTF3 Update R. Corsini for the CTF3 Team 1.
… Work in progress at CTF3 … Davide Gamba 01 July 2013 Study and Implementation of L INEAR F EEDBACK T OOLS for machine study and operation.
Beam Based Optics Measurements CTF3 Collaboration meeting CERN Yu-Chiu Chao, TJNAF.
P. Urschütz - CTF3 Collaboration Meeting 2007 CTF3 commissioning & operation in 2006 P. Urschütz for the CTF3 operations team  Commissioning of the Delay.
Principals of fast injection and extraction R. Apsimon.
PSB H- injection concept J.Borburgh, C.Bracco, C.Carli, B.Goddard, M.Hourican, B.Mikulec, W.Weterings,
Injection and protection W.Bartmann, C.Bracco, B.Goddard, V.Kain, M.Meddahi, V.Mertens, A.Nord, J.Uythoven, J.Wenninger, OP, BI, CO, ABP, collimation,
CTF3 Drive Beam studies results & Program Piotr Skowroński for the CTF3 team 30 December 2013 CLIC Workshop
Oleksiy Kononenko CERN and JINR
DRAFT: What have been done and what to do in ILC-LET beam dynamics Beam dynamics/Simulations Group Beijing.
Injection status W. Bartmann, C. Bracco, B. Goddard, V. Kain, A. Macpherson, M. Meddahi, S. Redaelli, J. Uythoven, J. Wenninger LIBD Meeting, 20 th Sept.
Tools in CTF3 Simona Bettoni for the CTF3 operation team.
2014 Issues & Strategy execution Piotr Skowroński 18 January 2016 CLIC Workshop
AGS FY11 Summary RHIC Spin Collaboration Meeting 5/6/11.
C. Biscari, D. Alesini, A. Ghigo, F. Marcellini, LNF-INFN, Frascati, Italy B. Jeanneret, CERN, Geneva, Switzerland CLIC DRIVE BEAM FREQUENCY MULTIPLICATION.
CLIC Frequency Multiplication System aka Combiner Rings Piotr Skowronski Caterina Biscari Javier Barranco 21 Oct IWLC 2010.
CLIC 09 Workshop - C. Biscari C. Biscari, D. Alesini, A. Ghigo, F. Marcellini, LNF-INFN, Frascati, Italy B. Jeanneret, F. Stulle, CERN, Geneva, Switzerland.
Threading / LTC/ JW1 How difficult is threading at the LHC ? When MADX meets the control system … J. Wenninger AB-OP &
Frank Stulle, ILC LET Beam Dynamics Meeting CLIC Main Beam RTML - Overview - Comparison to ILC RTML - Status / Outlook.
Simulation for Lower emittance in ATF Damping Ring Kiyoshi Kubo Similar talk in DR WS in Frascati, May 2007 Most simulations were done several.
Beam Commissioning Adam Bartnik.
Alignment and beam-based correction
Piotr Skowroński for the CTF3 team
Nonscaling FFAG design and EMMA experiment
Steering algorithm experience at CTF3
Emittance Dilution and Preservation in the ILC RTML
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Monday h00: Ramp 10 A/s (chromaticity, crossing angle non-closure, beta-beating): At 7m and 3.5m, put in one by one crossing angles, calculated.
Drive Beam Status and Issues Drive beam quality Dispersion tuning Emittance Combination issues Piotr Skowroński CTF3 Meeting 9 February 2012.
Thursday morning – optics correction
SuperB ARC Lattice Studies
Beam-Based Alignment Results
Quadrupole error localization using Response Fits
Impact of short dipoles on PSB performance (status)
Simulation of the FCC-ee lattice with quadrupole and sextupole misalignments Sergey Sinyatkin.
High Level Physics Applications for LCLS Commissioning
Linac Physics, Diagnostics, and Commissioning Strategy P
Yuri Nosochkov Yunhai Cai, Fanglei Lin, Vasiliy Morozov
Presentation transcript:

Drive Beam Status and Issues Drive beam quality Dispersion tuning Emittance Combination issues Piotr Skowroński Ben Constance Javier Barranco … 10 October 2012 CTF3 Meeting 1

February Summary: Issues and spaces calling for improvements Switches Misalignment in the Delay Loop R56 of Frascati Chicane; Spurious dispersion from Frascati that appeared in Aug 2010  spent already a lot effort to find the source -> no effect  Found a work-around by tuning a quad inside  Might be related to the difficulty of setting op smaller R56 Optics check and control in TL2 and TBTS Orbit Closure in DL and CR => Emittance  Need additional attenuation for the 2 nd RF deflector Chromatic corrections (need good orbit) Tune measurement and control in CR For both, DL and CR, beam trajectory is steered down when passing through or passing by the septa 10 October 2012 CTF3 Meeting 2

Delay Loop misalignment corrected Alignment of the quads helped indeed  Much easier setup this year  Much more space for beam drifts and jitters But still  The orbit exhibits the dip after the septum  The last vertical corrector before the ejection is at A 10 October 2012 CTF3 Meeting 3

Orbit: CL & CT 10 October 2012 CTF3 Meeting 4 Linac OK, issues start at its end  Girder 14: a small bump  CT.DHD0160: always at -1.6A or more  CT.BHB0510 is always almost 2x CT.BHB0490 to get good transmission in TL1  And than beginning of TL1  CT.DHF A  CT.DHF A  CT.DHF A Must make “a deap” before DL inj so the beam goes up through the septa and it is easier to “fish it out” inside DL  It causes the wave in TL1  If not DL, the orbit can be made easily perfect in vertical

Orbit CR  DH -3.5  DH 4  DH -4.8  DH -1.2  DH -6.5 Automatic would be appreciated but it is difficult with the misalignments  DFS ? 10 October 2012 CTF3 Meeting 5

Orbit TL2 We can get a straight orbit, no problem, but same correctors are always strong  DV -3A  DH 7A  DV 2.4A 10 October 2012 CTF3 Meeting 6

Optics overview Linac – well understood Chicane – measurements with natural R56 agree CT – we need to understand difference between the CT and CTS quad scan measurements. Important for DL injection  Should repeat over longer distance (to TL1 and/or DL)  Tricky due to BPI’s issues DL – measured and model corrected TL1 – understood from previous response measurements  Regular Response Matrix gave very good agreement CR – first half measured and agrees with model. We should measure the second half, and over multiple turns  Good agreement in hor. with regular multi-turn RM  Bend edge focusing was tweaked to get agreement in vert. TL2 – Not yet studied… 10 October 2012 CTF3 Meeting 7 Ben Constance

Optic Control in TL2 and TL2 prime We run an empirically setup TL2 since 3 years  Problems with quad scans at MTV 253  Initial problems with BPMs Line was never measured properly  The dogleg was tweaked to get zero dispersion in CLEX  But we have no control of R56  The model we have shows not optimal patterns 2-3 Days needed to measure the line properly and verify the model  Start from model predicted, relaxed optics (no R56 constraint) Get large acceptance Can start from measured Twiss parameters at CC.253, but do not have to  Check and correct dispersion To assure the large acceptance  Measure the optics with phase-space scans Preferably starting from CR to measure the ejection dogleg Also from girder 2 to get higher amplitudes  If any doubts found, set optics without suspected quads and re- measure  Plug in the nominal optics, set it up and re-measure 10 October 2012 CTF3 Meeting 8

Transverse Matching Girder 10 OK Around DL: Not perfect, but not very bad never sure about quad scan validity  Need 1-2 days to fix it properly CR: Nothing done in this matter during this year  Neither during previous one  We circulate beam in thousands of turns Only short pulse Combined does not want to stay more than 5, but still  It gives indication that the beta beat is not crazy big But combined emittance … And in case of a bad closure 10 October 2012 CTF3 Meeting 9

Transvers Matching The issues At some locations we have trouble having reliable measurement. Consolidation needed.  Check software using MAD simulated profiles  Check carefully lines used for scans Distances between quads and screen  Check screen calibrations  How can we be sure that we do not scrape between quad and screen? We have no BPM in between  We observe very small beam sizes in the waist, below 0.3mm sigma Pixel size is around 0.1mm Small emittance and short distance to screen gives small beam sizes Shall we try using quads further away from the screen? At least for cross-checks? Combiner Ring: Need 2 full good days to have chance to make it better  Measure Twiss in CRM, adjust CT/TL1  Measure Twiss for each turn separately  Back-track with the model, scale CR  Re-measure and see if it converges  If not, check the optics more carefully 10 October 2012 CTF3 Meeting 10

Chromatic corrections The optics checks and transverse matching in Combiner Ring would be much easier if we had optics with zero chromaticity  It prevents filamentation, so we could observe the transverse oscillations for enough turns to get Tunes Phase advances between pickups  Local optics errors, beta beat Amplitudes  beta beat We have sextupoles, but we do not use them  Bad orbit prevents us using them Huge feed-down leading quickly to complete beam loss Sextuples should also help with the emittance preservation  But might be tricky with their limited number ( 3 families in CR) 10 October 2012 CTF3 Meeting 11

Dispersion The dispersion is well controlled Need to be careful with strong steerers which can spoil dispersion Controlled with 2 different measurement methods  Scaling all magnetic elements  Change of beam energy with MKS15 A variant: make a step in compressed amplitude and watch the step in BPM traces 10 October 2012 CTF3 Meeting 12

Emittance [mm mrad] Girder 10  Horizontal 40-> 60  Vertical 40 -> 60 CT.0435  Horizontal 50-> 500  Vertical 40 -> 400 CTS  Horizontal 60 -> 200  Vertical 70 -> 200 CC.253  No reasonable data this year CC.957 factor 1  Horizontal 120 -> 300  Vertical 60 -> 70 CC.957 factor 4  Horizontal 320 -> 350  Vertical 100 -> October 2012 CTF3 Meeting 13

CR recombination with new attenuator for the 2 nd RF deflector 10 October 2012 CTF3 Meeting 14

Recombination Looks good, but  Need little bit more tuning to close the orbit properly on all BPMs around the machine Some automation?  The bump is too low, should be 27mm, but it is not really important (I think)  The machine quickly (too quickly) drifts from the sweet point Need more feed-back to lock it? 10 October 2012 CTF3 Meeting 15

Factor 8 The biggest issue is the orbit closure and its stability  Davide made the automatic tool for that  But it is still rather a development version When can we have it in production? 10 October 2012 CTF3 Meeting 16

Stability of Optics We can match different beam parameters at a time But the machine is drifting permanently  Different knobs are tweaked Usually to circumvent the machine drifts or change of RF parameters due to hardware modifications (repairs) In the most cases it drives the beam out of the set-point  Orbit, energy (and hence dispersion, transverse matching, bunch length) Good quality production beam  we must implement  Rigorous procedures on changes of machine settings  Full set of feed-backs keeping all different parameters fixed RF pulse flatness RF phase Injector: Combined BPR + current level + loading on PEI03 Loadings Beam energy on average, as well as flatness along the pulse 10 October 2012 CTF3 Meeting 17

February Summary: Issues and spaces calling for improvements Switches Misalignment in the Delay Loop R56 of Frascati Chicane; Spurious dispersion from Frascati that appeared in Aug 2010  spent already a lot effort to find the source -> no effect  Found a work-around by tuning a quad inside  Might be related to the difficulty of setting op smaller R56 Optics check and control in TL2 and TBTS Orbit Closure in DL and CR => Emittance  Need additional attenuation for the 2 nd RF deflector Chromatic corrections (need good orbit) Tune measurement and control in CR For both, DL and CR, beam trajectory is steered down when passing through or passing by the septa 10 October 2012 CTF3 Meeting 18

Outlook Only few points were removed from the issue list of the previous year I would add Long Term Stability  CTF3 is old enough – we start understanding the machine well We should make changes in the settings only for good reasons and stick to them Orbit and beam energy should be frozen  Now orbit changes every second day I think, next year when we restart the machine we should not  Setup injector from scratch  Re-match Linac (only to check)  Redo the steering  Redo orbit closure in CR and DL  Re-matching of CT and DL We should NOT redo the same procedures all over again every month 10 October 2012 CTF3 Meeting 19

ADDITIONAL SLIDES 10 October 2012 CTF3 Meeting 20

10 October 2012 CTF3 Meeting 21

10 October 2012 CTF3 Meeting 22

Misalignment in CR 10 October 2012 CTF3 Meeting 23 Arc off Arc on Ben Constance

10 October 2012 CTF3 Meeting 24

CTS line scans 29/06/ GHz bypassing w/ satellites killed 10 October 2012 CTF3 Meeting 25

Backpropogated optics 10 October 2012 CTF3 Meeting 26 Ben Constance

Delayed beam vertical only plus satellites, mismatched 10 October 2012 CTF3 Meeting 27

Rescaled CT line to 128 MeV, straight beam again 10 October 2012 CTF3 Meeting 28

Delayed plus satellites 10 October 2012 CTF3 Meeting 29

CT435 H 10 October 2012 CTF3 Meeting 30

CT435 V 10 October 2012 CTF3 Meeting 31

CTS H 10 October 2012 CTF3 Meeting 32

CTS V 10 October 2012 CTF3 Meeting 33

CLEX H (f4) 10 October 2012 CTF3 Meeting 34

CLEX V f4 10 October 2012 CTF3 Meeting 35

CLEX H f1 10 October 2012 CTF3 Meeting 36

CLEX V f1 10 October 2012 CTF3 Meeting 37

Chicane optics measurements Natural R56 12/06/ October 2012 CTF3 Meeting 38 Ben Constance

Chicane optics measurements ● Uses standard phase space painting technique ● Painted ellipse directly observed by turning off quads ● Ellipse at a given BPM reconstructed using the immediate downstream BPM (blue) and immediate upstream BPM (green) ● Comparing these gives a measure of accuracy of reconstruction (e.g BPI0487) ● Given this, the measurements agree quite well with the MAD-X predictions ● However, should repeat with different R56s with more, stronger quads 10 October 2012 CTF3 Meeting 39 Ben Constance

10 October 2012 CTF3 Meeting 40 Ben Constance

10 October 2012 CTF3 Meeting 41 Ben Constance

10 October 2012 CTF3 Meeting 42 Ben Constance