Ian Bird GDB; CERN, 8 th May 2013 March 6, 2013

Slides:



Advertisements
Similar presentations
Data Management TEG Status Dirk Duellmann & Brian Bockelman WLCG GDB, 9. Nov 2011.
Advertisements

Ian Bird LHCC Referees’ meeting; CERN, 18 th November 2014.
Ian Bird LCG Project Leader LHCC + C-RSG review. 2 Review of WLCG  To be held Feb 16 at CERN  LHCC Reviewers:  Amber Boehnlein  Chris.
CERN Summary Ian Bird eInfrastructure Workshop 9 December, 2003.
12. March 2003Bernd Panzer-Steindel, CERN/IT1 LCG Fabric status
Making A Presentation To Investors. Introduction Introduce the speakers. Introduce the speakers. State the reasons for presenting. State the reasons for.
DATA PRESERVATION IN ALICE FEDERICO CARMINATI. MOTIVATION ALICE is a 150 M CHF investment by a large scientific community The ALICE data is unique and.
Trigger and online software Simon George & Reiner Hauser T/DAQ Phase 1 IDR.
Ian Bird WLCG Workshop Okinawa, 12 th April 2015.
Ian Bird WLCG Management Board CERN, 17 th February 2015.
Ian Bird LHCC Referees’ meeting; CERN, 11 th June 2013 March 6, 2013
October 24, 2000Milestones, Funding of USCMS S&C Matthias Kasemann1 US CMS Software and Computing Milestones and Funding Profiles Matthias Kasemann Fermilab.
LCG Milestones for Deployment, Fabric, & Grid Technology Ian Bird LCG Deployment Area Manager PEB 3-Dec-2002.
REVIEW OF NA61 SOFTWRE UPGRADE PROPOSAL. Mandate The NA61 experiment is contemplating to rewrite its fortran software in modern technology and are requesting.
Ian Bird LHCC Referee meeting 23 rd September 2014.
LHC Computing Review Recommendations John Harvey CERN/EP March 28 th, th LHCb Software Week.
Workshop summary Ian Bird, CERN WLCG Workshop; DESY, 13 th July 2011 Accelerating Science and Innovation Accelerating Science and Innovation.
Ian Bird Meeting with LHCC Referees CERN, 3 rd June 2014.
ATLAS in LHCC report from ATLAS –ATLAS Distributed Computing has been working at large scale Thanks to great efforts from shifters.
©Ian Sommerville 2004 Software Engineering. Chapter 21Slide 1 Chapter 21 Software Evolution.
Ian Bird LHCC Referees Meeting; CERN, 12 th March 2013 March 6, 2013
Summary of RSG/RRB Ian Bird GDB 9 th May 2012
Ian Bird Trigger, Online, Offline Computing Workshop CERN, 5 th September 2014.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 21 Slide 1 Software evolution 1.
CERN IT Department CH-1211 Geneva 23 Switzerland t GDB CERN, 4 th March 2008 James Casey A Strategy for WLCG Monitoring.
LHCbComputing Manpower requirements. Disclaimer m In the absence of a manpower planning officer, all FTE figures in the following slides are approximate.
1 LHCC RRB SG 16 Sep P. Vande Vyvre CERN-PH On-line Computing M&O LHCC RRB SG 16 Sep 2004 P. Vande Vyvre CERN/PH for 4 LHC DAQ project leaders.
Ian Bird GDB CERN, 9 th September Sept 2015
Procedure to follow for proposed new Tier 1 sites Ian Bird CERN, 27 th March 2012.
Evolution of storage and data management Ian Bird GDB: 12 th May 2010.
Future computing strategy Some considerations Ian Bird WLCG Overview Board CERN, 28 th September 2012.
Procedure for proposed new Tier 1 sites Ian Bird WLCG Overview Board CERN, 9 th March 2012.
Sixth Power Plan A Public Utility Point of View Bill Gaines, Director, Tacoma Public Utilities Craig Smith, Assistant General Manager, Snohomish PUD Northwest.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 21 Slide 1 Software evolution.
LHCbComputing Resources requests : changes since LHCb-PUB (March 2013) m Assume no further reprocessing of Run I data o (In.
LHC Computing, CERN, & Federated Identities
Ian Bird WLCG Workshop, Barcelona, 9 th July July 2014 Ian Bird; Barcelona1.
Ian Bird LCG Project Leader Updating the Resource Planning for 2009/2010.
Ian Bird CERN, 17 th July 2013 July 17, 2013
Ian Bird, CERN 2 nd February Feb 2016
Summary of HEP SW workshop Ian Bird MB 15 th April 2014.
Ian Bird WLCG Networking workshop CERN, 10 th February February 2014
Ian Bird Overview Board; CERN, 8 th March 2013 March 6, 2013
LHCbComputing Computing for the LHCb Upgrade. 2 LHCb Upgrade: goal and timescale m LHCb upgrade will be operational after LS2 (~2020) m Increase significantly.
WLCG Technical Evolution Group: Operations and Tools Maria Girone & Jeff Templon GDB 12 th October 2011, CERN.
WLCG Status Report Ian Bird Austrian Tier 2 Workshop 22 nd June, 2010.
Evolution of WLCG infrastructure Ian Bird, CERN Overview Board CERN, 30 th September 2011 Accelerating Science and Innovation Accelerating Science and.
Ian Bird, CERN 1 st February Dec 2015
Traceability WLCG GDB Amsterdam, 7 March 2016 David Kelsey STFC/RAL.
Computing Fabrics & Networking Technologies Summary Talk Tony Cass usual disclaimers apply! October 2 nd 2010.
LHCbComputing Update of LHC experiments Computing & Software Models Selection of slides from last week’s GDB
Ian Bird LCG Project Leader Summary of EGI workshop.
Hall D Computing Facilities Ian Bird 16 March 2001.
LHC collisions rate: Hz New PHYSICS rate: Hz Event selection: 1 in 10,000,000,000,000 Signal/Noise: Raw Data volumes produced.
Ian Bird, CERN WLCG Project Leader Amsterdam, 24 th January 2012.
Evolution of storage and data management
HEP LTDP Use Case & EOSC Pilot
Ian Bird WLCG Workshop San Francisco, 8th October 2016
EGEE Middleware Activities Overview
Computing models, facilities, distributed computing
for the Offline and Computing groups
WLCG: TDR for HL-LHC Ian Bird LHCC Referees’ meting CERN, 9th May 2017.
LHCb Software & Computing Status
Strategy document for LHCC – Run 4
Cloud Computing R&D Proposal
The latest developments in preparations of the LHC community for the computing challenges of the High Luminosity LHC Dagmar Adamova (NPI AS CR Prague/Rez)
New strategies of the LHC experiments to meet
Input on Sustainability
What does DPHEP do? DPHEP has become a Collaboration with signatures from the main HEP laboratories and some funding agencies worldwide. It has established.
LHC plans for LS2 and beyond
Presentation transcript:

Ian Bird GDB; CERN, 8 th May 2013 March 6, 2013

Background Requested by the LHCC in December: need to see updated computing models before Run 2 starts A single document to: - Describe changes since the original TDRs (2005) in Assumptions, models, technology, etc. - Emphasise what is being done to adapt to new technologies, to improve efficiency, to be able to adapt to new architectures, etc. - Describe work that still needs to be done - Use common formats, tables, assumptions, etc 1 document rather than 5 March 6, 2013

Timescales Document should describe the period from LS1 – LS2 - Estimates of evolving resource needs In order to prepare for 2015, a good draft needs to be available in time for the Autumn 2013 RRB, so needs to be discussed at the LHCC in September:  Solid draft by end of summer 2013 (!) March 6, 2013

Opportunities This document gives a framework to: - Describe significant changes and improvements already made - Stress commonalities between experiments – and drive strongly in that direction Significant willingness to do this Describe the models in a common way – calling out differences - Make a statement about the needs of WLCG in the next 5 years (technical, infrastructure, resources) - Potentially review the organisational structure of the collaboration - Review the implementation: scale, quality of service of sites/Tiers; archiving vs processing vs analysis activities - Raise concerns: E.g. staffing issues; missing skills; March 6, 2013

Draft ToC Preamble/introduction Resource needs and expected evolution Technology review and outlook -  Bernd Challenges – the problem being addressed - Consequences for computing Experiment computing models -  Marco Distributed computing -  Ian Computing services -  Ian Software activities and strategies -  Federico Collaboration organisation and management March 6, 2013

Challenges What problem are we addressing? - Need to make the best use possible of available resources - Major investment in software needed But missing skills, people, tools, infrastructure? - Need for flexibility in adapting the models to changing technologies - … March 6, 2013

Resource Needs & Evolution 1) Basic assumptions: - Assumptions on running conditions - Desirable physics (trigger thresholds, rates, etc.) - Event parameters 2) Likely technology evolution Summary tables of resource requirements - Tape, disk, cpu, bandwidths /19 This is hard and probably not reliable, but can make extrapolations and assumptions based on history since 2005, and likely budget scenarios March 6, 2013

April 22, 2013 CPU: -Constant increase of 350 k HS06/yr -20%/year growth from 2012 Disk: -Constant increase of 35 PB/yr -15%/year growth from 2012 Purple: linear extrapolation of what we actually did ~best guess of what can be afforded? Blue: x%/yr growth starting in 2012 to reach 2015 need << what we can afford, << Moore’s law

Collaboration Organisation & Management Opportunity to review the WLCG organisational structure and associated bodies Stress the need for building collaborative activities – in order to find the effort for needed developments, operations, etc. Describe the anticipated interactions with e- infrastructures (EGI/Horizon 2020, OSG, etc) Interaction with other HEP experiments – i.e. should the scope of WLCG broaden to support HEP more widely? March 6, 2013