Sarah Callaghan 1, Eric Guilyardi 2, Charlotte Pascoe 3 and the Metafor Project Team 1 BADC- UK, 2 University of Reading, UK.

Slides:



Advertisements
Similar presentations
DRIVER Step One towards a Pan-European Digital Repository Infrastructure Norbert Lossau Bielefeld University, Germany Scientific coordinator of the Project.
Advertisements

Joint Information Systems Committee Digital Library Services BL/JISC Workshop Rachel Bruce JISC Programme Director The Digital Library and its Services,
Achieve Benefit from IT Projects. Aim This presentation is prepared to support and give a general overview of the ‘How to Achieve Benefits from IT Projects’
ESGF and ES-DOC Documenting climate models and their simulations ES-DOC current and future plans Working with ESGF Eric Guilyardi, Balaji, Cecelia DeLuca,
The Role of Environmental Monitoring in the Green Economy Strategy K Nathan Hill March 2010.
Metadata Development in the Earth System Curator Spanning the Gap Between Models and Datasets Rocky Dunlap, Georgia Tech.
Information Modelling MOLES Metadata Objects for Linking Environmental Sciences S. Ventouras Rutherford Appleton Laboratory.
ASCR Data Science Centers Infrastructure Demonstration S. Canon, N. Desai, M. Ernst, K. Kleese-Van Dam, G. Shipman, B. Tierney.
Kellan Hilscher. Definition Different perspectives on the components, behavioral specifications, and interactions that make up a software system Importance.
December 2008 MRC Data Support Services (DSS) Chris Morris 13 th February 2009 Sharing Research Data: Pioneers, Policies and Protocols The seventh cat.
e-Framework Components and Responsibilities.
Connect communicate collaborate View on eResearch 2020 study Draft report on “The Role of e-Infrastructures in the Creation of Global Virtual Research.
TRAINS – Railway Vehicle and TRACK System Integration the MANCHESTER METROPOLITAN UNIVERSITY TRAINS – Railway Vehicle and TRACK System Integration the.
PPA 502 – Program Evaluation
Iterative development and The Unified process
US GPO AIP Independence Test CS 496A – Senior Design Team members: Antonio Castillo, Johnny Ng, Aram Weintraub, Tin-Shuk Wong Faculty advisor: Dr. Russ.
METAFOR and the role of standards To be presented at First DRIVER Summit SUB Göttingen, 16th-17th January th e-Infrastructure Concertation Event.
Release & Deployment ITIL Version 3
What is Business Analysis Planning & Monitoring?
Chapter : Software Process
Eric Guilyardi (LOCEAN/IPSL and Univ. Reading) and the Metafor team Common Metadata for Climate Modelling Digital Repositories IS-ENES kick-off meeting.
UML - Development Process 1 Software Development Process Using UML (2)
Centre for Earth Systems Engineering Research Infrastructure Transitions Research Consortium (ITRC) David Alderson & Stuart Barr What is the aim of ITRC?
1 Eric Guilyardi and the Metafor team Common Metadata for Climate Modelling Digital Repositories Metafor Dissemination Workshop Abingdon, 14 March 2011.
IS-ENES [ees-enes] InfraStructure for the European Network for Earth System Modelling IS-ENES will develop a virtual Earth System Modelling Resource Centre.
Engineering, Operations & Technology | Information TechnologyAPEX | 1 Copyright © 2009 Boeing. All rights reserved. Architecture Concept UG D- DOC UG D-
The Digital Library for Earth System Education: A Community Resource
CORDEX Scope, or What is CORDEX?  Provide a set of regional climate scenarios (including uncertainties) covering the period , for the majority.
Metafor Year 2 review: 29 th April 2010 Work Package 7 – Training and Dissemination.
CIM – The Common Information Model in Climate Research
NE II NOAA Environmental Software Infrastructure and Interoperability Program Cecelia DeLuca Sylvia Murphy V. Balaji GO-ESSP August 13, 2009 Germany NE.
Preserving the Scientific Record: Preserving a Record of Environmental Change Matthew Mayernik National Center for Atmospheric Research Version 1.0 [Review.
INTERNATIONAL LABOUR ORGANIZATION Conditions of Work and Employment Programme (TRAVAIL) 2012 Module 13: Assessing Maternity Protection in practice Maternity.
Colour of Ocean Data, Brussels, November 2002 Colour of Ocean Data: Discussion Panel Lesley Rickards British Oceanographic Data Centre.
Commissioning Self Analysis and Planning Exercise activity sheets.
Grundtvig Learning Partnership Project TeachingFlex.
Monitoring public satisfaction through user satisfaction surveys Committee for the Coordination of Statistical Activities Helsinki 6-7 May 2010 Steve.
Questionnaire Project Plan Alpha development Beta development Release for CMIP5 approval Production Phase After CMIP5 Questionnaire 01 Jan 2010 – 30 Dec.
Principle Investigator : Eric Guilyardi IPSL/Reading Lois Steenman-Clark NCAS, University of Reading Leader of METAFOR Work Package 2 GO-ESSP Seattle 2008.
Bob Jones Technical Director CERN - August 2003 EGEE is proposed as a project to be funded by the European Union under contract IST
GBIF Mid Term Meetings 2011 Biodiversity Data Portals for GBIF Participants: The NPT Global Biodiversity Information Facility (GBIF) 3 rd May 2011.
Strengthening the Science-Policy Platform on Biodiversity and Ecosystem Services Africa Consultation on IPBES May 2010 Nairobi, Kenya Peter Gilruth,
- Vendredi 27 mars PRODIGUER un nœud de distribution des données CMIP5 GIEC/IPCC Sébastien Denvil Pôle de Modélisation, IPSL.
Nature Reviews/2012. Next-Generation Sequencing (NGS): Data Generation NGS will generate more broadly applicable data for various novel functional assays.
Portable Infrastructure for the Metafor Metadata System Charlotte Pascoe 1, Gerry Devine 2 1 NCAS-BADC, 2 NCAS-CMS University of Reading PIMMS provides.
Chapter 6 CASE Tools Software Engineering Chapter 6-- CASE TOOLS
Alison Pamment 1, Steve Donegan 1, Calum Byrom 2, Oliver Clements 3, Bryan Lawrence 1, Roy Lowry 3 1 NCAS/BADC, Science and Technology Facilities Council,
1 Accomplishments. 2 Overview of Accomplishments  Sustaining the Production Earth System Grid Serving the current needs of the climate modeling community.
Sarah Callaghan 1, Gerry Devine 2, Eric Guilyardi 3, Bryan Lawrence 1, Charlotte Pascoe 1, Lois Steenman-Clark 2 and the Metafor Project Team 1 NCAS-BADC;
MICS Data Processing Workshop Multiple Indicator Cluster Surveys Data Processing Workshop Overview of the MICS Process.
Earth System Curator and Model Metadata Discovery and Display for CMIP5 Sylvia Murphy and Cecelia Deluca (NOAA/CIRES) Hannah Wilcox (NCAR/CISL) Metafor.
The Modeling Circle Courtesy M. Lautenschlager, DKRZ.
Preparation Plan. Objectives Describe the role and importance of a preparation plan. Describe the key contents of a preparation plan. Identify and discuss.
ESO and the CMR Life Cycle Process Winter ESIP, Jan 2015 ESDIS Standards Office (ESO) Yonsook Enloe Allan Doyle Helen Conover.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI EGI strategy and Grand Vision Ludek Matyska EGI Council Chair EGI InSPIRE.
Statistical process model Workshop in Ukraine October 2015 Karin Blix Quality coordinator
Software Design Process. What is software? mid-1970s executable binary code ‘source code’ and the resulting binary code 1990s development of the Internet.
Metafor Year 3 EU Review CIM Component Services. Of itself an Ontology is an inert artefact, i.e. a dictionary. CON-CIM Conceptual CIM.
1 This slide indicated the continuous cycle of creating raw data or derived data based on collections of existing data. Identify components that could.
Intentions and Goals Comparison of core documents from DFIG and Publishing Workflow IG show that there is much overlap despite different starting points.
An Approach to Software Preservation
aspects of archive system design
CMIP5 Questionnaire Roadmap – beta
Programme Board 6th Meeting May 2017 Craig Larlee
Overview of working draft v. 29 January 2018
DRIVER Digital Repository Infrastructure Vision for European Research
School of Information Studies, Syracuse University, Syracuse, NY, USA
My name is VL, I work at the EEA, on EA, and particularly on developing a platform of exchange which aims at facilitating the planning and development.
Presentation transcript:

Sarah Callaghan 1, Eric Guilyardi 2, Charlotte Pascoe 3 and the Metafor Project Team 1 BADC- UK, 2 University of Reading, UK and IPSL, France; 3 BADC- UK Climate model results for scientists, governments and the private sector. More people than ever now have a need to discover the results of climate models in order to prepare for and mitigate against the potentially severe impacts of global climate change. But climate modelling is a complex process, which requires accurate and complete metadata (data describing data) in order to identify, assess and use the climate data stored in digital repositories. Simulations have a key role in constructing understanding and producing predictions in climate science. But it can be difficult to discriminate between two simulations, even when you were responsible for producing them! Existing documentation currently revolves around (at best) the runtime, but not the scientific detail and relevance of the model components. There is little or no documentation of the “simulation context” (the whys and wherefores and issues associated with any particular simulation). Metafor Goals The Metafor project seeks to address the fragmentation and gaps in availability of metadata as well as duplication of information collection, and problems of identifying, accessing or using climate data that are currently found in existing repositories. To do this the main objective of Metafor is to develop a Common Information Model (CIM) to describe climate data and the models that produce it in a standard way, and to ensure the wide adoption of the CIM. Metafor will also develop, deploy, and evaluate a prototype infrastructure that will allow key data and models to be discovered and compared between distributed. digital repositories. Metafor will optimize the way climate data infrastructures are used to store knowledge, thereby adding value to primary research data and information, and providing an essential asset for the numerous stakeholders actively engaged in climate change issues (policy, research, impacts, mitigation and private sector). The Metafor Team The Metafor team have developed strong international collaborations and working processes over the first two years of the project. The Metafor partners are: NCAS Climate, NCAS CMS. Reading University, UK (Coordinator: Dr Eric Guilyardi) NCAS BADC (STFC CEDA), UK (Project Manager: Dr Sarah Callaghan) CERFACS, France Models and Data, Max Planck Institute for Meteorology, Germany Institute Pierre-Simon Laplace, CNRS, France University of Manchester, UK Met Office, UK Administratia Nationala de Meterologie, Romania Météo France, CNRM, France CLIMPACT, France CICS, Princeton University, USA University of Cantabria, Spain Development of the Common Information Model (CIM) Climate modelling is a complex process with a wide degree of variability between different models and different modelling groups. To accommodate this, the CIM has been designed to be highly generic and flexible. We describe the climate modelling process simply as "an activity undertaken using software on computers to produce data." This has been described as separate UML packages (and, ultimately, XML schemas). Development of the CMIP5 Questionnaire The CMIP5 model documentation questionnaire is an ambitious metadata collection tool and will provide the most comprehensive metadata of any climate model inter-comparison project. However, completing the questionnaire will require a substantial effort from climate scientists. We hope the sense of ownership engendered by our interactive consultation strategy will motivate climate modellers to invest the time to ensure that the information gathered in the questionnaire becomes an invaluable resource for the whole community. Engagement with the Climate Modelling Community The controlled vocabulary captured in the mindmaps during these interviews was used to populate drop-down lists in the questionnaire and the structure of the mindmaps generated the tree navigator. The tree navigator shown on the left hand frame of the questionnaire screen shot, fig 1, allows users to get to any component of the model with ease. The use of mind maps allows feedback from scientists about the questionnaire content to be integrated quickly without exposing the questionnaire code. The controlled vocabulary lists and structure resulting from these interviews will eventually be governed independently from the Metafor project, providing a valuable resource for the climate modelling community. The questionnaire also allows users to enter descriptions of components which are not covered by the mindmaps. The mindmap driven sections of the questionnaire ensure that we collect a standardised set of metadata about each of the CMIP5 models but if users wish to describe their models in more detail then the questionnaire is flexible enough to allow them to do it. Additional terms entered by users will be used to populate the externally governed controlled vocabularies used by the Metafor Common Information Model (CIM) UML overview of the Metafor Common Information Model (CIM) METAFOR is funded by the EU 7th Framework Programme as an e-infrastructure (project # ) Metafor: Common Metadata for Climate Modelling Digital Repositories The Metafor team have been collecting controlled vocabulary from domain experts, via a series of interviews with climate modellers. The results of the interviews are interactively summarised in mind maps, allowing us to not only build up the lists of controlled vocabulary, but also build a structure for the way the information is collected. Metafor has been charged by the Working Group on Coupled Modelling (WGCM) via the Coupled Model Inter-comparison Project (CMIP) panel to define and collect model and experiment metadata for the CMIP Phase 5 (CMIP5) project. The core archive of model data produced by CMIP5 will be used for the next Intergovernmental Panel on Climate Change (IPCC) assessment, due in The Metafor team have developed a web-based questionnaire to collect information and metadata from the CMIP5 modelling groups on the details of the models used, how the simulations were carried out, how the models conformed to the CMIP5 experiment requirements and details of the hardware used to perform the simulations. The questionnaire is primarily a tool to document models in sufficient detail so that the CMIP5 data can be compared in a scientifically meaningful way. An essential aim of Metafor is that the conceptual model is not changed by the manner in which it is used or applied. Hence multiple application models (APPCIM) can be created using different techniques, but still refer to the same conceptual model (CONCIM). The CIM is at the heart of the Metafor project. Development of the CIM has involved all the project partners and significant input from other climate modelling groups in Europe and the US. Further information about the Metafor project can be found at If you have any comments or questions about Metafor, the CIM or the CMIP5 questionnaire we’d love to hear from you! Screen shot from the Beta4 release of the CMIP5 model documentation questionnaire showing a metadata entry page for describing the Atmosphere Key Properties component of a model.