R. HaywardEVLA Front-End CDR – EVLA Front-End Schedule 24 April 2006 1 EVLA Front-End CDR EVLA Front-End Schedule.

Slides:



Advertisements
Similar presentations
14-Jun-2004EVLA Software Design Review Transition Plan Bill Sahr 1 EVLA Hybrid Array & Transition Plan.
Advertisements

Keith MorrisEVLA Front-End CDR – New EVLA Receiver Card Cage April 24, EVLA Front-End CDR The New EVLA Receiver Card Cage.
Mark McKinnon EVLA Advisory Committee Meeting May 8-9, Budget, Schedule, Contingency Mark McKinnon Project Manager.
Lisa LockeEVLA Front-End CDR – S, X & Ku-Band Receivers April 24, EVLA Front-End CDR Plans for S (2-4), X (8-12) & Ku (12-18 GHz) Receiver Bands.
Bill SahrEVLA M&C Transition System Software CDR December 5-6, EVLA Monitor & Control Transition System Software Overview.
Bob Lill Undulator Systems – BPM April 20, 2006 Undulator Cavity BPM Status and Plans.
SDARS Receiver Front-End (Design Review)
GlueX Solenoid Update George Biallas May 12, 2010 GlueX Collaboration Meeting.
AuthorMeeting Title Date 1 EVLA Systems PDR Receivers/Feeds Daniel (Mert) MertelyEVLA System PDR:Receivers/Feeds 28 November, 2001.
Bob Hayward Receiver Engineer Feed & Front End PDR Feb Feed & Front End PDR Monitor & Control and Cryogenics.
Design Comparison Selection of OMT Design for the EVLA X-band Receiver Bob Hayward Senior Engineer.
Chuck KutzEVLA Front-End CDR – Low Frequency Receivers April 24, EVLA Front-End CDR EVLA Low Frequency Receiver Capability.
Mark Bowen Acting Theme Leader – Technologies for Radio Astronomy CSIRO Astronomy and Space Science 14 October 2010 Australia Telescope Users Committee.
COLD FRONT END Stephen Muchovej Caltech. CONSIDERATIONS RF System Itself Physical Considerations Packaging Mounting.
Systems Integration and Testing EVLA Advisory Committee Meeting, March 19-20, 2009 Jim Jackson Systems Engineer.
R. HaywardEVLA Feeds CDR - System Requirements 17 Feb EVLA Feeds CDR System Requirements.
SJDEVLA Advisory Committee Meeting September 6-7, EVLA Production and Maintenance Steven Durand presenting for the E lectronics Division.
LNA DC Bias Module Approach Block Diagram Schematic Program Plan
R. HaywardEVLA Front-End CDR - System Requirements 24 April EVLA Front-End CDR Overview & System Requirements.
Mark McKinnon NSF Mid-Project Review May 11-12, Budget, Schedule, Contingency Mark McKinnon Project Manager.
Paul HardenEVLA LO-IF CDR May 17, IF Subsystem Specs & Measured Test Data.
Upgrade of the VLBA C-Band Feed & Receiver Design Review Presented by S durand Designed by Bob Hayward and: Sivasankaran Srikanth (Feed Design) Hollis.
Jim RuffAntennas & Feeds PDR 2/12/02 1 Antennas & Feeds Mechanical Design Feed Cone Feed Mounting Horn Fabrication.
Jim RuffAntennas & Feeds CDR 2/17/05 1 EVLA Feed Cone Current Status Feed Circle Layout Structural Design Feed Mounting Feed Heaters Cost.
Project Overview and Status EVLA Advisory Committee Meeting, March 19-20, 2009 Mark McKinnon EVLA Project Manager.
K band History Science workshop determined efficiency improvements necessary for K Band: weather, observing requests, mapping programs. Only enough funds.
KFPA Noise Calibration Module and Coupler Eric W. Bryerton NRAO CDL (Charlottesville)
Wayne M. KoskiEVLA Front-End CDR – EVLA Receiver Monitor & Control April 24, EVLA Front-End CDR EVLA Receiver Monitor & Control F317 and F320 Modules.
Paul LilieFeed & Front End PDR-Solar Feb Feed & Front End PDR Solar Observing.
Peter NapierEVLA Correlator CoDR Nov 2, EVLA Correlator CoDR P. Napier Overall EVLA Project Plan.
Dan MertelyEVLA Front-End CDR – C-Band Receiver April 24, EVLA Front-End CDR C-Band (4-8 GHz) EVLA Receiver.
Long Term Transition Plan Gareth Hunt EVLA M&C PDR 2002 May 15.
Bob Hayward Receiver Engineer Feed & Front End PDR Feb Feed & Front End PDR Q, Ka, K, Ku & X-Band Receivers Backup Slides.
ASTRO-G project VSOP-2 – VLBI Space Observatory Programme times higher sensitivity. 10 times higher frequency observation 10 times higher resolution.
P. NapierEVLA Advisory Committee Meeting September 8-9, EVLA Advisory Committee Project Overview P. Napier, Project Manager Management, Schedule,
A Modular K-Band Focal Plane Array for the Green Bank Telescope Matt Morgan National Radio Astronomy Observatory 9/28/2007.
P.NapierEVLA Advisory Comm, 14 Dec 2004 Project Overview Peter Napier, EVLA Project Manager Status 2003 Committee Response.
Paul Harden VLA Veteran EVLA LO-IF PDR 22 January EVLA IF/LO EVLA “LOW BAND” CONVERTERS For 4/P/L/S/C and Ku Bands.
Author EVLA Feed & FE PDR 12/13 Feb, EVLA Receivers PDR (4m, P,) L, S, C BAND RECEIVERS Daniel (Mert) Mertely.
R. HaywardEVLA Feeds CDR – Feed Radomes 17 Feb EVLA Feeds CDR Feed Radomes.
Q, Ka, K, Ku & X-Band Receivers
K-Band Focal Plane Array Project Engineering Overview Matt Morgan National Radio Astronomy Observatory 2/27/2008.
R. HaywardEVLA Feeds CDR – Project Budget & Schedule 17 Feb EVLA Feeds CDR Project Schedule & Budget.
Rick PerleyEVLA Front-End CDR – On the Sky Tests April 24, EVLA Front-End CDR On the Sky Tests.
Chuck KutzEVLA Front-End CDR – LO/IF System April 24, EVLA Front-End CDR EVLA Front-Ends and the EVLA LO/IF System.
Bob Hayward Receiver Engineer Feed & Front End PDR Feb Feed & Front End PDR Hot Off the Press Q, Ka, K-Band Cost Savings.
Brent WilloughbyEVLA Front-End CDR – WVR Option 24 April EVLA Front-End CDR Water Vapor Radiometer Option.
K-Band Focal Plane Array Steven White Program Manager.
GBT Focal Plane Array K band 7 Pixel Steven White Program Manager.
P.NapierEVLA Advisory Committee, 10 June, EVLA ADVISORY COMMITTEE PROJECT OVERVIEW Scope Organization Schedule Budget, personnel.
Author Wayne M. Koski EVLA Monitor & Control Hardware CDR October 20, EVLA Monitor and Control Monitor & Control Transition.
EVLA Availability - or - When Can I Use It?
Redundancy Switching Components
EVLA Front-End CDR – EVLA Front-End Schedule
EVLA NSF Mid-Project Review System / Antenna Status
EVLA NSF Mid-Project Review System / Antenna Status
Obs2script Bryan Butler.
Terry Cotter LO/IF Group Leader
Budget, Schedule, Contingency
EVLA M/C Software PDR, 14 May 2002
EVLA Receivers PDR Transition Planning Author Daniel (Mert) Mertely
EVLA Front-End CDR – Solar Mode
EVLA Advisory Committee Meeting System Status
PDR Guidelines The purpose of the PDR of an EVLA Subsystem is principally to review 3 questions:   Are the top level performance requirements for the subsystem.
Charge to the Review Panel
Background Information P.Napier
EVLA Advisory Committee Meeting System Status
EVLA Construction Status
EVLA Advisory Panel Mtg. System Overview
System Specifications Lab Tests
Presentation transcript:

R. HaywardEVLA Front-End CDR – EVLA Front-End Schedule 24 April EVLA Front-End CDR EVLA Front-End Schedule

R. HaywardEVLA Front-End CDR – EVLA Front-End Schedule 24 April Overview Receiver Schedule –Core L, C, Transition-X, K, Ka, Q-Band Receivers –Future S, Ku, X-Band Receivers –Schedule by Band –Receiver Rate LNA Schedule –Antenna Schedule affect on K & Q-Band Tracking Receiver Construction Status Meeting the construction schedule

R. HaywardEVLA Front-End CDR – EVLA Front-End Schedule 24 April EVLA Receiver Top Level Schedule Chart

R. HaywardEVLA Front-End CDR – EVLA Front-End Schedule 24 April EVLA Receiver Annual Production Rate

R. HaywardEVLA Front-End CDR – EVLA Front-End Schedule 24 April EVLA Receiver Schedule By Band

R. HaywardEVLA Front-End CDR – EVLA Front-End Schedule 24 April LNA Forecast for EVLA Rx’s

R. HaywardEVLA Front-End CDR – EVLA Front-End Schedule 24 April EVLA Amplifier Annual Production Rate

R. HaywardEVLA Front-End CDR – EVLA Front-End Schedule 24 April Completed Antennas Front-End Interim Systems Antenna S/N LSCXKuKKaQ 14 L#32(i) 15 Dec 2004 To be replaced by new 1-2 GHz EVLA Rx - C#01(i) 27 Jan 2005 To be upgraded with new EVLA Card Cage, AC Box,4-8 GHz Polarizer & LNA’s X#01(t) 17 Nov K#28(i) 15 Dec 2004 To be upgraded with new EVLA Card Cage - Q#30(i) 15 Mar 2005 To be upgraded with new EVLA Card Cage & new LCP LNA 16 L#01(i) 5 May 2005 To be replaced by new 1-2 GHz EVLA Rx - C#03(i) 24 Nov 2005 To be upgraded with new 4-8 GHz Polarizer & LNA’s Revised AC Box X#35(t) 5 Mar K#22(i) 5 May 2005 To be upgraded with new EVLA Card Cage - Q#31(i) 16 Nov 2005 To be upgraded with new EVLA Card Cage 13 L#02(i) 27 April 2004 To be replaced by new 1-2 GHz EVLA Rx - C#02(i) 8 Dec 2005 To be upgraded with new EVLA Card Cage, 4-8 GHz Polarizer & 4-8 GHz LNA’s Revised AC Box X#29(t) 27 Aug K#27(i) 11 Feb 2004 To be upgraded with new EVLA Card Cage - Q#17(i) 22 Feb 2006 To be upgraded with new EVLA Card Cage Completed Planned Task Interim Receiver Transition Receiver EVLA Compliant Receiver Receiver to be added at a Later Date

R. HaywardEVLA Front-End CDR – EVLA Front-End Schedule 24 April Antennas Being Outfitted Front-Ends Underway Antenna S/N LSCXKuKKaQ 18 L#21(i) 29 Mar 2006 To be replaced by new 1-2 GHz EVLA Rx - C#05(i) 28 April 2006 To be upgraded with new 4-8 GHz Polarizer X#02(t) 10 Nov K#10(i) 10 Nov 2005 To be upgraded with new EVLA Card Cage - Q#14(i) 28 April 2006 To be upgraded with new EVLA Card Cage New Rx Everett & Lisa: - Cold Plate - Thermal Gap - Build Dewar - VLBA Polarizr - Build RF Box - Card Cage - AC Box - Internal Cables SOIDA Test - Leak Test - Install on Ant - Tcals to Ops - Documentation Rx from Ant 18 Everett & Bob: - Upgrade LNAs - Bias Harness - Fab QPAM’s - Mount QPAM - New W/G Iso’s - DC Blocks - New Iso’s SOIDA Test - Leak Test - Install on Ant - Tcals to Ops - Documentation Completed Planned Task Interim Receiver Transition Receiver EVLA Compliant Receiver Receiver to be added at a Later Date

R. HaywardEVLA Front-End CDR – EVLA Front-End Schedule 24 April Future Antennas Near-Term Front-Ends Antenna S/N LSCXKuKKaQ 24 L#11(i) 17 May 2006 To be replaced by new 1-2 GHz EVLA Rx - C#04(i) 17 May 2006 To be upgraded with new 4-8 GHz Polarizer X#16(t) 17 May K#29 17 May 2006 To be upgraded with new EVLA Card Cage - Q#08(i) 26 May 2006 To be upgraded with new EVLA Card Cage Dan & Bob: - New Window ? - Saddlebag fab - Install LNA’s - Diode Card - Bias Harness - Phase Balance - Install Hybrid SOIDA Test - Leak Test - Install on Ant - Tcals to Ops - Documentation New Rx Everett & Lisa: - Cold Plate - Thermal Gap - Build Dewar - VLBA Polarizer - Build RF Box - Card Cage - AC Box - Internal Cables SOIDA Test - Leak Test - Install on Ant - Tcals to Ops - Documentation Rx from Ant 13 Dave: - SOIDA Test Leak Test - install on Ant - Tcals to Ops - Documentation Rx from Ant 23 Brent: - Mod RF/IF Box SOIDA Test - Leak Test - Install on Ant - Tcals to Ops - Documentation Spare Rx Dan & Bob: - Fab QPAM’s - Upgrade LNA’s - Bias Harness - Mount QPAM’s - New W/G Iso’s - New DC Blocks - New Coax Iso’s SOIDA Test - Leak Test - Install on Ant - Tcals to Ops - Documentation Completed Planned Task Interim Receiver Transition Receiver EVLA Compliant Receiver Receiver to be added at a Later Date

R. HaywardEVLA Front-End CDR – EVLA Front-End Schedule 24 April Future Antennas Longer-Term Front-Ends Antenna S/N LSCXKuKKaQ 23 L#??(i) 28 June 2006 To be replaced by new 1-2 GHz EVLA Rx - C#05(i) 28 June 2006 To be upgraded with new 4-8 GHz Polarizer X#28(t) 28 June K#11 28 June 2006 EVLA Compliant - Q#?? 28 June 2006 EVLA Compliant Rx from Ant ? Dan & Bob: New Window ? - Install LNA’s - Diode Card - Bias Harness - Phase Balance - Install Hybrid - SOIDA Test - Leak Test - Install on Ant - Tcals to Ops - Documentation New Rx Everett & Lisa: Cold Plate - Thermal Gap - Build Dewar - VLBA Polarizer - Build RF Box - Card Cage - AC Box - Internal Cables - SOIDA Test - Leak Test - Install on Ant - Tcals to Ops - Documentation Rx from Ant ? Dave: SOIDA Test - Leak Test - install on Ant - Tcals to Ops - Documentation Rx from Ant 24 Brent: New LNA’s? - Bias Harness - Mod RF/IF Box - New Top Plate - New Feed Sect - Eval RF Tree ? - Longer Legs - New Card Cage - AC Box - Internal Cables - Serial EPROM - SOIDA Test - Leak Test - Install on Ant - Tcals to Ops - Documentation Rx from Ant ? Dan & Bob: Upgrade LNAs? - Bias Harness ? - Fab QPAM’s - Mount QPAM’s - New W/G Iso’s - New DC Blocks - New Coax Iso’s - Longer Legs - New LO Plate - New Card Cage - AC Box - Internal Cables - Mount VR Box - Serial EPROM - SOIDA Test - Leak Test - Install on Ant - Tcals to Ops - Documentation

R. HaywardEVLA Front-End CDR – EVLA Front-End Schedule 24 April Conclusions - 1 At the peak, we will have to build close to 40 receivers per year. Some receivers are easier than others: Transition X-Band merely needs SOIDA testing Upgraded K & Q-Band are simpler than building a new receiver Past history – max production: 6 x K-Bands + 6 x Q-Bands + 3 x W-Bands For a total of 15 receivers in one year (2000) Essentially 3 techs + 1 engineer For EVLA, we have 8 techs + 3 engineers thru to the end of Project

R. HaywardEVLA Front-End CDR – EVLA Front-End Schedule 24 April Conclusions - 2 Will also optimize staff effort by: Designing receiver sub-systems which are compatible with mass production concepts Maximizing outsource options Ensuring machined parts are available when needed by utilizing external machine shops Using production-line techniques for new Rx’s (Ka, S, Ku & X-Band) Also expect less & less maintenance required on old VLA modules as more old VLA A & F-Racks retired LO modules (F3 & F12) & IF modules (F4, F6 & F9’s) On EVLA, LO & IF converters are the responsibility of the LO/IF Group At some point soon, will have enough spares that old VLA FE modules will never have to be repaired ever again This will free up extra manpower (although we’ll obviously have more & more receivers that can break and need to be repaired)

R. HaywardEVLA Front-End CDR – EVLA Front-End Schedule 24 April Conclusions - 3 Once we get over the initial startup problems, we have a good chance of meeting the production schedule Worst case scenario –As long as we have purchased all of the components & hardware up front, the Rx’s can be built using Operations staff after the EVLA Project funding ends (beyond 2012) Ops staff built most of the K & Q-Band receivers on the VLA and all of the W-Band receivers on the VLBA But it would certainly take longer than desirable –Obviously less impact if it is the X-Band build that is deferred (since we already have a scientifically useful narrowband Transition X-Band system)

R. HaywardEVLA Front-End CDR – EVLA Front-End Schedule 24 April Questions ?