Life Cycle Logistics Validation and Workforce Assessment LOG FIPT Presentation March 28, 2008 LOG FIPT AT&L HCSP Competency Initiative … Enabling a High-Performing,

Slides:



Advertisements
Similar presentations
Project Management Concepts
Advertisements

Intelligence Step 5 - Capacity Analysis Capacity Analysis Without capacity, the most innovative and brilliant interventions will not be implemented, wont.
Roadmap for Sourcing Decision Review Board (DRB)
Teacher Evaluation Model
Department of Tourism Department of Tourism NTSS DRAFT REVIEW FRAMEWORK NTSF MEETING 17 SEPTEMBER 2014.
DoD Integrated Product Support Roadmap Tool
1 Competency-based Management for the DoD-wide Contracting Community Overview Brief March 2008.
System Office Performance Management
Chapter 5: Project Scope Management
System Office Performance Management
DEFINING JOB PERFORMANCE AND ITS RELATIONSHIP TO ASSESSMENTS.
AT&L Workforce Competency Management Overview LOG FIPT Presentation Lead-in to Assessment AT&L HCSP Competency Initiative … Enabling a High-Performing,
Competency Management Overview Jonathan Higgins AT&L Workforce Career Management.
Unclassified. Program Management Empowerment and Accountability Mr. David Ahern Director, Portfolio Systems Acquisition AT&L(A&T) 14 April 2009 The Acquisition.
Chapter : Software Process
Process: A Generic View
Life Cycle Logistics FIPT
Meeting SB 290 District Evaluation Requirements
Project Management Process Overview
PMP® Exam Preparation Course
Mr. Frank J. Anderson, Jr. President, Defense Acquisition University Acquisition Education Challenges and the Human Capital Strategic Plan.
Project Management : Techniques and Tools (60-499) Fall 2014 / Winter 2015.
Demystifying the Business Analysis Body of Knowledge Central Iowa IIBA Chapter December 7, 2005.
© Grant Thornton | | | | | Guidance on Monitoring Internal Control Systems COSO Monitoring Project Update FEI - CFIT Meeting September 25, 2008.
5 March 2012 Full-time Support Review of the Reserve Components Phase 1: An analysis of and report for Congress on the Military Technician (MilTech) Program.
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by.
Chapter 2 Process: A Generic View
Welcome to Session 4 – Project Management Process Overview (continued) Instructor:Phyllis Sweeney Instructor: Phyllis Sweeney Project Management Certificate.
A COMPETENCY APPROACH TO HUMAN RESOURCE MANAGEMENT
What is a Business Analyst? A Business Analyst is someone who works as a liaison among stakeholders in order to elicit, analyze, communicate and validate.
SacProNet An Overview of Project Management Techniques.
DCIPS Implementation Project Plan Update Army G2 Intelligence Personnel Management Office (IPMO) April 6, 2009.
© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S.
Sheri Ginett, IIDA, NCIDQ, Interior Architects Carol Fadden, Duke Energy September 9, 2015 OPERATIONAL EXCELLENCE PROGRESSIVE + STRATEGIC WORKPLACE.
Department of Navy Logistics Community Update to Logistics FIPT 28 January 2004 DoN Log. Community = 25 Job Series & 11,458 people.
Improving Certification, Training, & Professional Development for the AT&L Community Project Update Robert Hausmann, CNAC Judith Bayliss, DAU.
@2002 Copyright, Itreya Technologies CMMI kick off July 2005.
Formal Presentation to the FIPT Improving Certification, Training and Professional Development for the AT&L Community Life Cycle Logistics Career Field:
1 Dr. Nancy L. Spruill Director, Acquisition Resources & Analysis, OUSD(AT&L) Restructure of Business Career Field.
Life Cycle Logistics FIPT Life Cycle Logistics Learning Asset Association for FIPT Approved High Priority Competencies 21 October 2011.
Practical Investment Assurance Framework PIAF Copyright © 2009 Group Joy Pty. Ltd. All rights reserved. Recommended for C- Level Executives.
DoD Logistics Human Capital Strategic Planning Overview June 26, 2007.
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 1 Diploma of Project Management.
Business, Cost Estimating, and Financial Management Presented by Ms. Sharon Jackson September 14, 2007.
Business Analysis. Business Analysis Concepts Enterprise Analysis ► Identify business opportunities ► Understand the business strategy ► Identify Business.
BISD Update Teacher & Principal Evaluation Update Board of Directors October 27,
April 28, 2006 Core Plus Pilot Program. Core Plus Logistics Pilot Program (Trailblazer) SCOPE: DAU and AT&L workforce wide applicability DESCRIPTION:
Integrated Change Control 1 MEC-8. Processing of a Change Processing of a Change 2 Assess Impact within KA Change Request Implemented Change Create a.
Evaluate Phase Pertemuan Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
Life Cycle Logistics Competency Development and Management Process Task Closeout LOG FIPT Presentation May 9, 2008 LOG FIPT AT&L HCSP Competency Initiative.
GC e-Orientation Program for New Hire Module 4 – Knowing your Career in Oracle Updated by HR in July 03.
1 Lecture 2.4a: SEF SE Planning and the SEP (SEF Ch 16) Dr. John MacCarthy UMBC CMSC 615 Fall, 2006.
1 Systems Engineering Initiatives 26 June 2007 Dr. Don Gelosh Sr. Systems Engineering Consultant OSD(AT&L)/SSE/ED.
LOG235/236 Performance Based Logistics Bruce Hatlem Logistics Functional IPT September 2007.
Learn. Perform. Succeed. LOG 201 Intermediate Acquisition Logistics, Part B Terry Johnson, Product Support Integration PLD 23 January 2015.
LOG204 (DL) Configuration Management Bruce Hatlem Logistics Functional IPT June 26, 2007.
FY12-14 Life Cycle Logistics DAWIA Certification Requirements Overview and Life Cycle Logistics Competency Validation Status Update Life Cycle Logistics.
© 2015 Deloitte Belgium1 Enhancing the management culture at DG EAC Implementation of a 360° feedback exercise.
© PeopleAdvantage 2013 All Rights Reserved We will Show You How to Easily Conduct Effective Performance Appraisals LCSA Conference 2013.
Operations myPerformance Training FY16 Improvements.
1 ME Spring 2015 Systems Engineering, Part II Session 8 5 February 2015 Mr. Larry Hopp, CPL © Copyright 2013.
Logistics Community Competency Initiative Update November 20, 2006 Mark Tregar, CNAC Judith Bayliss, DAU “The Total Force must continue to adapt to different.
AHIMA’s Commission on Certification for Health Informatics and Information Management (CCHIIM) Test Development Process Jo Santos, RHIA Senior Manager,
The Performance and Staff Development Program
Sample Fit-Gap Kick-off
Professional Development Department &
Implementing the Specialized Service Professional State Model Evaluation System for Measures of Student Outcomes.
Human Resources Management
Colorado Department of Education
Presentation transcript:

Life Cycle Logistics Validation and Workforce Assessment LOG FIPT Presentation March 28, 2008 LOG FIPT AT&L HCSP Competency Initiative … Enabling a High-Performing, Agile Workforce

2 Participation Exceeded our aim of 1092 employees Adequate Participation Achieved: Of the 5635 LCL professionals randomly identified, 1295 completed the assessment for a total response rate of 22.9%. –This number is more than sufficient for the current analysis Focus is on Validation of the model –Ensuring competencies are related to the “job” of a Life Cycle Logistics professional –Not enough supervisor participation: Did not allow for workforce proficiency gap assessment Appropriate to focus on validation for this level of development of our competency model There are many options for building off the the current work to look into workforce assessment and workforce planning aspects

3 Participation In Detail Career LevelFrequencyPercent Entry Level181.4 Journey Level Senior Level Total Military/Civilian StatusFrequencyPercent Civilian Military544.2 Total Primary RoleFrequencyPercent System Sustainment Acquisition Logistics Total Years LCLFrequencyPercent 1 to 5 Years LCL Experience to 10 Years LCL Experience to 15 Years LCL Experience to 20 Years LCL Experience Years LCL Experience Missing332.5 Total Average14.1 years ComponentFrequencyPercent Army Navy (including USMC) Air Force th Estate (DCMA, DLA, Other)423.2 Total

4 Technical Competency Assessment What Did We Ask The Participants? Frequency, Criticality, and Proficiency

5 Competency Results – Validation Frequency and Criticality Earned Value Management Provide supportability data to ensure inclusion in EVM tracking where appropriate. (E6) Utilizing Simulation and Modeling Techniques Use modeling and simulation to estimate cost and/or performance parameters. (E2) Integrated Product and Processes Development (IPPD) Contribute to an IPT to ensure logistics considerations are represented in the program. (E12) What competencies were rated highest across all ratings? Integrated Product and Process Development (IPPD) Maintaining and Managing Customer Relationships What competencies were rated lowest across all ratings? Utilizing Simulation and Modeling Earned Value Management Maintaining and Managing Customer Relationships Communicate with the customer to verify that logistics requirements are stated accurately in the system design. (E14) Use customer feedback tools or methods to refine, maintain, and/or share logistics information. (E15) Competency Element In Assessment

6 Exploratory Factor Analysis Unit 2: Performance-Based Logistics Planning and Management Unit 3: Collaborate with Customers to Enhance Supportablity Unit 1: Utilizing Test Data for Best Design, Configuration, and Processes Unit 4: Cost Evaluation for Sustainment of Systems Unit 1: Utilizing Test Data for Best Design, Configuration, and Processes Unit 2: Performance-Based Logistics Planning and Management Unit 3: Collaborate with Customers and IPT members to Enhance Supportability Unit 4: Cost Evaluation for Sustainment of Systems

7 Competency Results – By Unit Level What Unit Was Rated Highest Across All Ratings? Unit 3 Collaborate with Customers and IPT members to Enhance Supportability is the highest rated across frequency, criticality, and proficiency The next highest was Unit 2: Performance-Based Logistics Planning and Management across all ratings Which Units Were Rated Lowest? The Lowest Rated Units then vary between Unit 1 and Unit 4 in Frequency, Criticality, and Proficiency Unit 4: Cost Evaluation for Sustainment of Systems Unit 1: Utilizing Test Data for Best Design, Configuration, and Processes

8 Schedule and Deliverables Sponsor review version delivered to FIPT Mid-April Collect comments and feedback during the review from Complete April 30 We Plan to Formally deliver to Mr. Hall and the FIPT in May

9 Logistics Competency Management Workforce Validation Questions?

10 Competency Results – Differences by Component Army is different in Frequency & Criticality Army (mean 2.4) does significantly less Unit 1,2, & 3 activities than Air Force or Navy Army participants see Unit 1,2, & 3 as significantly less critical than Air Force or Navy The job of an Army Life Cycle Logistician may be significantly different than that of a practitioner in Air Force or Navy. We know there are more Army LCLoggies than others They may have a more wide variety of duties, beyond our competency model There are no differences in Proficiency between the major Service Components

11 Framework Development Framework Development Phase I - Convene an expert panel (EP) Actions: Develop a competency framework & input model EP identifies Subject Matter Experts (SMEs) EP communicates competency effort to the SMEs Develop communications package Goal: Establish baseline of existing competency model. Communicate effort Products: FA provides list of targeted high-performing SMEs Obtains expert panel concurrence on baseline competency framework Obtain approval from Dir, HCI and FA on competency model input Phase I - Convene an expert panel (EP) Actions: Develop a competency framework & input model EP identifies Subject Matter Experts (SMEs) EP communicates competency effort to the SMEs Develop communications package Goal: Establish baseline of existing competency model. Communicate effort Products: FA provides list of targeted high-performing SMEs Obtains expert panel concurrence on baseline competency framework Obtain approval from Dir, HCI and FA on competency model input Phase IV – Validate and Assess Actions: Launch competency assessment tool Analyze results to evaluate model validity and generalizability to the workforce Goal: Identify competencies required for superior performance Evaluate proficiency gaps for validated competencies Plan for continual updates and use of competency model Products: Deliver proven (validated) competency model in HR XML format Provide competency validation and assessment and obtain Dir, HCI and FA approval Phase IV – Validate and Assess Actions: Launch competency assessment tool Analyze results to evaluate model validity and generalizability to the workforce Goal: Identify competencies required for superior performance Evaluate proficiency gaps for validated competencies Plan for continual updates and use of competency model Products: Deliver proven (validated) competency model in HR XML format Provide competency validation and assessment and obtain Dir, HCI and FA approval AT&L Competency Management Process Model Testing & Refinement Model Testing & Refinement Model Development V 1.0 CompetencyModel Proposed Competency Model Report Approved Initial Competency Model V 0.5 Phase III – Perform a beta test & refine model Actions: Collect and synthesize feedback from proposed model report Pre-assessment communications to workforce Identify stratified workforce sample Goal: Further refine model to include input from functional leads Obtain FA and Dir, HCI approval for validation assessment Products: Obtain concurrence from FIPT on competency model Obtain approval from Dir, HCI and FA on competency model Phase III – Perform a beta test & refine model Actions: Collect and synthesize feedback from proposed model report Pre-assessment communications to workforce Identify stratified workforce sample Goal: Further refine model to include input from functional leads Obtain FA and Dir, HCI approval for validation assessment Products: Obtain concurrence from FIPT on competency model Obtain approval from Dir, HCI and FA on competency model Phase II – Develop the model Actions: SMEs review the competency framework and provide essential job data through structured interviews and online data collection tools. SMEs engaged to identify key “work” situations and competencies contributing to successful performance Analyze results and develop competency model content Goal: Model development and identification of key behaviors Products: Deliver Proposed Model Report to Dir, HCI and FA for review Phase II – Develop the model Actions: SMEs review the competency framework and provide essential job data through structured interviews and online data collection tools. SMEs engaged to identify key “work” situations and competencies contributing to successful performance Analyze results and develop competency model content Goal: Model development and identification of key behaviors Products: Deliver Proposed Model Report to Dir, HCI and FA for review Collect Existing Competency Data CompetencyValidation & Assessment Report Approved Input Competency Model Competency Validation, Assessment, and Sustainment Competency Validation, Assessment, and Sustainment May 06 – July 06Sep Jun 07 Nov 07 - Present Jan Apr 08

12 Sample Size Criteria Assumption 50%Population # Sample Size based on Component Breakdown PM LCL SPRDE SE BCEFM Property530 Using components to stratify the sample we need: Assumptions: 1. Assume a 50 percent response rate 2. Stratified sample based on component population Note: Samples are different with similar population numbers due to differing stratification across components. If you have a large concentration of staff in one or two major components you will need less than expected from those areas

13 Logistics Competency Management Workforce Validation What has been done? LCL experts met with CNA to refine competency elements Website has been tested and feedback has been collected A random sample from each component has been selected and will be ed by CNA with login information Launch details have been finalized Changes are being implemented and a final round of testing will close Jan-14 to be sent co-signed from Mr. Hall and Mr. Anderson to be sent Jan-14

14 Analysis Business Rules for Inclusion/Exclusion in Sample –Extreme proficiency rating differences between supervisor and employee will be discarded –If employee-supervisor pair incomplete, only importance and frequency ratings will be factored into final results Assumptions/Approach for Reporting Results –Gap scores are combined to make a composite score –Composite score of employee and supervisor data will be compared to a standard –Gaps will be reported based on the magnitude of difference to the proficiency standard to identify most to least critical