An Update on the Land Surface Imaging Virtual Constellation (LSI-VC) Thomas Cecere USGS SIT Workshop Agenda Item #6 CEOS Action 28-04 CEOS SIT Technical.

Slides:



Advertisements
Similar presentations
Makoto Kajii SIT Chair 2010 – th Annual Report on CEOS Implementation of the GEOSS Space Segment Agenda Item accomplishments and lessons.
Advertisements

Action Status Update Stephen Ward SIT-30 Agenda Item #2 30 th CEOS SIT Meeting CNES Headquarters, Paris, France 31 st March – 1 st April 2015 Committee.
CEOS SIT-28 Introduction of the Agenda, Overall Objectives, and Essential Business Topics Hampton, Virginia, USA March 12-14, 2013.
GEO Implementation Plan 2025 Barbara Ryan & Espen Volden GEO Secretariat SIT Workshop Agenda Item 15 CEOS SIT Technical Workshop CNES, Montpellier, France.
28 th CEOS Plenary Session Position Paper and Recommended Way Forward for the LSI-VC Thomas Cecere, USGS Jonathon Ross, GA CEOS Plenary, Agenda Item 19.
CEOS Strategy for Carbon Observations from Space – Report of Implementation Study Team Stephen Briggs ESA CEOS Plenary, Agenda Item 21 Tromsø, Norway
Slide: 1 CEOS SDCG-3 Meeting|Sydney, Australia| 7-9 February 2013 Space Data Coordination Group Land Surface Imaging Virtual Constellation Ake Rosenqvist,
CEO Team SEO SIT Technical Workshop 25 – Agenda #16 EUMETSAT 17 th to 18 th September 2015 Committee on Earth Observation Satellites CEOS in the future.
An Update on the Land Surface Imaging Virtual Constellation (LSI-VC) Thomas Cecere, USGS SIT-30 Agenda Item # 9 CEOS Action / VC th CEOS SIT.
Water Strategy Implementation Study Team Report Chu Ishida JAXA SIT Workshop Agenda Item # CEOS Action / Work Plan Reference CEOS SIT Technical Workshop.
WGISS Richard Moreno CNES SIT Workshop Agenda Item #7 WGISS working group CEOS SIT Technical Workshop EUMETSAT, Darmstadt, Germany 17 th -18 th September.
CEOS Priorities for 2013 Agenda 3 Kerry Ann Sawyer CEOS Executive Officer CEOS SIT-28 Meeting Hampton, Virginia, USA 12 March 2013.
Water Strategy Implementation Study Team Report Chu Ishida JAXA SIT Workshop Agenda 11 CEOS SIT Technical Workshop EUMETSAT, Darmstadt, Germany 17 th –
Slide: 1 CEOS SIT Technical Workshop |Caltech, Pasadena, California, USA| September 2013 CEOS Work Plan Section 6.1 G Dyke CEOS ad hoc Working Group.
Slide: 1 VC/WG Day Topic # 4 "Data management and data access"
Committee on Earth Observation Satellites Land Surface Imaging – VC (for endorsement) Plenary Agenda Item # th CEOS Plenary Kyoto International Conference.
WGISS Response to CEOS Actions Assigned to WGISS Richard Moreno CNES – WGISS chair WGISS-40 Harwell – United Kingdom 28 th September 2015 Committee on.
SIT Operations survey CNES SIT Workshop Agenda Item 26 CEOS SIT Technical Workshop EUMETSAT, Darmstadt, Germany 17 th – 18 th September 2015 Committee.
Land Surface Imaging VC: Terms of Reference Julio Dalge, P.G. Diwakar, John Faundeen INPE ISRO USGS CEOS SIT-28 Meeting Hampton, Virginia, USA March 12,
The International Ocean Colour Coordinating Group International Network for Sensor Inter- comparison and Uncertainty assessment for Ocean Color Radiometry.
Report on SBSTA-43 John Bates NOAA, National Centers for Environmental Information (NCEI) NOAA/NESDIS 6th Working Group on Climate Meeting.
Committee on Earth Observation Satellites CEO Team Plenary Agenda Item #4 29 th CEOS Plenary Kyoto International Conference Center Kyoto, Japan 5 – 6 November.
Incoming Themes for 2017 Frank Kelly, USGS
CEOS Response to GEOSS Water Strategy
Analysis Ready Data LSI-VC – Adam Lewis Co-chair
Committee on Earth Observation Satellites
Moderate Resolution Sensor Interoperability (MRI) Framework
Committee on Earth Observation Satellites
FDA in 2017 A CEOS Chair Theme
CEOS Status/Overview Steven Hosford WGCapD-7 Agenda Item #6
Committee on Earth Observation Satellites
CEOS Plenary 2018 Astrid – Christina Koch, European Commission
CEOS Chair 2018 priorities Mauro Facchini European Commission
Analysis ready data: definition document
CEOS Status/Overview Steven Hosford WGCV-43/WGISS-45 10th April 2018
Return to First Principles
Review of SIT Chair Outcomes
29th CEOS Plenary Priorities
Review of Key Actions from 28th Plenary and SIT-30
CEOS SIT Chair Priorities
Proposed 2019 CEOS chair initiative
Committee on Earth Observation Satellites
2016 Plenary Themes Alex Held, CSIRO
Strategy Implementation
Thomas Cecere & Jonathon Ross USGS and Geoscience Australia
Review of Chair Priorities
LSI-VC Work Plan Updates
Committee on Earth Observation Satellites
How do we get out of ‘reactive’ mode
Prepared at the Joint Meeting For SDCG for GFOI / GEOGLAM / LSI-VC
SIT Chair Priorities and SIT-33 Objectives
SESSION 2: GLOBAL DATA FLOWS STUDY
Plenary Decision Items
SIT Chair Introduction
LSI-VC User Requirements
Engagement with GEO Kerry Ann Sawyer, NOAA, CEOS SIT Chair Team
Implementation Update
WGCapD: Working Group on Capacity Building and Data Democracy
Observations for Forests
SIT-31 Sessions CEOS SIT Chair Team ESA/ESRIN, Frascati, Italy
SIT Chair Priorities and SIT-34 Objectives
VC Title Goes Here Name (s), Organization, CEOS Affiliation
WG Title Goes Here Name (s), Organization, CEOS Affiliation
Proposed Way Forward for LSI-VC, SDCG for GFOI, and GEOGLAM
A Broader CEOS ARD Strategy
Proposed Way Forward LSI-VC, SDCG for GFOI, and GEOGLAM
VC/WG/AHT Working Day Outcomes
Ad hoc Team (AHT) Lifecycles
CEOS Analysis Ready Data Strategy
CEOS Analysis Ready Data Strategy
Presentation transcript:

An Update on the Land Surface Imaging Virtual Constellation (LSI-VC) Thomas Cecere USGS SIT Workshop Agenda Item #6 CEOS Action CEOS SIT Technical Workshop EUMETSAT, Darmstadt, Germany 17 th -18 th September 2015

SIT Tech. Workshop 2015 EUMETSAT, Darmstadt, Germany 17 th -18 th September LSI-VC Terms of Reference – Mission Statement The Land Surface Imaging Virtual Constellation exists to maximize the value derived from CEOS agency land surface imaging assets and activities by providing an overarching coordination role. The responsibility of the LSI-VC is to facilitate coordinated and optimized land surface imaging contributions from CEOS agencies to enable access to fundamental measurement products in support of confirmed/validated requirements linked to adopted CEOS priorities. These priorities are typically derived from key stakeholders, such as UN agencies/programs and GEO.

SIT Tech. Workshop 2015 EUMETSAT, Darmstadt, Germany 17 th -18 th September The LSI-VC, led by Tom Cecere (USGS), to prepare a draft Implementation Plan, based on the "Space Segment Coordination" option and including a proposed update to the LSI-VC Terms of Reference, for review prior to, and discussion at, SIT-30. CEOS Action An LSI-VC Terms of Reference document was submitted for consideration at SIT-30 -A Discussion Paper with a notional phased implementation approach was also presented

SIT Tech. Workshop 2015 EUMETSAT, Darmstadt, Germany 17 th -18 th September SIT-30 through May 31, 2015 – socialized the elements of the implementation plan with CEOS Stakeholders (e.g. SEO, WGCV, WG Climate, WG Disasters, SDCG for GFOI, GEOGLAM, WGISS) and begin refining collaboratively. -June 30, 2015 – final draft of the LSI-VC implementation plan and revised Terms of Reference to the SIT Chair team for consideration. -September 15, 2015 – conducted a SIT Tech. Workshop side meeting to discuss work plan development and LSI-VC team logistics Summary of Actions since SIT-30

SIT Tech. Workshop 2015 EUMETSAT, Darmstadt, Germany 17 th -18 th September LSI-VC Terms of Reference – Implementation Horizon Revised 3-Year Horizon5-Year Horizon Space Segment Aggregate and analyze multiple sets of validated, domain-specific requirements to identify gaps and opportunities for optimization and improve interoperability and complementarity Optimize and harmonize CEOS Agency global data collections, as much as possible. Harmonize acquisition plans across major international land surface imaging programs to support validated domain-specific requirements Ground Segment and Information Systems Explore architectures for future distribution that would potentially enable the analysis of very large land surface imaging datasets, trialed across at least three nations/regions Stimulate an environment conducive to the creation of analysis-ready data to enhance usage and exploitation of the CEOS data portfolio for land surface imaging Establish the framework for an architecture network for analysis of very large land surface imaging data sets Products and Services Produce 1-2 compatible, non-domain-specific measurement products derived from one sensor and produced by multiple agency systems Produce 4-5 compatible, non- domain-specific measurement products derived from 3-4 sensors and produced by multiple agency systems

SIT Tech. Workshop 2015 EUMETSAT, Darmstadt, Germany 17 th -18 th September The LSI-VC Study Team and the evolving LSI-VC Team Yves Crevier Patrice Henry Astrid Koch Bianca Hoersch Jonathon Ross ** Takeo Tadono David Jarrett, Jeff Masek, Kim Holloway Tom Cecere, Jenn Lacey, Steve Labahn Kevin Gallo

SIT Tech. Workshop 2015 EUMETSAT, Darmstadt, Germany 17 th -18 th September LSI-VC Implementation Plan Framework - Considerations The desire to address ‘pressing issues’ of strategic concern to CEOS and CEOS Agencies. The need to work with the resources that agencies can realistically provide. The need to re-build momentum by implementing solutions that work, thereby encouraging additional CEOS agencies to buy-in and contribute. The desire, and need, to ensure strong linkages with other CEOS Entities. This builds on the linkages identified in the Terms of Reference.

SIT Tech. Workshop 2015 EUMETSAT, Darmstadt, Germany 17 th -18 th September LSI-VC Implementation Plan Framework – Proposed Focus Themes Optimizing and harmonizing where feasible global data collections (with an ever increasing volume expected). Promoting analysis-ready data (with the goal to minimize the need for the end user to understand satellite/pass/sensor-specific processing). Exploring how new approaches to management/analysis of large data structures (e.g. Data Cubes) can be implemented and sustained. Addressing the actions identified for LSI-VC by the CSIST, as a pathfinder to broader approaches to analyzing land surface imaging requirements.

SIT Tech. Workshop 2015 EUMETSAT, Darmstadt, Germany 17 th -18 th September LSI-VC Implementation Plan Framework – Phased Approach Three phases (over a 3 year period) where the outcome of each phase will lay the groundwork for each subsequent phase (and touch on the focus themes) Phase 1 – (assessing, identifying, scoping and defining) - Identify gaps/opportunities in acquisition planning in support of CEOS Carbon Strategy - Develop agreed definitions of intercomparable Analysis Ready Data (ARD) products in the context of land surface imaging - Engage with implementation of trial ‘data cubes’ - Assimilate and incorporate lessons learned from an SDCG for GFOI scoping study for global data flows for long time series land surface imaging data Phase 2 – ; involves pilot approaches and development of road maps (e.g. building toward an integrated set of ARD) Phase 3 – ; involves working toward implementation to meet or exceed the goals established in the 3 year horizon in the Terms of Reference

SIT Tech. Workshop 2015 EUMETSAT, Darmstadt, Germany 17 th -18 th September Accept, Request further Revision, or Reject the submitted update to the LSI-VC Terms of Reference -Accept, Request further Revision, or Reject the submitted LSI-VC Implementation Plan -Proceed with the recommendation for endorsement at CEOS Plenary 29 in Kyoto, Japan -If proceeding, request CEOS member agencies consider participating in the LSI-VC and provide a name to Tom Cecere and the SIT Chair Team by Friday, October 9. If any CEOS member agencies would consider serving as an LSI-VC co-lead, please also indicate by October 9. For Decision