Engine Nacelle Halon Replacement, FAA, WJ Hughes Technical Center Point of Contact :Doug Ingerson Department of Transportation Federal Aviation Administration.

Slides:



Advertisements
Similar presentations
CONTROLS OF SUPER CRITICAL BOILERS
Advertisements

Engine Nacelle Halon Replacement, FAA, WJ Hughes Technical Center
Engine Nacelle Halon Replacement, FAA, WJ Hughes Technical Center
BRIEF OVER VIEW OF THE MINIMUM PERFORMANCE STANDARD FOR ENGINES describes geometry for a fixture loosely representing an aircraft engine nacelle describes.
Engine Nacelle Halon Replacement, FAA, WJ Hughes Technical Center Point of Contact :Doug Ingerson Department of Transportation Federal Aviation Administration.
Point of Contact :Doug Ingerson Department of Transportation Federal Aviation Administration WJ Hughes Technical Center Fire Safety Branch, AAR-440 Bldg.
Recent Simulator Activity Baseline Testing –Fire testing performed during the first week of May 2000 –Agent testing performed during the third and fourth.
1 Simulator Status, FAA WJ Hughes Technical Center Completed since the April 1999, Seattle meeting : –Simulator Inlet : A 22 foot long, 22 inch diameter.
DEVELOPMENT OF A MINIMUM PERFORMANCE STANDARD FOR HAND HELD FIRE EXTINGUISHERS AS A REPLACEMENT FOR HALON 1211 ON CIVILIAN TRANSPORT CATEGORY AIRCRAFT.
Engine Nacelle Halon Replacement, FAA, WJ Hughes Technical Center Point of Contact :Doug Ingerson Department of Transportation Federal Aviation Administration.
Presented to: By: Date: Federal Aviation Administration International Aircraft Materials Fire Test Working Group Developing an In-flight Fire Condition.
Point of Contact :Doug Ingerson Department of Transportation Federal Aviation Administration WJ Hughes Technical Center Fire Safety Branch, AAR-440 Bldg.
Federal Aviation Administration Evacuation Slide Test Method: Round Robin 3 Results 0 Evacuation Slide Test Method: Comparison Test Results Federal Aviation.
Modeling of Fuel Tank Inerting for FAA OBIGGS Research
NexGen Burner Update International Aircraft Materials Fire Test Working Group Meeting October 21, 2009 Atlantic City, NJ.
WJH FAA Technical Center John W. Reinhardt
William Cavage AAR-440 Fire Safety Branch Wm. J
IASFPWG – Seattle, WA Fuel Tank Ignition Experiments at Reduced Oxygen Concentrations International Aircraft Systems Fire Protection Working Group.
Jet-A Vaporization In an Experimental Tank Part II: Experimental Results at Atmospheric and Sub-Atmospheric Pressures Robert Ian Ochs Rutgers, The State.
Modeling Wing Tank Flammability Dhaval D. Dadia Dr. Tobias Rossmann Rutgers, The State University of New Jersey Piscataway, New Jersey Steven Summer Federal.
Cargo Bay Fire Protection with a Fuel Tank Inerting System William Cavage AAR-440 Fire Safety Branch Wm. J. Hughes Technical Center Federal Aviation Administration.
An Update on FAA Fuel Tank Ullage Modeling
Class C Cargo Compartment ULD Suppression Agent Penetration Test
Aircraft Cargo Compartment Fire Detection David Blake FAA William J. Hughes Technical Center Atlantic City Airport, NJ Phone:
Modeling of Single Bay Fuel Tank Inerting for FAA OBIGGS Research
Federal Aviation Administration AVIATION HEAT FLUX CALIBRATION STANDARD 2013 Triennial International Fire & Cabin Safety Research Conference Philadelphia,
FIREPROOF AND FIRE RESISTANT MATERIALS Federal Aviation Administration Project Manager: J. Reinhardt William J. Hughes Technical Center Airport and Aircraft.
Engine Nacelle Halon Replacement, FAA WJ Hughes Technical Center Point of Contact :Doug Ingerson Department of Transportation Federal Aviation Administration.
Inerting Background Inerting refers to rendering the ullage (air above fuel) unable to propagate a reaction given flammable conditions and ignition source.
Federal Aviation Administration Burnthrough Update International Aircraft Materials Fire Test Working Group Meeting June 17, 2009 Köln, Germany.
Jet Fuel Vaporization and Condensation: Modeling and Validation C.E. Polymeropoulos Robert Ochs Rutgers, The State University of New Jersey International.
ALTERNATIVE AGENT UPDATE Louise C. Speitel Fire Safety Branch AAR-440 FAA W.J. Hughes Technical Center Atlantic City International Airport, NJ
Federal Aviation Administration Status of Research & Testing to Replace Halon Extinguishing Agents in Civil Aviation Fire Safety Team FAA Wm. J. Hughes.
Systems Fire Protection Working Group DTA - Grenoble, France June 21-22, 2003 FAA Inerting System Flight Testing on an Airbus A320 William Cavage AAR-440.
Presented to: By: Date: Federal Aviation Administration Forced-flow Fire Testing with “cold”-soaked FK International Aircraft Systems Fire Protection.
Federal Aviation Administration Handheld Advisory Circular Update Louise Speitel Fire Safety Branch FAA Wm. J. Hughes Technical Center Atlantic City International.
Federal Aviation Administration Aircraft Wiring 0 Federal Aviation Administration International Aircraft Materials Fire Test Working Group Bremen, Germany.
Presented to: By: Date: Federal Aviation Administration In-Flight Burn- Through Tests Aluminum vs. composite materials Aircraft Systems Fire Working Grp.
Federal Aviation Administration Radiant Panel Test for Thermal/Acoustic Insulation 0 Federal Aviation Administration International Aircraft Materials Fire.
Federal Aviation Administration Measuring Ullage Oxygen Concentration November 17-18, Measuring Oxygen Concentration in a Fuel Tank Ullage Federal.
IASFPWG – Seattle, WA Jet-A Vaporization Computer Model A Fortran Code Written by Prof. Polymeropolous of Rutgers University International Aircraft.
Reticulated Foam Advantages: 100% protection Passive System
NexGen Fire Test Burner Update
Presented to: IAMFTWG, Renton, WA By: Robert Ochs Date: March 3, 2010 Federal Aviation Administration NexGen Burner for Seat Cushion Fire Testing.
Federal Aviation Administration Aircraft Ducting 0 Federal Aviation Administration International Aircraft Materials Fire Test Working Group Savannah, GA.
Cargo Bay Fire Protection with a Fuel Tank Inerting System
Federal Aviation Administration Halon 1211 Stratification/ Localization in Aircraft Louise Speitel Fire Safety Branch FAA Wm. J. Hughes Technical Center.
Federal Aviation Administration 0 Composite Wing Tank Flammability November 20, Composite and Aluminum Wing Tank Flammability Comparison Testing.
Jet Fuel Vaporization and Condensation: Modeling and Validation Robert Ochs and C.E. Polymeropoulos Rutgers, The State University of New Jersey International.
Point of Contact :Doug Ingerson Department of Transportation Federal Aviation Administration WJ Hughes Technical Center Fire Safety Branch, ATO-P (formerly.
OBIGGS Sizing Data for Transport Canada Trade Study William Cavage AAR-440 Fire Safety Branch Wm. J. Hughes Technical Center Federal Aviation Administration.
March 26-27, 2003 International Aircraft Systems Fire Protection Working Group Phoenix, Az Inerting of a Scale 747SP Center-Wing Fuel Tank During a Typical.
Point of Contact :Doug Ingerson Department of Transportation Federal Aviation Administration WJ Hughes Technical Center Fire Safety Branch, AAR-440 Bldg.
AAR-410 January 14, FAA Airport Pavement Technology Program u National Airport Pavement Test Facility, FAA William J. Hughes Technical Center, Atlantic.
Engine Nacelle Halon Replacement, FAA, WJ Hughes Technical Center Point of Contact :Doug Ingerson Department of Transportation Federal Aviation Administration.
October 30-31, 2002 International Aircraft Systems Fire Protection Working Group Atlantic City, NJ Inerting of a Scale 747SP Center Wing Fuel Tank During.
Point of Contact :Doug Ingerson Department of Transportation Federal Aviation Administration WJ Hughes Technical Center Fire Safety Branch, AJP6320 Bldg.
Federal Aviation Administration 0 Composite Wing Tank Flammability May 19 th, Composite and Aluminum Wing Tank Flammability Comparison Testing Steve.
Federal Aviation Administration 0 Composite Wing Tank Flammability May 20, Composite and Aluminum Wing Tank Flammability Comparison Testing Steve.
Systems Fire Protection Working Group DTA - Grenoble, France June 21-22, 2003 Preliminary Results of FAA Fuel Tank Inerting Flight Testing on the NASA.
Federal Aviation Administration Status of Research & Testing to Replace Halon Extinguishing Agents in Civil Aviation Douglas Ingerson Louise Speitel Constantine.
MULTI-COMPONENT FUEL VAPORIZATION IN A SIMULATED AIRCRAFT FUEL TANK C. E. Polymeropoulos Department of Mechanical and Aerospace Engineering, Rutgers University.
IASFPWG – Atlantic City, NJ Limiting Oxygen Concentration (LOC) Work Update International Aircraft Systems Fire Protection Working Group Atlantic.
Federal Aviation Administration Slide Evacuation Test Method TSO C69A 0 Slide Evacuation Test Method TSO C69A Federal Aviation Administration International.
Presented to: By: Date: Federal Aviation Administration Engine Nacelle Halon Replacement International Aircraft Systems Fire Protection Working Group Mr.
IASFPWG – Ottawa, Canada Low Fuel Load Flammability Work International Aircraft Systems Fire Protection Working Group Ottawa, Canada February.
Engine Nacelle Halon Replacement, FAA, WJ Hughes Technical Center Point of Contact :Doug Ingerson Department of Transportation Federal Aviation Administration.
Presented to: By: Date: Federal Aviation Administration Engine Nacelle Halon Replacement International Aircraft Systems Fire Protection Working Group Douglas.
Wing Tank Flammability Testing William Cavage Steven Summer AAR-440 Fire Safety Branch Wm. J. Hughes Technical Center Federal Aviation Administration International.
Federal Aviation Administration Aircraft Ducting 0 Federal Aviation Administration International Aircraft Materials Fire Test Working Group Atlantic City,
Presentation transcript:

Engine Nacelle Halon Replacement, FAA, WJ Hughes Technical Center Point of Contact :Doug Ingerson Department of Transportation Federal Aviation Administration WJ Hughes Technical Center Fire Safety Section, AAR-422 Bldg 205 Atlantic City Int'l Airport, NJ USA tel: fax: web page: International Aircraft Systems Fire Protection Working Group Seattle-Tacoma Airport, WA March 2002 Federal Aviation Administration WJ Hughes Technical Center, Fire Safety Section, AAR-422 Atlantic City Int'l Airport, NJ USA

Three Major Topics for Review : progress/current status presentation of recent data near term plans International Aircraft Systems Fire Protection Working Group Seattle-Tacoma Airport, WA March 2002 Federal Aviation Administration WJ Hughes Technical Center, Fire Safety Section, AAR-422 Atlantic City Int'l Airport, NJ USA

PROGRESS/CURRENT STATUS >Test Fixture #Fuel System iPrior system to heat the fuel and deliver it to the nozzles in the spray fire zone deemed inadequate iReplaced pump for fuel heating; heating time changes from 1+ hours to 20 minutes iReplace pump for spray nozzles w/pressurized ullage system iFuel nozzles will be changed to alter flow rate to the spray fire zone #Fire Extinguisher iEquilibrium system in place iAgent/N2 solubility is a notable phenomena iFirex servicing procedures now account for agent/N2 behavior iDistribution plumbing altered to decrease discharge duration International Aircraft Systems Fire Protection Working Group Seattle-Tacoma Airport, WA March 2002 Federal Aviation Administration WJ Hughes Technical Center, Fire Safety Section, AAR-422 Atlantic City Int'l Airport, NJ USA

PROGRESS/CURRENT STATUS >Test Fixture ( cont’d ) #Hot plates iSpray hot plate failed 15Oct01 ]Process control thermocouples separate from plate; significant overheat results ]Difficulties repaired; operational 7Nov01 iElectrical circuit for the pool hot plate faulted 31Jan02 ]Plate removed, reason for fault found and corrected ]Operational 5Feb02 International Aircraft Systems Fire Protection Working Group Seattle-Tacoma Airport, WA March 2002 Federal Aviation Administration WJ Hughes Technical Center, Fire Safety Section, AAR-422 Atlantic City Int'l Airport, NJ USA

PRESENTATION OF RECENT DATA >Data Presentation #Fire Extinguishing System iProblems w/past distribution results required system evaluation iEvaluation produced the following areas likely causing the difficulty ]Distribution plumbing ]Agent/N2 equilibrium i The resultant changes in the system yielded positive gains in performance ]Increased the the cross sectional area of the discharge pathway for the agent flow ]The single flow split in the discharge pathway changed from a tee to a wye ]Agent/N2 equilibrium behavior calculated (NIST computer program PROFISSY) ]Agent/N2 equilibrium attained prior to test discharge International Aircraft Systems Fire Protection Working Group Seattle-Tacoma Airport, WA March 2002 Federal Aviation Administration WJ Hughes Technical Center, Fire Safety Section, AAR-422 Atlantic City Int'l Airport, NJ USA

PRESENTATION OF RECENT DATA 1.25”OD WYE AS FLOW SPLIT 5/8”OD tube From firex ball valve 1.25”OD TEE AS FLOW SPLIT From firex ball valve 1/2” TUBE BUTT FOR NOZZLES  8” C/L-C/L 1/2”OD tube Within Test Fixture Interior International Aircraft Systems Fire Protection Working Group Seattle-Tacoma Airport, WA March 2002 Federal Aviation Administration WJ Hughes Technical Center, Fire Safety Section, AAR-422 Atlantic City Int'l Airport, NJ USA 5/8” TUBE BUTT FOR NOZZLES NOZZLES FARTHEST FROM CORE RESTRICTED BY 5/8”ODx3/8”ID WASHER

PRESENTATION OF RECENT DATA “Top-off” is the total pressure of the agent/N2 mixture when the system is in equilibrium for the given temperature. International Aircraft Systems Fire Protection Working Group Seattle-Tacoma Airport, WA March 2002 Federal Aviation Administration WJ Hughes Technical Center, Fire Safety Section, AAR-422 Atlantic City Int'l Airport, NJ USA

PRESENTATION OF RECENT DATA International Aircraft Systems Fire Protection Working Group Seattle-Tacoma Airport, WA March 2002 Federal Aviation Administration WJ Hughes Technical Center, Fire Safety Section, AAR-422 Atlantic City Int'l Airport, NJ USA

PRESENTATION OF RECENT DATA >Data Presentation ( cont’d ) #Gas Analysis iAnalyzer completed; known as “Hal2 Rebuilt” iProducing data from transducers as a Direct Current Voltage (VDC) history iSensor signal starts at a maximum value; as gas concentration increases, signal decreases (converse behavior applies) iData manipulation ]Raw signal run through a smoothing routine ]Smoothed data aligned at some consistent signal value ]All 12 channels reviewed as one distribution profile ]Second review of data incorporates the minimum and maximum values for each time increment International Aircraft Systems Fire Protection Working Group Seattle-Tacoma Airport, WA March 2002 Federal Aviation Administration WJ Hughes Technical Center, Fire Safety Section, AAR-422 Atlantic City Int'l Airport, NJ USA

PRESENTATION OF RECENT DATA International Aircraft Systems Fire Protection Working Group Seattle-Tacoma Airport, WA March 2002 Federal Aviation Administration WJ Hughes Technical Center, Fire Safety Section, AAR-422 Atlantic City Int'l Airport, NJ USA

PRESENTATION OF RECENT DATA as of 25Feb02... Ring location ch# - clock position FWD MID AFT 11-12: : : : : : : : : : : :00 International Aircraft Systems Fire Protection Working Group Seattle-Tacoma Airport, WA March 2002 Federal Aviation Administration WJ Hughes Technical Center, Fire Safety Section, AAR-422 Atlantic City Int'l Airport, NJ USA

PRESENTATION OF RECENT DATA International Aircraft Systems Fire Protection Working Group Seattle-Tacoma Airport, WA March 2002 Federal Aviation Administration WJ Hughes Technical Center, Fire Safety Section, AAR-422 Atlantic City Int'l Airport, NJ USA

PRESENTATION OF RECENT DATA International Aircraft Systems Fire Protection Working Group Seattle-Tacoma Airport, WA March 2002 Federal Aviation Administration WJ Hughes Technical Center, Fire Safety Section, AAR-422 Atlantic City Int'l Airport, NJ USA

NEAR TERM PLANS >Test Activity #Gas Analysis iCold agent testing on-going since latter Feb ‘02 ]Difficulty getting agent temperature to -65°F ]Process refined iTesting continuing now (12-15March02) ]Will find acceptable distribution profiles for two air flow conditions ]Air flow conditions => high flow/low temperature & low flow/high temperature iClosure analysis will include : ]Distribution profile measurements at agent storage conditions during fire testing ]Distribution profile measurements for agent storage conditions at depressed temperature International Aircraft Systems Fire Protection Working Group Seattle-Tacoma Airport, WA March 2002 Federal Aviation Administration WJ Hughes Technical Center, Fire Safety Section, AAR-422 Atlantic City Int'l Airport, NJ USA

NEAR TERM PLANS >Test Activity ( cont’d ) #Fire Testing iWill follow on immediately after agent distribution work at depressed temperature is completed (mid-March ‘02) iBasic fire characterizations completed International Aircraft Systems Fire Protection Working Group Seattle-Tacoma Airport, WA March 2002 Federal Aviation Administration WJ Hughes Technical Center, Fire Safety Section, AAR-422 Atlantic City Int'l Airport, NJ USA