Office of Energy Projects 1 FERC Update Robert J. Cupina Deputy Director Office of Energy Projects Federal Energy Regulatory Commission Wyoming Infrastructure.

Slides:



Advertisements
Similar presentations
Reliability in British Columbia
Advertisements

Office of Energy Projects 1 FERC and Transmission Siting Robert J. Cupina Deputy Director Office of Energy Projects Federal Energy Regulatory Commission.
Structuring and Implementing a Truly International ERO Kevin Kelly Director, Policy Analysis and Rulemaking Office of Markets, Tariffs and Rates Federal.
Donald Mason, Esq. Commissioner Emeritus and former Chair of NARUC Gas Committee Atlanta, November, 2010.
Cove Point On The One-yard Line WVONGA Fall Meeting September 11, 2013.
FERC 1 APGA Annual Conference Halifax, Nova Scotia FERC Priorities in an Evolving Natural Gas Market Suedeen G. Kelly Commissioner, FERC August 2, 2005.
All Things Natural Gas Infrastructure, Rates and Policy
Pat Wood, III, Chairman Federal Energy Regulatory Commission Energy Infrastructure Washington D.C. April 5, 2005.
What’s Up With Infrastructure? Interstate Pipeline Regulatory Committee Jeff Wright, Chief Energy Infrastructure Policy Group Office of Energy Projects.
Dena E. Wiggins February 16, 2015 National Association of Regulatory Utility Commissioners Winter Meeting CONNECTING THE DOTS: FROM THE WELLHEAD.
SEARUC 2003 Annual Meeting Pinehurst, North Carolina June 9, 2003 Pat Wood, III Federal Energy Regulatory Commission.
February 22, 2001 Alaskan Pipeline Meeting Agenda Introduction to Enron & El Paso Assessing the Alaskan Gas Impact Enron & El Paso Value Added.
LNG USA 2005 IQPC Houston, Texas November 9, 2005 Bruce F. Kiely Baker Botts L.L.P. Washington, D.C.
The FERC Review Process and Interaction with State Authorities Council of State Governments July 27, 2005 Office of Energy Projects Federal Energy Regulatory.
2004/05 Winter Energy Market Assessment November 18, 2004 Federal Energy Regulatory Commission Office of Market Oversight and Investigations Disclaimer:
Conference on Environmental Assessments in Federations A Montana Perspective September 14, 2009 Tom Livers, Deputy Director Montana Department of Environmental.
LNG PAT WOOD III Federal Energy Regulatory Commission December 17, 2003.
Federal Energy Regulatory Commission
FERC Office of Energy Projects 1 Federal Energy Regulatory Commission EPAct of 2005 Effect on Review of LNG Facilities & Working with FERC CSO Annual meeting.
Pivotal Development: Regions of Possibilities Dana Grams Senior Vice President, Pivotal Development.
KERN RIVER GAS TRANSMISSION COMPANY Wyoming Pipeline Authority Casper, Wyoming August 21, 2007 John Dushinske Vice President of Marketing & Regulatory.
NATURAL GAS ROUNDTABLE Commissioner Suedeen G. Kelly, FERC February 24, 2004 “Pending Natural Gas Issues”
DOE’s Implementation of EPACT’s Electricity Title and Related Provisions Larry Mansueti Office of Electricity Delivery and Energy Reliability U.S. Department.
Federal Energy Regulatory Commission GITA Seminar on: New Construction Project Lifecycle JW Marriott Houston, TX September 20, 2004 Lonnie Lister, Chief.
George Godding Director DMC Office of Market Oversight and Investigations Federal Energy Regulatory Commission USEA/USAID Energy Partnership Program Brasilia,
Eric J. Tomasi – Project Manager Division of Gas – Environment & Engineering Office of Energy Projects Federal Energy Regulatory Commission Northeast Energy.
1 Cheyenne Tuscola Lebanon Clarington Meeker Wamsutter Opal “Rockies Express Pipeline”
California Public Utilities Commission Regulation and Natural Gas Infrastructure Richard Myers CPUC Energy Division May 14, 2009.
Wyoming Pipeline Authority August 30, 2005 Gaylen Haag Business Development Questar Pipeline Company.
FERC and the Development of an Alaska Natural Gas Pipeline Robert J. Cupina, Deputy Director Office of Energy Projects Federal Energy Regulatory Commission.
Robert Cupina, Principal Deputy Director Office of Energy Projects Federal Energy Regulatory Commission Hot Button Issues and Priorities SGA Fall Leadership.
Commissioner Suedeen Kelly Federal Energy Regulatory Commission Energy Infrastructure in the West February 24, 2006.
Natural Gas Transmission Networks: So You Want To Build A Pipeline?
5/10/07 Pipeline CO2 Spec Columbia Gas1.25 ANR Pipeline2.00 Panhandle Eastern2.00 Texas Eastern3.00 Tennessee3.00 Rockies Express Northern Natural Another.
The Market Outlook for Natural Gas: The Wyoming Natural Gas Pipeline Authority’s Perspective Leadership Wyoming Class of 2005 Gillette, WY October 21,
The Market Outlook for Natural Gas: The Wyoming Natural Gas Pipeline Authority’s Perspective Wyoming Geological Association Conference Prepared: July 26,
Public Symposium on LNG Bowdoin College Brunswick, Maine Robert J. Cupina, Deputy Director Office of Energy Projects Federal Energy Regulatory Commission.
Regulatory Overview of LNG LSU Center for Energy Studies Energy Summit Baton Rouge, Louisiana October 20, 2005 Robert Cupina, Deputy Director, Office of.
Douglas A. Sipe Outreach Manager Outreach Manager Division of Gas-Environment and Engineering Federal Energy Regulatory Commission Office of Energy Projects.
Natural Gas Transmission Regulation in the US Jeff Wright, Chief Energy Infrastructure Policy Group Office of Energy Projects Federal Energy Regulatory.
Transmission Incentives P. Kumar Agarwal Acting Director, Division of Reliability & Engineering Services Federal Energy Regulatory Commission U.S. DOE,
Alaska Natural Gas Transportation System A North American Energy Solution Alaska Natural Gas Transportation System A North American Energy Solution November.
HYDROPOWER: A Comparative Energy Review J. Mark Robinson JMR Energy Infra, LLC NWHA February 23, 2011.
Intermountain West Production -- Getting Gas to Market Jim Cleary El Paso Western Pipelines IPAA Mid-Year Meeting June 14, 2004.
ALASKA NATURAL GAS SYMPOSIUM Regulatory Update J. Mark Robinson, Director Office of Energy Projects Federal Energy Regulatory Commission December 2, 2004.
Challenges in Transmission. 2 Environmental and Public Affairs Consulting for the Energy Industry Energy Sectors  Oil & Gas  Pipeline  Storage  LNG.
Wyoming Infrastructure Authority Developing Electric Infrastructure for the Future of the West Energy Gateway Update Presented by Darrell T. Gerrard Vice.
LNG: Regulatory and Regional Considerations The Energy Council’s LNG/CNG Workshop Biloxi, Mississippi April 8, 2005 Robert Cupina, Deputy Director, Office.
Wyoming Pipeline Authority Public Meeting January 15, 2008 A Spectra Energy Proposal.
Overview of WECC and Regulatory Structure
Wyoming Natural Gas Pipeline Authority Wyoming State Emergency Response Commission, January 20, 2006, Cheyenne, WY Presented by Colby Drechsel, Technical.
Douglas A. Sipe Outreach Manager Outreach Manager Division of Gas-Environment and Engineering Federal Energy Regulatory Commission Office of Energy Projects.
1 Federal Energy Regulatory Commission John M. Wood, Acting Director Division of Pipeline Certificates Office of Energy Projects FERC Update Florida Energy.
1 Casper Cheyenne Questar Wamsutter Pipeline Project Description Montana North Dakota South Dakota Nebraska Colorado Utah Wyoming Phase1 245 mile pipeline.
Major Changes in Natural Gas Transportation Capacity, 1998 – 2008 Next  The following presentation was prepared to illustrate graphically the areas of.
Entrega Project Update Wyoming Natural Gas Pipeline Authority – August 30, 2005 Entrega Gas Pipeline Inc.
The Market Outlook for Natural Gas: The Wyoming Natural Gas Pipeline Authority’s Perspective.
Bryan Hassler, Executive Director Society of Petroleum Engineers January 21, 2004 Rock Springs, WY.
FERC Office of Energy Projects 1 Richard Hoffmann, Director Division of Gas – Environment & Engineering Office of Energy Projects Policies Affecting.
Federal Energy Regulatory Commission FERC Information Assessment Team (FIAT) Implementation.
Security at FERC Energy Projects Energy Bar Association Mid-Year Meeting Robert J. Cupina, Deputy Director Office of Energy Projects Federal Energy Regulatory.
1 Is there LNG in California’s Future? “LNG: When East Meets West” Zeus Development Conference Long Beach, CA by David Maul Manager, Natural Gas Office.
Natural Resources Infrastructure Needs Colorado Oil and Gas Association Denver, CO August 9, 2006.
Landon Derentz Energy Policy Advisor Bureau of Energy Resources U.S. Department of State Shale Gas and Tight Oil Production in the United States 1.
Continuing Progress of LNG Terminals in the Gulf Coast Region
California Energy Commission 1 LNG Permitting and Environmental Review: the View from California DOE LNG Forum Los Angeles June 1, 2006 Kevin Kennedy,
California Energy Action Plan July 17, Energy Action Plan Natural Gas Actions Status Report David Maul California Energy Commission Staff And Richard.
Federal Energy Regulatory Commission 1 Overview of the Federal Energy Regulatory Commission (FERC) Roland W. Wentworth Office of Markets, Tariffs and Rates.
Regulatory Commission
Presentation transcript:

Office of Energy Projects 1 FERC Update Robert J. Cupina Deputy Director Office of Energy Projects Federal Energy Regulatory Commission Wyoming Infrastructure Authority Board Of Directors January 31, 2006

FERC Office of Energy Projects 2 FERC Helping Markets Work Adequate Infrastructure OEP Market Oversight OMOI Competitive Market FERC Effective Market Rules OEMR

FERC Office of Energy Projects 3 FERC’s Hydropower Projects Transmission Line Capacity kV kV ≥ 230kV

FERC Office of Energy Projects 4 FERC’s Hydro Transmission Lines Transmission Line Capacity Number of Transmission Lines ≥ 230 kV82 60 – 229 kV300 < 60 kV1216 5,800 miles of primary transmission line

FERC Office of Energy Projects 5 Source: Based on Platts PowerMap FERC certificates U.S. interstate natural gas pipelines

FERC Office of Energy Projects 6 Existing LNG Import Terminals LAKE CHARLES ENERGY BRIDGE ELBA ISLAND COVE POINT EVERETT

FERC Office of Energy Projects 7 Existing Gas Storage Facilities Source: Based on Platts PowerMap, October 2005.

FERC Office of Energy Projects 8 Siting Infrastructure: Lessons Learned Early staff involvement Proactively identity issues and alternative siting Develop advocates not adversaries Expertise to provide a sound record Recommendations based on technical analysis

FERC Office of Energy Projects 9 Energy Policy Act of 2005 EPAct 2005 provides for federal siting of interstate electric transmission facilities (§1221) by amending the FPA (§216) - Designation of National Interest Electric Transmission Corridors (§216(a)) - Construction Permit (§216(b)) - Coordination of Federal Authorizations for Transmission Facilities (§216(h))

FERC Office of Energy Projects 10 EPAct 2005 Electric Transmission Corridors Conduct study within one year of electric transmission congestion –Every three years thereafter Issue report based on study –Designate any geographic area that experiences congestion as a “National Interest Electric Transmission Corridor”

FERC Office of Energy Projects 11 EPAct 2005 Construction Permit FERC can authorize construction of transmission facilities in a corridor if: –A state has no authority to either site facilities or consider interstate benefits, or –A state, with authority to site, either does not act within one year or conditions approval such that there is either no reduction in congestion or is not economically feasible

FERC Office of Energy Projects 12 EPAct 2005 Construction Permit Application to be filed with FERC –Filing requirements to be issued Comments will be received Rights-of-way –Right of eminent domain –Acquired right-of-way used exclusively for electric transmission facilities Compensation

FERC Office of Energy Projects 13 EPAct 2005 Coordination of Federal Authorizations Lead agency for permit coordination and environmental review –Must issue regulations within 18 months –Must enter into an MOU with other agencies within one year –Provide a pre-filing mechanism All permit decisions and environmental reviews shall be completed within one year –Failure to act within deadlines may be appealed to the President DOE delegation to FERC likely

Major Pipeline Projects Certificated (MMcf/d) 2000 to Present 42.2 BCF/D Total 8,474 Miles Transco (204,236,323) Southern (336,330) Kern River (135,886) 6 North Baja (500) Tuscarora (96) Northwest (162,113) Kern River (282) TETCO (250) Northwest (224) NFS/DTI (150) Georgia Straits (96) SCG Pipeline (190) Northwest (191) East Tennessee (510) Tennessee (320) TETCO (197) Greenbrier (584) El Paso (230,320,620) WBI (80) ANR (194,750,210,220, 107,143,168) 17 TETCO (223) Cove Point (445) Ocean Express (842) 14 Cheyenne Plains (560,170) CIG (282,92) 14. CIG (85,133,118,105) 15. TransColorado (125,300) 16. WIC (120,116,675,350) 17. El Paso (140) 18. Rendezvous (300) 19. Entrega (1,500) 8 Calypso (832) Discovery (150) Transwestern (150,375) 5 Trunkline(1,500) Cheniere Sabine (2,600) Trunkline (200) Questar (272,102) 6 Petal (700,600) Horizon (380) GTN (207) Otay Mesa (110) Florida Gas (239,270) East Tennessee (170) 7 1. Algonquin (285) 2. Islander East (285) 3. Iroquois (230,85) 4. Columbia (135,270) 5. Algonquin (140) 6. Transcontinental (105) 7. Transcontinental (130) 8. Tennessee (200) 9. Maritimes (80,360) 10. Algonquin (301) 11. Tennessee (500) 12. Mill River (800) 8 Millenium (700) 9 10 Northern Border (544,130) Independence (916) Trans Union (430) Southern Trails (120) Gulfstream (1,130) 11 Guardian (750) Trailblazer (324) El Paso (502) Center Point (113) Vista del Sol (1,100) Golden Pass (2,000) San Patricio (1,000) Dominion South (200) Columbia (172) East Tennessee (86) Tennessee(400,200) Cheniere Corpus Christi (2,600) 14 FERC Office of Energy Projects

FERC Office of Energy Projects 15 Sources: NERC Summer and Winter Assessments, WECC Existing Generation and Significant Additions and Changes to System Facilities Reports and FERC’s Transmission Database Major Electric Transmission Lines 2000 to Present 345 kV 230 kV Transmission Projects DC Caldwell Ontario Clarksville Chamber Springs Road Mt. Enterprise Tenaska Lamar Holcomb Brownlee Oxbow Spurlock Tap of Stuart/ W H Zimmer Shoreham New Haven Harbor 345 kV 230 kV Transmission Projects 328 miles

FERC Office of Energy Projects 16 Related Proceedings Transmission Investment Pricing Reform –RM06-04 –NOPR Issued November 18, 2005 –Comments due January 11, comments filed –Final rule due in one year (August 2006) DOE’s National Interest Electric Transmission Corridor Study –NOI expected soon

FERC Office of Energy Projects 17 Issues for Electric Transmission Clear Regulatory Path Contract Commitment Pricing Incentives Market Response - Timing

FERC Office of Energy Projects 18 What Will Make This Work FERC staff involvement as early as possible Develop a pre-filing process Start with two points and work the route Voluntary agency enlistment Rational Siting Process –One federal lead agency, one record for decisions, one avenue of appeal