IG Meeting Transmission Development activities in the CEE Region in the scope of Coordinated Transmission System Development WG and UCTE Central East Forum.

Slides:



Advertisements
Similar presentations
Development Alternatives SOUTH ASIA E N V I R O N M E N T O U T L O O K.
Advertisements

Permanent High Level Group meeting Athens, September 9 th, 2003 Towards a Standard Market Design for the SE Europe Electricity Market Prof. P. Capros,
Zagreb, 28 September 2004 The South East Europe gas market: a preliminary analysis of facts and opportunities from the Regulators perspective GAS TASK.
Completing the EU internal energy market IFIEC, 22 November 2011
The role of ACER In the Regional Initiatives Steve Gordon Head Of the Gas Department North West Regional Initiatives 2011.
GIE Reverse Flows Study Revers Flows inside the SSE Region Vaclav Vocilka GIE Executive Secretary GRI SSE SG Vienna, 16 October.
ERGEG Advice Comitology Guidelines on Fundamental Electricity Data Transparency Florence Forum 13 December 2010 Bente Danielsen.
Baltic Energy Strategy Einari Kisel Director of Energy Department.
Electricity Security of Supply European System Adequacy Forecast XV Florence Forum, November 2008.
Does the Third Package provide the European TSO associations with the tools necessary to find solutions to the European energy challenge ? Pierre BORNARD.
Completing the EU internal energy market
P.Labra – EWEA March 2012 ENTSO-E’s & TYNDP’s vision on adapting European Transmission Grid to large amounts of wind power.
Frankfurt (Germany), 6-9 June 2011 Coordination between TSOs and DSOs – a necessity for system planning and operation Dr. Ralph Pfeiffer Amprion GmbH 1.
Mark van Stiphout – DG TREN – C2 Internal market for electricity and gas The role of TSOs in the third package EUROPEAN COMMISSION GIE conference 7 May.
3 November 2005 GIE Conference Gas Market Developments in SEE Balázs SÁNDOR Chairman GIE ECSEE Study Group Athens - 3 November 2005.
Errol Close Decarbonisation Policy and Co-ordination IWFA May Conference.
System of Environmental-Economic Accounting SEEA-Energy Implementation United Nations Statistics Division Oslo Group Meeting September 2013 Baku,
David Halldearn, ERGEG Conference on Implementing the 3 rd Package 11 th December 2008 Implementating the 3rd Package: An ERGEG Consultation paper.
E.ON on the Romanian Energy Market ZF Power Summit Bucharest, February 27, 2013 Frank Hajdinjak CEO E.ON România.
Flow-based Allocations Mini Forum Central Western REM June 20 th, 2006.
1 THE THIRD ENERGY PACKAGE – THE ENERGY COMMUNITY APPROACH Energy Community Secretariat 20 th Forum of the Croatian Energy Association and WEC National.
© OECD/IEA 2010 Energy Policies of the Czech Republic 2010 In-depth Review Energy Policies of the Czech Republic 2010 In-depth Review Prague, 7 October.
Parallel local initiatives – Central West electricity region and the Pentalateral Forum Mr Dominique Woitrin CREG, Belgium The Regional Initiatives: Progress.
ENTSO-E’s Network Development Plans and Network Codes: How a strong European grid supports security of supply, affordable electricity prices through market.
21 Kolonaki Square, Athens, T: , F: , E: W: The Energy Community of South.
Black Sea Regional Transmission Planning Project By Predrag Mikša EKC - Electricity Coordinating Center Istanbul, March 2011.
Creating a Single European Energy Market – the Regulatory Perspective London, 30. January 2007 ERGEG Electricity Regional Initiative Central-East Europe.
1 Gas Regional Investment Plan North West Europe GRI Meeting, November 25 th 2011.
How do CEE countries benefit from improved regional cooperation? from the Czech TSO perspective The Regional Initiatives - Progress and Prospects Joint.
Energy Agency of the Republic of Serbia
Benoît Esnault Commission de Régulation de l’Energie (CRE) - ERGEG 19th Madrid Forum, March 2011 Energy Infrastructure Package ERGEG preliminary.
Challenges for the electricity sector from a TSO perspective Zbyněk Boldiš Member of the Board ČEPS, a.s. ASD Annual Convention – Knowledge Café 24 April.
Electricity Regional Initiative Central Eastern European Region Congestion Management – Status & Prospects Tahir Kapetanovic E-Control CEE Stakeholder.
Civil Societies Expectations on the Energy Union Providing Secure and Affordable Energy to EU Citizens EESC Hearing May S Nies Susanne Nies Corporate.
VUJE, a. s., Okružná 5, Trnava Strengthening the European Union Energy Security Prepared by Peter Líška (Slovak proposal) Brussels, 14th September.
XIV th Florence Forum 24/25 September 2007 Tahir Kapetanovic / Nicolas Bonnesoeur Chairmen of the CEER Electricity Security of Supply TF C07-SOS-03-03a.
UPDATES ON THE LATEST DEVELOPMENTS IN LITHUANIA Aistija Zubaviciute National Control Commission for Prices and Energy 3 April 2007, Riga.
Mr Martin Crouch, ERGEG Electricity Regulatory Forum 2009 Florence, 5 June 2009 Status Review of Sustainable Development in the Energy Sector.
1 The regulators’ view on the Central West REM: Emphasis on the completion of existing initiatives Presentation for the Mini-Forum 20 June 2006.
Secondary legislation on renewable today and tomorrow Nicolae Opris Vicepresident, ANRE ANRE ROMANIAN ENERGY REGULATORY AUTHORITY.
Increasing integration of variable RES-E: Policy and regulatory measures for T&D networks Luis Olmos Pontificia Comillas University Madrid / Spain
Cross border redispatching Central West Electricity Regional Energy Market Mini Forum Alain Marien 20 th of June 2006.
Transparency in the Central West Electricity Regional Energy Market Office of Energy Regulation (DTe) MINI FORUM Paul Giesbertz.
European Commission views on intra-day and balancing markets
Walter Boltz & Asta Sihvonen-Punkka, ERGEG Conference on Implementing the 3 rd Package Brussels, 11 th December 2008 Implementing the 3 rd Package Framework.
SEA in the Czech Republic Prague, 24 September 2008.
1 Regional electricity market Belgrade, 23. April Ljiljana Hadzibabic Council member Energy Agency of the Republic of Serbia.
1 Vienna Economic Forum –VEF- ERE AND THE REGULATORY FRAMEWORK FOR THE PRIVATISATION OF DSO Bujar Nepravishta Chairman of ERE Tirana-8 th and 9 th June.
1 May 2012CACM Network Code Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15 th May 2012.
BANKING SUPERVISORS AND XBRL 11th XBRL International Conference José María Roldán Director General of Regulation, Banco de España Chair of XBRL España.
BALTIC BALANCING MARKET Ingrid Arus Baltic Balancing Market Harmonisation WG meeting
Union for the co-ordination of transmission of electricity UCTE, 15 Boulevard Saint-Michel, 1040 Brussels, Belgium, UCTE comments on ERGEG.
Goran Majstrovic Davor Bajs Energy Institute HRVOJE POŽAR Croatia PREPARATION FOR LARGE SCALE WIND INTEGRATION IN SOUTH EAST EUROPE Joint TSO.
1FTS-CEER bilateral meeting, St Petersburg, 17 May 2011 Peter Plug Chairman of the electricity working group Use and management of interconnections – The.
Florence Forum, November 2008 Regulation (EC) 1228/ ERGEG Compliance Monitoring.
Electricity Regional Initiative Central Eastern European Region Convergence & Coherence Sven Kaiser E-Control CEE Stakeholder Group Meeting 7 th November.
IV Athens Forum 3-4 June 2004 Towards a GAS market in the South East Europe Fabio Tambone – Sergio Ascari WG CEER SEEER.
European Developments Transmission Workgroup 1 st December 2011.
Electricity Regional Initiative Central- South Region Progress with developing regional electricity markets By: Carlo Crea, Secretary General The Regulatory.
Workshop on Energy – Framework of the WS Moderator - Eugenijus Ušpuras, Lithuanian energy institute “The Baltic Sea Strategy – Region and Cohesion Policy.
Status Report of the Electricity Regional Initiative Ms Asta Sihvonen-Punkka ERGEG Electricity Focus Group (EFG) Chair The Regional Initiatives: Progress.
This project has received funding from the European Union’s Horizon2020 research and Innovation programme under grant agreement No
EU's region-wide strategy on Energy
10 year investment plan ERGEG approach and contribution
New transparency guidelines
Transmission Planning Code – Draft Document
ERGEG GRI South South East – , Maribor
WG1: RELIABLE, ECONOMIC AND EFFICIENT SMART GRID SYSTEM
Europe’s emerging energy and environment policy
Incentives for electricity infrastructure – ERGEG view
Presentation transcript:

IG Meeting Transmission Development activities in the CEE Region in the scope of Coordinated Transmission System Development WG and UCTE Central East Forum Svatopluk Vnoucek, CEPS Vienna, May 9th.2008

 Challenges and problems facing TSOs  CTSD WG/CE RF activities  Creation of Transmission Plan (TP)  TP – methodology and main outcomes  Other issues - plan for 2008 Presentation Outline

EU Objectives “…The promotion of the internal electricity market as well as the preservation and promotion of security of supply and the establishment of an ecologically sustainable energy supply, are part of the major objectives of the European Community…”

Future of Power Industry - Trend “…The electricity supply industry is undergoing a profound transformation worldwide. Market forces, scarcer natural sources, and an ever-increasing demand for electricity are some of drivers responsible for such an unprecedented change…”

Increase in Power Trading with fast varying load patterns is contributing to an increasing congestion and bottlenecks (Insufficient Transport Capacity). Increase in Power Trading with fast varying load patterns is contributing to an increasing congestion and bottlenecks (Insufficient Transport Capacity). The demand for a high reliability of power supply and high power quality. The demand for a high reliability of power supply and high power quality. The dramatic global climate developments have increased the demand of Clean Energy (RES). The dramatic global climate developments have increased the demand of Clean Energy (RES). Clogging of the available Transmission Capacity caused by Unexpected and Unwanted Circulating Power Flows. Clogging of the available Transmission Capacity caused by Unexpected and Unwanted Circulating Power Flows. …Therefore the challenges to TSOs:

Transmission Developments of many TSOs are being thwarted by a variety of well-founded, environmental, land-use, aesthetic considerations and regulatory pressures that prevent the licensing and construction of New Transmission Lines Transmission Developments of many TSOs are being thwarted by a variety of well-founded, environmental, land-use, aesthetic considerations and regulatory pressures that prevent the licensing and construction of New Transmission Lines Integration of European Market Integration of European Market  Contradictory requirements - maximizing security and minimizing the total cost  A lot of uncertainties on the locations, on the amounts of future generation units and on the associated transmission needs …Problems: Against the later mentioned rapid evolution … Goals remain unchanged : Sustainability of power supply must be provided Sustainability of power supply must be provided The Electricity Network Developments of the future must be Secure, Cost-effective and environmentally compatible The Electricity Network Developments of the future must be Secure, Cost-effective and environmentally compatible

Coordinated Transmission System Development Working Group  Established on its April high level meeting of 8 TSO, in 2006  CEPS, E-ON, ELES, MAVIR, PSE-Operator, SEPS, VATTENFALL, APG Verbund  The mission of group was defined (according to minutes from meeting) : … compile a list of already planned grid enforcements and extensions in the region … … compile a list of already planned grid enforcements and extensions in the region … … build a platform for regular meetings of grid planning experts… … build a platform for regular meetings of grid planning experts…

Background Benefits and advantages of cooperation of TSOs could be clearer if the following points are considered: TS in CEE region are influencing substantially each other as is given by existing meshed network and/or intensive international market with energy. TS in CEE region are influencing substantially each other as is given by existing meshed network and/or intensive international market with energy. Current transmission system weak points are very often border profiles between TSOs. Current transmission system weak points are very often border profiles between TSOs. New transmission system installations have effect not just for particular TSO but also for adjacent ones. New transmission system installations have effect not just for particular TSO but also for adjacent ones. Mutual exchange of information gives possibility to optimize development plans. Mutual exchange of information gives possibility to optimize development plans. Transmission development activities (planning and preparing investments) have long-term nature. Transmission development activities (planning and preparing investments) have long-term nature.

Expectations: Through exchange of information within the group the members will be informed of plans and progress of other TSOs. Through exchange of information within the group the members will be informed of plans and progress of other TSOs. They will have an opportunity to extract, adapt and learn those practices, methodology, structures, procedures and approaches that are being used and have proved to bring good results. They will have an opportunity to extract, adapt and learn those practices, methodology, structures, procedures and approaches that are being used and have proved to bring good results. Whenever possible a compilation of technical issues for planning purposes from TSO members in the group. Whenever possible a compilation of technical issues for planning purposes from TSO members in the group. Compilation of list of projects in CEE region Compilation of list of projects in CEE region

Activities: Creation of Terms of Reference. Creation of Terms of Reference. Creation of Internal Guidelines. Creation of Internal Guidelines. Review of common technical aspects related to development planning, e.g. N-1 Criterion. Review of common technical aspects related to development planning, e.g. N-1 Criterion. Presentation of experiences in the area of Development Planning from each TSO in the group. Presentation of experiences in the area of Development Planning from each TSO in the group. Additional role: Central East Regional Forum Additional role: Central East Regional Forum In the frame of UCTE Working Group Coordinated Planning the WG CTSD acts and performs all activities subjected to Central-East regional forum. In this context WG CTSD prepared a CEE Transmission Development plan. Final version of this CEE Transmission Development Plan is available. WG held 7 meetings since its establishment. WG held 7 meetings since its establishment. Creation of CEE Transmission Development Plan. Creation of CEE Transmission Development Plan.

On Regional Level – 5 Regional Fora: Central West, South West, Central South, Central East and South East.. On Regional Level – 5 Regional Fora: Central West, South West, Central South, Central East and South East.. Central East Regional Forum: 7 countries and 8 TSOs were involved. Central East Regional Forum: 7 countries and 8 TSOs were involved. On UCTE Level – contribution from UCTE member states. 23 countries are involved. On UCTE Level – contribution from UCTE member states. 23 countries are involved. Transmission Development Plan (TP)

Organization - Map

In September 2007 WG started creation of CEE Transmission plan. In September 2007 WG started creation of CEE Transmission plan. Basic input was detailed list of projects in CEE region compiled in the first half of year Basic input was detailed list of projects in CEE region compiled in the first half of year TP was created, discussed, commented, amended, corrected by members during meetings and via . TP was created, discussed, commented, amended, corrected by members during meetings and via . CEE TP is completed and available CEE TP is completed and available At present UCTE Transmission plan is being set up from contributions of UCTE TSO members At present UCTE Transmission plan is being set up from contributions of UCTE TSO members Creation of CEE Transmission Plan

Creation of Transmission Plan

Transmission plan - methodology Methodology based on forecast depending on scenarios Methodology based on forecast depending on scenarios Consumption growth Consumption growth Generation projects Generation projects Power exchanges Power exchanges The adequacy of the TS dimensioning is verified in normal and contingencies conditions The adequacy of the TS dimensioning is verified in normal and contingencies conditions Strategies to reinforce the network are set up in order to minimize: Strategies to reinforce the network are set up in order to minimize: Costs of generation Costs of generation Redispatching Redispatching Unsupplied energy Unsupplied energy Losses Losses

Transmission plan - structure Introduction Introduction Purpose Purpose Context of the Transmission plan Context of the Transmission plan Organization & Participants Organization & Participants Methodology & Data representativeness Methodology & Data representativeness Description of CEE system Description of CEE system Present situation – consumption, generation, energy, power balance Present situation – consumption, generation, energy, power balance Scenarios for each TSO – consumption/generation Scenarios for each TSO – consumption/generation Synthesis of consumption/generation Synthesis of consumption/generation

Transmission plan - structure International interconnections International interconnections Present situation - interconnection lines, NTC, historical exchanges, auction an market coupling Present situation - interconnection lines, NTC, historical exchanges, auction an market coupling National comments to market development and exchanges National comments to market development and exchanges Development of interconnections Development of interconnections Transmission network development Transmission network development Individual TSO network development Individual TSO network development Appendices – list of all projects in CEE region Appendices – list of all projects in CEE region Map of all projects in region Map of all projects in region Individual TSO’s development maps Individual TSO’s development maps

Transmission plan - examples

Transmission plan – main outcomes CEE TP CEE TP TP for 8 TSO over the next 13 years TP for 8 TSO over the next 13 years 55 projects with effect on CEE TS 55 projects with effect on CEE TS Prepared in accordance with each individual TSO TP in the CEE Prepared in accordance with each individual TSO TP in the CEE TP complies with the requirements imposed to TSOs in accordance with Statutory Instrument 445 (2000), EC (Internal Market in Electricity) Regulations, TP complies with the requirements imposed to TSOs in accordance with Statutory Instrument 445 (2000), EC (Internal Market in Electricity) Regulations, Integration of European Market Integration of European Market Contradictory requirements - maximizing security and minimizing the total cost Contradictory requirements - maximizing security and minimizing the total cost A lot of uncertainties on the locations, on the amounts of future generation units and on the associated transmission needs A lot of uncertainties on the locations, on the amounts of future generation units and on the associated transmission needs

Transmission plan – main outcomes CEE transmission development CEE transmission development Prolongation of time required to commission new grid equipments Prolongation of time required to commission new grid equipments Difficult assessment of the future congestions Difficult assessment of the future congestions Volatility of inputs – applications for connection, energy exchanges, legislation framework … Volatility of inputs – applications for connection, energy exchanges, legislation framework … Resulted in greater uncertainties of future TD and considerably increasing number of scenarios Resulted in greater uncertainties of future TD and considerably increasing number of scenarios TP & future TP & future First document that of the TD in the CE region First document that of the TD in the CE region Based on the individual TP and TSOs bilateral studies Based on the individual TP and TSOs bilateral studies Proposal – update every two years, future extension by regional study and analysis? Proposal – update every two years, future extension by regional study and analysis?

Other issues - plan for 2008 Acting as UCTE coordinated development regional forum Acting as UCTE coordinated development regional forum  Coordination of building the first planning database  Following and commenting materials working out in UCTE WG – authorization procedures, priority projects selection, planning policy in UCTE Important projects and trends in region Important projects and trends in region  Information exchange, discussion and analysis  Determination of side effects on the other TSOs  Coordination of developments plan in CEE region Experience sharing in the field of TD Experience sharing in the field of TD  Market development and its influence on TS  Grid planning procedures, planning approaches  Legislation, coming changes of TS devel. due to EU

Thanks for your attention.