Doc.: IEEE 802.11-09/0111r0 Submission January 2009 Hitoshi MORIOKA, ROOT Inc.Slide 1 Broadband V2I Access for High Speed Transportation Notice: This document.

Slides:



Advertisements
Similar presentations
Doc.: IEEE /90r0 Submission Nov., 2012 NICTSlide b NICT Proposal IEEE P Wireless RANs Date: Authors: Notice: This document.
Advertisements

Doc.: IEEE /0930r0 Submission July 2006 Nancy Cam-Winget, Cisco Slide 1 Editor Updates since Jacksonville Notice: This document has been prepared.
Doc.: IEEE /0094r0 Submission November 2009 Steve Shellhammer, QualcommSlide 1 Comments on PAR Notice: This document has been prepared.
Doc.: IEEE /0111r3 Submission Jul 2009 Hitoshi MORIOKA, ROOT Inc.Slide 1 Broadband V2I Access for High Speed Transportation Notice: This document.
Doc.: IEEE /1020r0 Submission September 2008 Hitoshi MORIOKA, ROOT Inc.Slide 1 WLAN field trial in high speed moving environment Notice: This.
Doc.: IEEE /1000r0 Submission Sep 2009 Hitoshi MORIOKA, ROOT Inc.Slide 1 IEEE for high speed mobility Notice: This document has been prepared.
Doc.: IEEE /0111r2 Submission May 2009 Hitoshi MORIOKA, ROOT Inc.Slide 1 Broadband V2I Access for High Speed Transportation Notice: This document.
Doc.: IEEE /2237r0 Submission July 2007 Emily Qi, Intel CorporationSlide 1 TGv Redline D1.0 Insert and Deletion Notice: This document has been.
Doc.: IEEE /1212r0 Submission TGT and MEF Liaison Notice: This document has been prepared to assist IEEE It is offered as a basis for.
Doc.: IEEE /86r2 Submission March, 2010 Gabor BajkoSlide 1 Location Proxy Notice: This document has been prepared to assist IEEE It is.
Doc.: IEEE /0028r0 Submission January 2005 Eleanor Hepworth, Siemens Roke ManorSlide 1 Definitions and Terminology Notice: This document has been.
Doc.: IEEE /1528r0 Submission 22 September 2006 Naveen Kakani, Nokia, IncSlide 1 TGn PSMP adhoc Group September Closing Report Notice: This document.
Doc.: IEEE /0136r0 Submission January 2007 Dave Stephenson, Cisco Systems, Inc.Slide 1 Input to Information Model Date: Notice:
Doc.: IEEE /0652r1 Submission May 2007 Emily Qi, Intel CorporationSlide 1 TGv Redline D0.12 Insert and Deletion Notice: This document has been.
LB84 General AdHoc Group Sept. Closing TGn Motions
LB84 General AdHoc Group Sept. Closing TGn Motions
[ Interim Meetings 2006] Date: Authors: July 2005
Motions Date: Authors: January 2006
IEEE White Space Radio Contribution Title
London TGu Motions Authors: January 2007 Date: Month Year
LB73 Noise and Location Categories
LB73 Noise and Location Categories
Waveform Generator Source Code
TGu Closing Report Date: Authors: November 2005
March 2014 Election Results
TGp Closing Report Date: Authors: July 2007 Month Year
Attendance and Documentation for the March 2007 Plenary
3GPP Extended Date: Authors: July 2005 July 2005
[ Policies and Procedure Summary]
Motion to accept Draft p 2.0
3GPP liaison report July 2006
[place presentation subject title text here]
Motions Date: Authors: January 2006
(Presentation name) For (Name of group) (Presenter’s name,title)
TGp Motions Date: Authors: November 2005 Month Year
TGp Closing Report Date: Authors: March 2006 Month Year
Emergency Call Motion Date: Authors: January 2006
On Coexistence Mechanisms
TGu-changes-from-d0-02-to-d0-03
TGp Closing Report Date: Authors: May 2007 Month Year
On Coexistence Mechanisms
TGp Closing Report Date: Authors: March 2006 Month Year
Reflector Tutorial Date: Authors: July 2006 Month Year
TGv Redline D0.07 Insert and Deletion
TGv Redline D0.06 Insert and Deletion
Experimental DTV Sensor
ADS Study Group Mid-week Report
TGu-changes-from-d0-01-to-d0-02
LB73 Noise and Location Categories
TGy draft 2.0 with changebars from draft 1.0
TGv Redline D1.04-D1.0 Insert and Deletion
TGv Redline D0.10 Insert and Deletion
WNG Closing Report Date: Authors: January 2007 January 2007
WAPI Position Paper Sept 2005 Sept 2005 IEEE WG
Redline of draft P802.11w D2.2 Date: Authors:
TGr Proposed Draft Revision Notice
TGu-changes-from-d0-02-to-d0-03
[ Policies and Procedure Summary]
May 2005 CAPWAP AHC Closing Report
TGu Motions Date: Authors: May 2006 May 2006
Draft P802.11s D1.03 WordConversion
January Opening Report
TGu-changes-from-d0-04-to-d0-05
Transition Nowhere Date: Authors: Sept 2005 Sept 2005
TGu-changes-from-d0-03-to-d0-04
TGu Motions Date: Authors: May 2006 May 2006
WNG SC Closing Report Date: Authors: November 2005
WAPI Position Paper Sept 2005 Sept 2005 IEEE WG
TGr Proposed Draft Revision Notice
TGp Motions Date: Authors: January 2006 Month Year
Presentation transcript:

doc.: IEEE /0111r0 Submission January 2009 Hitoshi MORIOKA, ROOT Inc.Slide 1 Broadband V2I Access for High Speed Transportation Notice: This document has been prepared to assist IEEE It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE Patent Policy and Procedures: The contributor is familiar with the IEEE 802 Patent Policy and Procedures, including the statement "IEEE standards may include the known use of patent(s), including patent applications, provided the IEEE receives assurance from the patent holder or applicant with respect to patents essential for compliance with both mandatory and optional portions of the standard." Early disclosure to the Working Group of patent information that might be relevant to the standard is essential to reduce the possibility for delays in the development process and increase the likelihood that the draft publication will be approved for publication. Please notify the Chair as early as possible, in written or electronic form, if patented technology (or technology under patent application) might be incorporated into a draft standard being developed within the IEEE Working Group. If you have questions, contact the IEEE Patent Committee Administrator at. Date: Authors:

doc.: IEEE /0111r0 Submission January 2009 Hitoshi MORIOKA, ROOT Inc.Slide 2 Abstract We talk about WLAN broadband access for high speed transportation. –Motivation –Market –Requirement Handover Latency Case Study –Comparison with Existing IEEE Standards –Comparison with Other Standards –Straw Poll

doc.: IEEE /0111r0 Submission January 2009 Hitoshi MORIOKA, ROOT Inc.Slide 3 Motivation Many high speed trains (>200km/h) are already in operation in Europe and Asia. Developments of 10,000km of express railway tracks are estimated in next 20 years in the world. Train operators want broadband network between rail-side and train for such as train survey, passenger service and so on. And they want to operate the network by their own. Wi-Fi will meet their needs. (Equipments cost, Operation cost, Bandwidth…)

doc.: IEEE /0111r0 Submission January 2009 Hitoshi MORIOKA, ROOT Inc.Slide 4 Markets Train (Railway Transportation) Total extension of railway is approximately 1,350,000km in the world. –North America:278,000km –EU:236,000km –Russia:128,000km –East Asia:110,000km –Central/South America:110,000km Existing high speed train (> 200km/h operation) –22 systems in operation in 15 countries. Expected new high speed train –10,000km in next 20 years. Of cause, not only high speed train but also ordinary train can use this technology. NameCountryMax. Speed Shanghai Transrapid China430km/h Beijing-Tianjin HSCL China350km/h TGVFrance320km/h ICEGermany320km/h ShinkansenJapan300km/h AVESpain300km/h EurostarEU300km ThalysEU300km/h Treni Eurostar Italia Italy300km/h Taiwan HSRTaiwan300km/h KTXKorea300km/h Existing High Speed Train (> 300km/h)

doc.: IEEE /0111r0 Submission January 2009 Hitoshi MORIOKA, ROOT Inc.Slide 5 Expected Applications Hot-spot service for passengers. On board digital signage. Cabin monitoring. Backbone for femtocell. –Subway –Tunnel Internet

doc.: IEEE /0111r0 Submission January 2009 Hitoshi MORIOKA, ROOT Inc.Slide 6 Requirements Target Speed –TGV plans 360km/h operation. –TransRapid in Shanghai is operated in 430km/h. –JR-Maglev records 581km/h and JR plans to start service in –500km/h is enough? Scalability –Railway networks are so huge and many trains run on a network simultaneously. –So a train runs across many communication network. Security –Security is very important because private information will flow on networks. –For example, a train survey application will transfer a video which includes a passenger’s face and his lunch.

doc.: IEEE /0111r0 Submission January 2009 Hitoshi MORIOKA, ROOT Inc.Slide 7 Inter-Network Use Network A AP Network B AP Network C AP Network D Inter-Network Handover

doc.: IEEE /0111r0 Submission January 2009 Hitoshi MORIOKA, ROOT Inc.Slide 8 Inter-network Handover Latency 1.Discover a new AP. Latency can be reduced by 11k or multiple radio interfaces. 2.Association with new AP. (includes authentication/key exchange…) 11i authentication is NOT fast. It needs many packet exchanges. 3.Network layer setup.

doc.: IEEE /0111r0 Submission January 2009 Hitoshi MORIOKA, ROOT Inc.Slide 9 MAC Requirements Fast Association –Train must handover during passing overlap zone for seamless handover. –Handover latency impacts distance between APs. (= cost) Old APNew AP Overlap Zone

doc.: IEEE /0111r0 Submission January 2009 Hitoshi MORIOKA, ROOT Inc.Slide 10 Case Study Assumption –Maximum speed: 500km/h = 140m/s –Cell Radius: 200m –Route Length: 1,000km Old APNew AP Case1:Handover Latency = 100ms Minimum Overlap Zone length= 14m Distance between adjacent APs = 386m Number of APs = 2,591 14m 200m 386m

doc.: IEEE /0111r0 Submission January 2009 Hitoshi MORIOKA, ROOT Inc.Slide 11 Case Study (cont.) Old APNew AP Case2:Handover Latency = 500ms Minimum Overlap Zone distance= 70m Distance between adjacent APs = 330m Number of APs = 3031 (117% of Case 1) 140m 200m 260m Case3:Handover Latency = 1s Minimum Overlap Zone distance= 140m Distance between adjacent APs = 260m Number of APs = 3847 (148% of Case 1)

doc.: IEEE /0111r0 Submission January 2009 Hitoshi MORIOKA, ROOT Inc.Slide 12 Case Study (cont.) Old AP Case4:Handover Latency >1.43s Minimum Overlap Zone distance > 200m 200m New AP STA must begin new handover process before completing old handover process.

doc.: IEEE /0111r0 Submission January 2009 Hitoshi MORIOKA, ROOT Inc.Slide 13 Comparison with Existing IEEE Standards Standards Inter-Network Use Security Fast Roaming (Handover) IEEE802.11/a/b/g/n +IEEE802.11i +IEEE802.11r We need Approaches a.Fast authentication/key exchange. b.Inter-network fast roaming.

doc.: IEEE /0111r0 Submission January 2009 Hitoshi MORIOKA, ROOT Inc.Slide 14 PHY Compatibility Existing PHY can be used in high speed environment. (08/1020r1) So existing WLAN chipset can be used with some firmware and/or driver modification. LOW COST

doc.: IEEE /0111r0 Submission January 2009 Hitoshi MORIOKA, ROOT Inc.Slide 15 Comparison with Other Standards StandardsBandwidthEquipment CostOperation Cost 3G, 3.5G 14.4Mbps (Downlink) 11.5Mbps (Uplink) Very HighHigh LTE 100Mbps (Downlink) 50Mbps (Uplink) Very HighHigh WiMAX (IEEE802.16e) 21MbpsHighLow IEEE Mbps (11n MAC) Low

doc.: IEEE /0111r0 Submission January 2009 Hitoshi MORIOKA, ROOT Inc.Slide 16 Questions & Comments