ASKAP Capabilities John Reynolds on behalf of the SEIC and ASKAP team.

Slides:



Advertisements
Similar presentations
SKAMP Square Kilometre Array Molonglo Prototype. Supporting Institutions  University of Sydney  Argus Technologies  ATNF  ICT Centre.
Advertisements

Paul Alexander DS3 & DS3-T3 SKADS Review 2006 DS3 The Network and its Output Data Paul Alexander.
Jeroen Stil Department of Physics & Astronomy University of Calgary Stacking of Radio Surveys.
ASKAP Status Update CSIRO ASTRONOMY AND SPACE SCIENCE David Brodrick EPICS [Spring] Collaboration Meeting 22nd October 2014.
Comparison of SKA Survey Speeds John D. Bunton, CSIRO TIP Figures of Merit SKA survey bandwidth can be large e.g. HI for redshifts up to 4. Thus it is.
Advances in Plasma Astrophysics, Giardini-Naxos, 6-10 Sept D Modeling of Solar Flaring Loops New Interactive Solar Flare Modeling and Advanced Radio.
Netherlands Institute for Radio Astronomy 1 ASTRON is part of the Netherlands Organisation for Scientific Research (NWO) From LOFAR design to SKA1 System.
ASKAP and DVP David DeBoer ASKAP Project Director 15 April 2010 Arlington, VA.
BDT Radio – 2b – CMV 2009/10/09 Basic Detection Techniques 2b (2009/10/09): Focal Plane Arrays Case study: WSRT System overview Receiver and.
The Future of the Past Harvard University Astronomy 218 Concluding Lecture, May 4, 2000.
Prototype SKA Technologies at Molonglo: 3. Beamformer and Correlator J.D. Bunton Telecommunications and Industrial Physics, CSIRO. Australia. Correlator.
Cylindrical Reflector SKA Update
The SKA Molonglo Prototype (SKAMP) Project SKA Meeting - April 2006 Anne Green.
Current mm interferometers Sébastien Muller Nordic ARC Onsala Space Observatory Sweden Turku Summer School – June 2009.
National Astronomy and Ionosphere Center © Germán Cortés M 2008 SKA TDP Antenna Optics By Germán Cortés M. Cornell University Ithaca NY 14853, USA National.
Name1 SKA(DS) System Design Aspects 4 th SKADS Workshop, Lisbon, 2-3 October 2008 SKA(DS) System Design Aspects: building a system Laurens Bakker.
ASKAP Early Science Workshop Lisa Harvey-Smith & Aidan Hotan | ASKAP Project Scientists August 5 th 2013 ASTRONONY & SPACE SCIENCE.
J.M. Wrobel - 25 June 2002 PROPOSALS 1 PROPOSAL WRITING TUTORIAL Outline 30 minutes: Lecture on Generic Issues 60 minutes: Small Groups Write Proposals.
C. ChandlerEVLA Advisory Committee Meeting September 6-7, Scientific Commissioning Plan Claire Chandler.
Dale E. Gary Professor, Physics, Center for Solar-Terrestrial Research New Jersey Institute of Technology 1 03/15/2012Preliminary Design Review.
Backend electronics for radioastronomy G. Comoretto.
ASKAP Signal Processing Overview DIFX Users and Developers Meeting
EVLA Early Science: Shared Risk Observing EVLA Advisory Committee Meeting, March 19-20, 2009 Claire Chandler Deputy AD for Science, NM Ops.
Phased Array Feeds John O’Sullivan SKANZ 2012 CSIRO Astronomy and Space Science,
Stability of Maximum S/N Beams CSIRO ASTRONOMY AND SPACE SCIENCE Aidan Hotan | ASKAP Deputy Project Scientist 4 th March 2014 SKA Workshop on Calibration.
Road to MeerKAT KAT-7 DBE Alan Langman. meerKAT Overview Objectives of meerKAT Location Location Location MeerKAT Engineering Specification Prototypes.
10 January 2006AAS EVLA Town Hall Meeting1 The EVLA: A North American Partnership The EVLA Project on the Web
Molecular Gas and Dust in SMGs in COSMOS Left panel is the COSMOS field with overlays of single-dish mm surveys. Right panel is a 0.3 sq degree map at.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array New VLBA capabilities.
Paul Alexander & Jaap BregmanProcessing challenge SKADS Wide-field workshop SKA Data Flow and Processing – a key SKA design driver Paul Alexander and Jaap.
XNTD/SKAMP/LFD Correlator 4th RadioNet Engineering Forum Workshop Next Generation Correlators for Radio Astronomy and Geodesy June 2006, Groningen,
The BEST-2 SKA pathfinder is composed by 32 receivers. The front ends are installed on the focal lines of 8 cylinders, offering a collecting area of about.
Correlator Growth Path EVLA Advisory Committee Meeting, March 19-20, 2009 Michael P. Rupen Project Scientist for WIDAR.
JVLA capabilities to be offered for semester 2013A Claire Chandler.
© ASTRON On the Fly LOFAR Station Correlator André W. Gunst.
Integrated receivers for mid-band SKA Suzy Jackson Engineer, Australia Telescope National Facility SKADS FP6 Meeting – Chateau de Limelette – 4-6 November,
Australian Astronomy MNRF Development of Monolithic Microwave Integrated Circuits (MMIC) ATCA Broadband Backend (CABB)
GALFA Software Group GALFA-HI –Narrow-band spectral line data cubes of HI emission GALFA-RRL –Narrow-bad spectral line data cubes of recombination lines.
An FX software correlator for VLBI Adam Deller Swinburne University Australia Telescope National Facility (ATNF)
ALMA Science WorkshopMay 14, 2004 Present and Future Thomas W. Folkers Arizona Radio Observatory.
Murchison Widefield Array (MWA) : Design and Status Divya Oberoi, Lenoid Benkevitch MIT Haystack Observatory doberoi, On behalf.
Large Area Surveys - I Large area surveys can answer fundamental questions about the distribution of gas in galaxy clusters, how gas cycles in and out.
ASKAP: Setting the scene Max Voronkov ASKAP Computing 23 rd August 2010.
Australian SKA Pathfinder (ASKAP) David R DeBoer ATNF Assistant Director ASKAP Theme Leader 06 November 2007.
ASKAP Update David DeBoer ASKAP Project Director 26 May 2010.
The Allen Telescope Array Douglas Bock Radio Astronomy Laboratory University of California, Berkeley Socorro, August 23, 2001.
Review of developments in Australasia and mainland Asia Steven Tingay Swinburne University of Technology Next Generation correlator meeting, JIVE 27 -
A real-time software backend for the GMRT : towards hybrid backends CASPER meeting Capetown 30th September 2009 Collaborators : Jayanta Roy (NCRA) Yashwant.
EURO-VO: GRID and VO Lofar Information System Design OmegaCEN Kapteyn Institute TARGET- Computing Center University Groningen Garching, 10 April 2008 Lofar.
ATCA GPU Correlator Strawman Design ASTRONOMY AND SPACE SCIENCE Chris Phillips | LBA Lead Scientist 17 November 2015.
Engineering Commissioning May 2016 SKA1 LOW – Assembly, Integration & Verification Adam MacLeod AIV Consortium Manager & ASKAP System Engineer.
Netherlands Institute for Radio Astronomy 1 APERTIF beamformer and correlator requirements Laurens Bakker.
Obtaining e-MERLIN Data For Use With NRAO Legacy Projects Tom Muxlow May 17 th 2006.
SAGE meeting Socorro, May 22-23, 2007 WIDAR Correlator Overview Michael P. Rupen Project Scientist for WIDAR & Software.
Multi-beaming & Wide Field Surveys
The CSIRO ASKAP Science Data Archive Progress and Plans
ASKAP High Time Res Capabilities
Phased Array Feeds SKANZ 2012 John O’Sullivan
EVLA Availability - or - When Can I Use It?
Phased Array Feeds Wim van Cappellen
MPIfR Results from the A. Chippendale ATUC, 14 Nov 2016
Pulsar Timing with ASKAP Simon Johnston ATNF, CSIRO
Wide Field Astronomy with ASKAP
Rick Perley National Radio Astronomy Observatory
Shared Risk Observing Claire Chandler EVLA SSS Review, June 5, 2009
Technical Foundations & Enabling Technologies – DS4
Some Illustrative Use Cases
Prototype Correlator Testing
Correlator Growth Path
EVLA Construction Status
Presentation transcript:

ASKAP Capabilities John Reynolds on behalf of the SEIC and ASKAP team

CSIRO. ASKAP Capabilities14 May 2009 Design and construction well underway – many capabilities set To ensure highest priority science is delivered fluidity is retained Announcement of Opportunity, Oct 2008 Proposals due in mid-June 2009, evaluation by Aug 2009 Crystallisation thereafter towards BETR (2010), ASKAP (2013) ASKAP Capability life-cycle

CSIRO. ASKAP Capabilities14 May 2009 “Mode 1” capabilities already defined Matching anticipated survey requirements Continuum imaging Standard spectral line imaging Slow transients Post-commissioning Advanced imaging modes (e.g. postage stamps) “Zoom” (high spectral resolution) modes VLBI & other “fast transients” Rollout

CSIRO. ASKAP Capabilities14 May 2009 Original capabilities, EoI

CSIRO. ASKAP Capabilities14 May 2009 ASKAP Sensitivity (EoI)

CSIRO. ASKAP Capabilities14 May 2009 Basics 36 antennas (configuration by Gupta, Johnston, Feain 2008) 32 beams/antenna 30deg 2 FOV up to ~1.5GHz 50K Tsys, 80% Aperture Efficiency 300MHz instantaneous BW, 20 kHz frequency resolution Frequency range 700 – 1800 MHz, tunable in 16 MHz steps Full polarization (auto/cross products on all beams) 5 second integration time in standard mode

CSIRO. ASKAP Capabilities14 May 2009 ASKAP antenna design 12m – prime focus, f/D = 0.5 Alt+Az+polarisation axes (Sky mount) Surface accuracy 1mm RMS (10 GHz) Slew speeds 3/1/3 degs/sec Acceleration 3/1/3 degs/sec/sec Settling time < 5 seconds

CSIRO. ASKAP Capabilities14 May 2009 Typical u-v histogram for deep image δ = -50º T=10h

CSIRO. ASKAP Capabilities14 May 2009 PAF design 188 elements in octagonal configuration 32 x 2 pol formed beams Independently steerable 30 square degrees up to ~1.5GHz Optimal disposition for tesselation not entirely clear Interlacing (“dithering”) may be required for flatness of field

CSIRO. ASKAP Capabilities14 May 2009 Preliminary design of ASKAP-sized array 11x10 minus some corner elements 188 active pairs

CSIRO. ASKAP Capabilities14 May channel FPA LNA Filtercard assembly

CSIRO. ASKAP Capabilities14 May 2009 FOV vs # beams Beams touching at the 3dB points Beams touching at the 3dB*0.92 points

CSIRO. ASKAP Capabilities14 May 2009 Overall ASKAP System Beamfomer and Fine filterbank Antenna1 192fibre connection Beamfomer and Fine filterbank Antenna2 192fibre connection A/D and Coarse Filterbank Antenna36 Beamfomer and Fine filterbank Antenna Analogue inputs 192fibre connection Correlator Band1 Correlator Band2 Correlator Band16 Tied Array Post processing (VLBI and Pulsars) To Computing Centre Central Site at MRO Cross connect between beamformers and correlator Represents a single Advanced TCA chassis All Identical To Computing Centre To Computing Centre To VLBI network or pulsar processors A/Ds located in Antenna Pedestal A/D and Coarse Filterbank Antenna Analogue inputs A/D and Coarse Filterbank Antenna Analogue inputs

CSIRO. ASKAP Capabilities14 May 2009 Mode 1 imaging capabilities Continuum 1 channel + spectral index/curvature OR 256 spectral channels Full Stokes parameters (IQUV) 4k x 4k pixels (2km array) or 12k x 12k (6km array) Real-time source cataloguing Spectral Line channels (df=18kHz) 2 Stokes (I, V) 4k x 4k pixels (2km array) Visibilities not archived Limited number of cubes per day Slow transients snapshots : 16-channel, 4k x 4k pixel, 2 Stokes searched every 5 seconds selected images retained

CSIRO. ASKAP Capabilities14 May 2009 Modes 2+ Advanced imaging Will be driven by Survey Science Project Design Study ( ) e.g. “postage stamps”, full 30dB polarization dynamic range “ Zoom” modes 16k channels in 4~8 sub-bands, 0.6kHz(*2 n ) resolution, e.g.; HI MHz + ( MHz) VLBI – 2~3 tied-array beam voltages, recorded off-site frequency standard (H-maser vs Rb) Fast transients diverse requirements vs fluid capabilities active community consultation happening now

CSIRO. ASKAP Capabilities14 May 2009 Fast Transients – capabilities Flexible correlator – access to; single-dish autocorrelations, tied-array Voltages or Power, visibilities (optionally averaging) formed-beam voltages flexible user-determined averaging, nStok, nBit … some on-board capacity for processing, buffering Constraints on-site space, power limits & costs bandwidth to Geraldton (40Gb/s initially, shared) calibration (requires processing engine) FPGA programming effort (+testing, commissioning)

CSIRO. ASKAP Capabilities14 May 2009 The end