Indiana High Value Research Tommy Nantung INDOT Research and Development.

Slides:



Advertisements
Similar presentations
DoD Logistics Human Capital Strategy (HCS) Executive Overview 1 October 2008.
Advertisements

Major Incident Process
Design and Construction Guidelines for Thermally Insulated Concrete Pavements Lev Khazanovich, UM John Harvey, UCD Joe Mahoney, UW September 12, 2007.
From… Maintenance Technical Advisory Guide (MTAG) Chapter 1 Introduction.
1 Luis Rodriguez, P.E. Federal Highway Administration Life Cycle Cost Analysis Virginia Concrete Conference March 6-7, 2014.
Update - Subcommittee on Bridges and Structures Kelley Rehm, PE July 2011.
ICPI Update SEPT Meeting May Segmental Pavement Sales Pavers, Permeable Pavers, Paving Slabs Millions of Square Meters.
EVOLVING DEMANDS Highway Usage Increased 29% in the 1990’s Truck Traffic Increased 40% in the 1990’s Truck Traffic Will Increase 3% per year in next 20.
Georgia Pavement Management System Development 1997 – 1998: l A quality-based on-site pavement condition evaluation system l A KBS for diagnosing the causes.
DUPAGE COUNTY MAYORS & MANAGERS TECHNICAL COMMITTEE MAY 24, 2012 LOMBARD, IL.
FAA/Asphalt Institute Airport Pavement Workshop October 18-20, 2011 Newport Beach, California The Benefit of Runway Grooving Hector Daiutolo 1.
Herriman City Engineering Department.  Herriman City has experienced tremendous growth over the last several years  Many new subdivisions and associated.
From… Maintenance Technical Advisory Guide (MTAG) Chapter 1 Introduction.
Reconstruction of the Eads Bridge Highway Deck
OPTIMIZATION Lecture 24. Optimization Uses sophisticated mathematical modeling techniques for the analysis Multi-step process Provides improved benefit.
Life Cycle Cost Analysis in Pavement Design - In Search of Better Investment Decisions - Office of Asset Management Federal Highway Administration Executive.
Presentation By: Chris Wade, P Eng. Finally … a best practice for selecting an engineering firm.
PAVEMENT MANAGEMENT SYSTEMS OVERVIEW Lecture 2. n Provide a historical perspective of the evolution of PMS over the last 20 years n Describe the basic.
Lesson-11 Information System Development
The Idea of a Virtual Drought The implementation of emergency plans can falter from lack of use Some emergency agencies require “a demonstration of plans”
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
PRIORITIZATION.
PCC Overlays of HMA Pavements
LPA – Utility Coordination Natalie Parks StructurePoint November 20, 2013.
Pavement Preservation Protecting the Investment and the Environment R. Gary Hicks CP2 Center, Chico, CA Prepared for CEAC 2014 Conference March 26-28,
Bridge Management New Bridge or Existing? New Design Conceptual Design Detailed Design Tender Preparation and Advertisement Construction Rehabilitation.
Intersection & Interchange Geometrics (IIG) Innovative Design Considerations for All Users Module 8 Intersection- Interchange Evaluation Process.
AASHTO SCOP Linking Planning to Programming P2P Link Rural Transportation Summit January 16, 2014 ADOT Vision and Long-Range Plan Planning to Programming.
1 Ministry of Transport, Public Works and Water Management.
Accelerating solutions for highway safety, renewal, reliability, and capacity SHRP 2 Outreach and Implementation AASHTO Technology Implementation Group.
Chapter 13: Developing and Implementing Effective Accounting Information Systems
NETWORK LEVEL EXAMPLES OF PMS İNŞ.YÜK. MÜH. VEYSEL ARLI.
PPTG2005 FORUM Shakir Shatnawi – Caltrans Chair Gary Hildebrand- Industry Chair George Bradley – Local Agency Chair Pavement Preservation Task Group.
Asset Management Strategies: Moving from costs to outcomes Tyrone Toole, ARRB Group Ltd South East Australian Transport Strategy Inc, Ordinary General.
Greening Government Operations Green Procurement Implementation Tools & Resources Canadian Public Procurement Forum October 1 st, 2007.
PennDOT’s Study of NCHRP Research Results Implementation TRB State Representatives & AASHTO National RAC Meetings July 27, Michael Bonini Transportation.
Chapter 3 Framework for Treatment Selection From… Maintenance Technical Advisory Guide (MTAG)
A Strategy for an Effective Accident Prevention Program
Irwin/McGraw-Hill Copyright © 2000 The McGraw-Hill Companies. All Rights reserved Whitten Bentley DittmanSYSTEMS ANALYSIS AND DESIGN METHODS5th Edition.
Session 2 Introduction to Pavement Preventive Maintenance Concepts.
Colorado Rural Electric Association 2009 Loss Control Conference NEAR MISSES REPORT/LEARN/USE Presented By: Eldon Humphers, CLCP-CUSA July 14, 2009.
Assessing the influence on processes when evolving the software architecture By Larsson S, Wall A, Wallin P Parul Patel.
LTPP Lessons Learned: Kansas SPS-2 July 17, 2013 Abilene, KS Gabe Cimini Database Manager, LTPP NRSC.
MICHIGAN EXPERIENCE WITH WARRANTY WORK. Warranty Program History Why Warranties ? Warranty Specifications Experience & Lessons Learned.
ODOT. Taking Care of What We Have. Asset Management, Life Cycle Analysis : A Three-Pronged Approach September 9th, 2015 Andrew Williams, Ohio DOT.
1 ROADS Services Training Group LOCAL AUTHORITY ROADS CONFERENCE 2014 Reforms, Challenges and Safety Treacys West County Hotel, Ennis, May 2014.
Caltrans Research Highlights Presented by The California Department of Transportation Tab 63.
Chapter © 2012 Pearson Education, Inc. Publishing as Prentice Hall.
Connected Vehicles Workforce FHWA Vehicle-to-Infrastructure
SESSION 9 Construction Considerations. Objectives  Describe key aspects of: Prepaving operations Paving operations Postpaving operations  Understand.
A Strategic Plan for Pavement Engineering NCHRP 20-7(223) AASHTO Joint Technical Committee on Pavements Dan Dawood, P.E. Pennsylvania Department of Transportation.
Unit-5 Introduction to IS/ISO 9004:2000 – quality management systems – guidelines for performance improvements. Presented by N.Vigneshwari.
Integrated Corridor Management Initiative ITS JPO Lead: Mike Freitas Technical Lead: John Harding, Office of Transportation Management.
Adult Learning Principles
CDER / Office of Compliance ACPS October 5, 2006 Joseph C. Famulare Acting Deputy Director Office of Compliance CDER / FDA.
Chapter © 2012 Pearson Education, Inc. Publishing as Prentice Hall.
Bridge Deck Overlay Projects 101 Presentation by Central Office Bridge Rehabilitation Group.
Chip Seal Best Practices by: Larry Galehouse, P.E., P.S., Director National Center for Pavement Preservation.
Design and Rehabilitation Strategies for Sustainable Concrete Pavements H. Thomas Yu Federal Highway Administration Office of Pavement Technology.
Identify the Risk of Not Doing BA
Blatnik Bridge Management Study
Life Cycle Cost Analysis
Across the entire value chain
Pavement Preservation
Ranking of Pavement Preservation Methods and Practices
Quality Assurance for Emulsified Asphalt Surface Treatments
Prime Factors for Successful Preservation Treatments
NRRA Pavement Workshop 2019
2019 Pavement Workshop May 21-23, 2019
K - Lead project October, 2015.
Presentation transcript:

Indiana High Value Research Tommy Nantung INDOT Research and Development

Treatment Guidelines for Pavement Preservation Objectives To provide treatment guidelines for the INDOT pavement preservation program To develop INDOT’s pavement distress identification manual, in order to provide consistent, precise, uniform decision- making regarding treatment type selection To develop training materials on the use of the distress identification manual and treatment guidelines in order to improve the skill level of the personnel involved in the P.P.P.

Treatment Guidelines for Pavement Preservation Problem Solved Synchronizing Program Between in-house maintenance activities and contract work performed as part of the district’s pavement program Assisting Districts The district level preservation treatment practices. Benefit/Production Manuals Helps to enhance the overall construction quality of INDOT treatments to their maximum benefit and efficiency. Training Materials To make one set of training materials suitable for Indiana.

Railroad Interconnect at Signalized Intersections Motivations Fox River Grove, IL October 25, 1995 Track Clearing Green Active 2-4 seconds Before Bus/Train Collision 7 Students Killed 24 injured 4

Railroad Interconnect at Signalized Intersections Objectives: A performance measure for determining the effectiveness of railroad preemption adjacent to signalized intersections to improve safety. Engage the traffic signal control vendors as partners in the process to facilitate implementation. Share findings with other agencies. Benefits Improved preemption strategies were implemented at an intersection that had occasional queuing problems (~2% of preempted cycles). In the nearly 1000 cycles observed, the performance measures demonstrated the problems had been eliminated.

Saw-Cut Guidelines for Concrete Pavements Objective: Reduce costs of replacing a cracked pavement or joint repair Reduce risk for raveling and cracking Provide guidance on when to saw-cut and how deep to saw cut to reduce the risk of micro-cracking and random cracking

Saw-Cut Guidelines for Concrete Pavements Simulations enable ‘what if’ scenarios – temperature, timing, humidity, depth Contractors get a better feel from ‘what ifs’ Maturity based rules versus rules of thumb Spec changes to reduce the potential for ‘chase cracking’

Improving the Design of U-Beams for Indiana Objectives Improve efficiency Optimize design Solutions Live load distribution Bridge deck design Shear strength Influence of debonding

Improving the Design of U-Beams for Indiana Benefits: More economical utilization of U-Beams Improved safety Improved understanding of shear strength and debonding Applicable to all prestressed girders

High Performance Concrete Bridge Decks Improve bridge deck performance Transverse crack control Shrinkage Permeability Problems Solved Low-shrinkage concrete Improved reinforcing details Significantly Improved Cracking Performance

High Performance Concrete Bridge Decks Reduced costs Maintenance (eliminate overlay in lifecycle) Deck replacement (extended by ~15 years) Increase lifespan Deck Structure

Road Safety Investigation Tools (RSIT) Goal: Improve effectiveness and efficiency of safety audits of existing roads Objectives: Identify the existing knowledge of effective safety countermeasures Develop a tool that helps apply the existing knowledge to safety audits

Road Safety Investigation Tools (RSIT) Benefits: Reduced time on safety audits Increased quality of the safety audit outcome RSIT-identified safety countermeasures RSIT-generated report with full documentation Learning opportunity for less experienced investigators