Certification and test activity IT ROC/CIC Deployment Team LCG WorkShop on Operations, CERN 2-4 Nov 2004 www.eu-egee.org.

Slides:



Advertisements
Similar presentations
LCG WLCG Operations John Gordon, CCLRC GridPP18 Glasgow 21 March 2007.
Advertisements

Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft Torsten Antoni – LCG Operations Workshop, CERN 02-04/11/04 Global Grid User Support - GGUS -
Last update 01/06/ :23 LCG 1Maria Dimou- cern-it-gd Maria Dimou IT/GD Site Registration policy & procedures
Deployment Team. Deployment –Central Management Team Takes care of the deployment of the release, certificates the sites and manages the grid services.
08/11/908 WP2 e-NMR Grid deployment and operations Technical Review in Brussels, 8 th of December 2008 Marco Verlato.
Dave Kant Grid Monitoring and Accounting Dave Kant CCLRC e-Science Centre, UK HEPiX at Brookhaven 18 th – 22 nd Oct 2004.
INFSO-RI Enabling Grids for E-sciencE SA1: Cookbook (DSA1.7) Ian Bird CERN 18 January 2006.
SEE-GRID-SCI SEE-GRID-SCI Operations Procedures and Tools Antun Balaz Institute of Physics Belgrade, Serbia The SEE-GRID-SCI.
Monitoring in EGEE EGEE/SEEGRID Summer School 2006, Budapest Judit Novak, CERN Piotr Nyczyk, CERN Valentin Vidic, CERN/RBI.
11/30/2007 Overview of operations at CC-IN2P3 Exploitation team Reported by Philippe Olivero.
The huge amount of resources available in the Grids, and the necessity to have the most up-to-date experimental software deployed in all the sites within.
Responsibilities of ROC and CIC in EGEE infrastructure A.Kryukov, SINP MSU, CIC Manager Yu.Lazin, IHEP, ROC Manager
GridPP Deployment & Operations GridPP has built a Computing Grid of more than 5,000 CPUs, with equipment based at many of the particle physics centres.
Cracow Grid Workshop October 2009 Dipl.-Ing. (M.Sc.) Marcus Hilbrich Center for Information Services and High Performance.
Maarten Litmaath (CERN), GDB meeting, CERN, 2006/02/08 VOMS deployment Extent of VOMS usage in LCG-2 –Node types gLite 3.0 Issues Conclusions.
EGEE is a project funded by the European Union under contract IST User support in EGEE Alistair Mills Torsten Antoni EGEE-3 Conference 20 April.
FP6−2004−Infrastructures−6-SSA E-infrastructure shared between Europe and Latin America Grid Monitoring Tools Alexandre Duarte CERN.
CERN Using the SAM framework for the CMS specific tests Andrea Sciabà System Analysis WG Meeting 15 November, 2007.
INFSO-RI Enabling Grids for E-sciencE OSG-LCG Interoperability Activity Author: Laurence Field (CERN)
Fabric Monitoring at the INFN Tier1 Felice Rosso on behalf of INFN Tier1 Joint OSG & EGEE Operations WS, Culham (UK)
US LHC OSG Technology Roadmap May 4-5th, 2005 Welcome. Thank you to Deirdre for the arrangements.
1 Andrea Sciabà CERN Critical Services and Monitoring - CMS Andrea Sciabà WLCG Service Reliability Workshop 26 – 30 November, 2007.
Portal Update Plan Ashok Adiga (512)
8 th CIC on Duty meeting Krakow /2006 Enabling Grids for E-sciencE Feedback from SEE first COD shift Emanoil Atanassov Todor Gurov.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE Site Architecture Resource Center Deployment Considerations MIMOS EGEE Tutorial.
Site Validation Session Report Co-Chairs: Piotr Nyczyk, CERN IT/GD Leigh Grundhoefer, IU / OSG Notes from Judy Novak WLCG-OSG-EGEE Workshop CERN, June.
SAM Sensors & Tests Judit Novak CERN IT/GD SAM Review I. 21. May 2007, CERN.
INFSO-RI Enabling Grids for E-sciencE An overview of EGEE operations & support procedures Jules Wolfrat SARA.
Certification and test activity ROC/CIC Deployment Team EGEE-SA1 Conference, CNAF – Bologna 05 Oct
Last update 31/01/ :41 LCG 1 Maria Dimou Procedures for introducing new Virtual Organisations to EGEE NA4 Open Meeting Catania.
EGEE is a project funded by the European Union under contract IST Roles & Responsibilities Ian Bird SA1 Manager Cork Meeting, April 2004.
CERN Running a LCG-2 Site – Oxford July - 1 LCG2 Administrator’s Course Oxford University, 19 th – 21 st July Developed.
EGEE is a project funded by the European Union under contract INFSO-RI Grid accounting with GridICE Sergio Fantinel, INFN LNL/PD LCG Workshop November.
ROC managers meeting, Barcelona, Luciano Gaido (thanks to Paolo Veronesi for the slides) ROC-IT status.
M. Cristina Vistoli EGEE SA1 Organization Meeting EGEE is proposed as a project funded by the European Union under contract IST Regional Operations.
Gennaro Tortone, Sergio Fantinel – Bologna, LCG-EDT Monitoring Service DataTAG WP4 Monitoring Group DataTAG WP4 meeting Bologna –
INFN GRID Production Infrastructure Status and operation organization Cristina Vistoli Cnaf GDB Bologna, 11/10/2005.
EGEE is a project funded by the European Union under contract IST New VO Integration Fabio Hernandez ROC Managers Workshop,
SAM Status Update Piotr Nyczyk LCG Management Board CERN, 5 June 2007.
II EGEE conference Den Haag November, ROC-CIC status in Italy
– n° 1 Grid di produzione INFN – GRID Cristina Vistoli INFN-CNAF Bologna Workshop di INFN-Grid ottobre 2004 Bari.
EGEE is a project funded by the European Union under contract IST GENIUS and GILDA Guy Warner NeSC Training Team Induction to Grid Computing.
1/3/2006 Grid operations: structure and organization Cristina Vistoli INFN CNAF – Bologna - Italy.
Claudio Grandi INFN Bologna Virtual Pools for Interactive Analysis and Software Development through an Integrated Cloud Environment Claudio Grandi (INFN.
INFSO-RI Enabling Grids for E-sciencE Resource allocation and negotiation update C. Vistoli, R. Rumler Operations workshop Bologna.
INFN/IGI contributions Federated Clouds Task Force F2F meeting November 24, 2011, Amsterdam.
TIFR, Mumbai, India, Feb 13-17, GridView - A Grid Monitoring and Visualization Tool Rajesh Kalmady, Digamber Sonvane, Kislay Bhatt, Phool Chand,
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks The Dashboard for Operations Cyril L’Orphelin.
DGAS Distributed Grid Accounting System INFN Workshop /05/1009, Palau Giuseppe Patania Andrea Guarise 6/18/20161.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks CYFRONET site report Marcin Radecki CYFRONET.
1 Grid Operations Jinny Chien ASGC June 09, Academia Sinica Slides adapted from the EGEE training material repository:
CERN LCG1 to LCG2 Transition Markus Schulz LCG Workshop March 2004.
Enabling Grids for E-sciencE INFN Workshop – May 7-11 Rimini 1 Grid Accounting Status at INFN Riccardo Brunetti INFN-TORINO.
Scuola Grid - Martina Franca, Thursday 08 November Il Sistema di Supporto INFNGrid & GGUS ( Global Grid User.
Grid Monitoring and Diagnostic Tools: GridICE, GSTAT, SAM Giuseppe Misurelli INFN-CNAF giuseppe.misurelli cnaf.infn.it.
INFN-Grid WS, Bari, 2004/10/15 Andrea Caltroni, INFN-Padova Marco Verlato, INFN-Padova Andrea Ferraro, INFN-CNAF Bologna EGEE User Support Report.
– n° 1 The Grid Production infrastructure Cristina Vistoli INFN CNAF.
Servizi core INFN Grid presso il CNAF: setup attuale
Service Availability Monitoring
Job monitoring and accounting data visualization
Regional Operations Centres Core infrastructure Centres
Technical Board Meeting, CNAF, 14 Feb. 2004
Brief overview on GridICE and Ticketing System
ATLAS support in LCG.
Sergio Fantinel, INFN LNL/PD
INFN – GRID status and activities
The CCIN2P3 and its role in EGEE/LCG
Pierre Girard ATLAS Visit
EGEE Operation Tools and Procedures
Site availability Dec. 19 th 2006
Presentation transcript:

Certification and test activity IT ROC/CIC Deployment Team LCG WorkShop on Operations, CERN 2-4 Nov

November 2-4, CERN Summary INFN-GRID release: resources, services and supported VOs; Basic tests before joining the grid; Certification and periodic tests activity; Calendar and Ticketing System; Certification queue; GridAT (Grid Application Test);

November 2-4, CERN INFN-GRID Release INFN-GRID is a customized release of LCG  All resources are fully managed via LCFGng;  INFN-GRID does not support the middleware installation without LCFGng; INFN-GRID release is based upon the official LCG and it is 100% compatible; Main differences from LCG to INFN-GRID 2.2.0:  Added support for DAG jobs;  Added support for AFS on the WorkerNodes;  Added support for MPI jobs via home syncronisation with ssh;  Documented installation of WNs on a private network; Added VOMS support:  INFNGRID, CDF are completely managed via VOMS server.

November 2-4, CERN INFN-GRID: Resources and supported VOs (**) Hyperthreaded

November 2-4, CERN INFN-GRID & EGEE: Dedicated service resources Service Resources are open to all VOs supported by INFN-GRID! RB: egee-rb-01.cnaf.infn.it support also BIOMED VO

November 2-4, CERN Upgrade/Installation activity Testing if "the grid is working" is not so easy; Certification activity in INFN-GRID can be classified into four levels:  Local tests by the local resource center managers;  Certification tests by ROC/CIC Team;  Monitor tests by ROC/CIC Team;  The fourth level, certification on demand, made both by ROC Team and Application Teams.

November 2-4, CERN Certification activity The ROC/CMT (Central Management Team) is responsible of the resource centers certification: checking the functionalities of a site before joining the site to the production grid. Although all certification jobs are VO independent, the INFNGRID VO is used to perform these jobs; In particular are checked: GIIS' information consistence; Local jobs submission (LRMS); Grid submission with Globus (globus-job-run); Grid submission with the ResourceBroker; ReplicaManager functionalities; In order to certificate a site the CMT uses only dedicated grid services:  RB & BDII: gridit-cert-rb.cnaf.infn.it In this way we avoid to have an uncertified site in the production grid services;

November 2-4, CERN Periodic test ROC Team and each resource manager, could notify advices about their resources via web inserting a “Downtime advices”. The Calendar shows the snapshot of the Production Service Status. We periodically submit certification jobs to the sites in the production grid, in order to pro-actively find ‘troubles’ before users find them.

November 2-4, CERN Ticketing system INFN-GRID ticketing system is used: from users to ask questions or to communicate troubles; from resource manager to communicate about common grid tasks (ex: upgrading to a new grid release), or to solve problem.  Support Groups are “helper” groups and they exist to resolve the obvious problems arising with the grow of the grid: –Support Grid Services (RB, RLS, VOMS, GridICE, etc) Group; –Support VO Services Group (each for every VO); –Support VOApplications Group (each for every VO); –Support Site Group (each for every site)  Operative Groups aren`t "helper" groups. They exist to improve the overall grid coordination: –Operative Central Management Team (CMT); –Operative Release & Deployment Team; Users -> Create a ticket Supporters/Operatives -> Open the ticket Users and/or Supporters/Operatives -> Update an open ticket Supporters/Operatives -> Close the ticket

November 2-4, CERN Why a “cert” queue ? A CE could exist in many BDIIs with different purpose (CIC, LCG, VO specific) After a site upgrade, just as soon as queues were opened, a lot of jobs arrived from anywhere to an uncertified (and potentially unstable) site and making impossible its fully certification. To avoid this, all sites joining INFN-GRID have a cert queue (both with PBS and LSF): –High priority queue; –Only open to VO INFNGRID; –With a low max cpu time (10 minutes);  After site installation/upgrade, only the cert queues is opened;  After certification tests by ROC, every other queues will be opened; In addiction, in this way, all periodic test jobs by ROC submitted to the cert queue will always have a higher priority than the other jobs.

November 2-4, CERN Certification steps 1. Site open Cert queue 2. Site do local basic tests/checks (globus, ldap, mount, …) 3. Site request to join the Grid (re-join in case of an upgrade with no compatible MW) 4. ROC check info published by site’s GIIS, and add it to CERT BDII 5. ROC submit the cert job (fill all WN cpus?) 6. ROC communicate the result: site certified! 7. ROC add the site to production BDII 8. Site open the production queues If there are open issues with the site they can be tracked on the trouble ticketing system between the grid-managers (the ROC member who have picked up the certification of that site) and site admins.

November 2-4, CERN BDII - ROC setup All the sites, certified by the ROC team using the test zone are added to the ROC production BDII accessible via web. Each Roc create, manage and publish via web the region BDII  Similar to The ROC is ‘authoritative’ for its BDII, it is the master copy of CE and SE of his region  Operations relatedwith ROC resource centers are reflected in the BDII content (scheduled downtime, planned upgrade, site certification failure) All CICs and OMC run a EGEE-BDII made of the union of all the ROCs and CERN BDII lists A script like this one, used by ROC-IT, can be used to automatically merge BDII lists, avoiding duplicate sites, to create EGEE-allsites-lists:  RBs can be associated with EGEE-allsites-BDII, regional or other BDII containing ad hoc selection of sites from global lists

November 2-4, CERN GridAT - Grid Application Test GridAT has the main goal to provide a general and flexible framework for VO application tests in a grid system. Under development by T. Coviello and A. Pierro (INFN-BARI) It permits to test a grid site from the VO viewpoint. Results are stored in a central database and browsable on a web page so it will be also used for certification and test activity. Plans are to integrate the GridAT interface under Grid-it portal.

November 2-4, CERN How to control a Grid Objective: provide a multi level control of the Grid  Status of each site Main services status Detailed node status  Use of the resource What VO is using the Grid What users is using the Grid What site is used  Discovery and preventing the failure Controlling most important hardware parameter of each machine Setting advisory and allarms  Sites testing and certification Middleware testing Application testing  On-line accounting and reporting on resource usage How many jobs each VO/user is runnig How many CPU*hours each VO/user is using

November 2-4, CERN Global Site View Name of the site Slot Load Jobs Information Computational Information Storage Information

November 2-4, CERN Specific Site View Host unreachable Deamons down Short node information

November 2-4, CERN Host information File system Information Used/Available Space Used/Available Inode Used/Available RAM Memory (Real/Virtual) CPU Utilization (System/User/Nice) Load (1/5/15 Min) Number of Process (Total/Running/Sleep/Zombie/Stopped)

November 2-4, CERN Usage control How many jobs are running of each VO Which VO is running in which site Graphical view of distribution

November 2-4, CERN Useful links INFN Production Grid  INFN GridICE  INFN test and certification  INFN Support 